Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions.

Slides:



Advertisements
Similar presentations
Council Rock High School South Brad Kirkham Structures Council Rock High School South Northampton Township Council Rock High School South Brad Kirkham.
Advertisements

| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Jonathan E. Aberts Spring 2009
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
601 New Jersey Avenue Alternative Materials Amber House Structural 601 New Jersey Avenue Washington, D.C. Alternative Construction Materials Amber L. House.
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
 Building Statistics  State-of-the-Art Lab  Chief Medical Examiner  121,000 square feet  5 stories  $45 million project.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
University of Delaware Center for the Arts Newark, DE Karen Schulte Mechanical Option Spring 2006.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Student Health Center Jacob Brambley - AE (structural option)
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Taylor Hall George Mason University Fairfax, VA Advisor: Ed Gannon Introduction Prevention through Design Façade Re-design for PtD Stick-Built vs. Infinity.
Pearl Condominiums Philadelphia, PA
David Anderson Mechanical Option
Redifer Commons Addition & Renovation Project
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Justin Pennycoff AE Senior Thesis 2008 Construction Management
North Shore at Canton The Pennsylvania State University
RiverView Condominiums II Chicago, IL
Presentation transcript:

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Interstitial Space Design in Modern Laboratories A Research Review and Case Study of St. Jude Children’s Research Hospital cGMP Laboratory Facility in Memphis, TN Sandra L. Vondrak Integrated BAE/MAE CM Emphasis – Dr. Riley Architectural Engineering Thesis The Pennsylvania State University April 15, 2003

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Presentation Outline Introduction –Interstitial Space Design –Goals of Research and Case Study Research Findings Case Study: St. Jude cGMP Facility –Architectural Considerations and Redesign –Structural Considerations and Redesign –Mechanical Considerations and Redesign –Other Considerations –Construction Management Analysis Summary and Conclusions

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion Interstitial Space Design Definition –A fully accessible walk-through space above a ceiling and beneath the floor above, devoted to MEP distribution Main Advantages –Ease of Maintenance –Reduced Life Cycle Costs –No Disruption to Working Spaces –Energy Efficient, Flexible, Modular Design –Overlapped Trades During Construction –Easier MEP Zoning and Coordination Sandy Vondrak AE Senior Thesis

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Interstitial Space Design Conventional (left) vs. Interstitial (right) Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion Sandy Vondrak AE Senior Thesis

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Importance & Goals Importance –Healthcare/Laboratory markets growing –Rapid technological advancements –Environmental awareness increasing Goals –Compare advantages and disadvantages –Find best solution for St. Jude case study –Use research and survey to determine: Industry attitude  pinpoint discrepancies Ideas and tips for interstitial projects Future research areas Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion Sandy Vondrak AE Senior Thesis

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Industry Survey Methodology –Eight question short answer survey by mail –Population – 260 designers and contractors Results –70 out of 260 surveys returned (27%) –52 of 70 know of interstitial design (74%) –23 of 52 work for companies that have done interstitial projects (44%) Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion Sandy Vondrak AE Senior Thesis

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Industry Survey Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Industry Survey Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Industry Survey Project Outcomes –Overall success (83%) –Unexpected positive “side-effects” (22%) MEP security and protection, increased productivity –Problems with penetrations (17%) Criteria for Using Interstitial Design –Building Type, Complexity, Flexibility, Access Survey Conclusions –Biggest disadvantage is first cost –Life cycle cost and disruption advantages almost completely overlooked –Success rates high Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Case Study: St. Jude cGMP Facility Building Background –$29 million, 65,000 ft 2 pharmaceutical facility –In-house R&D of pediatric cancer vaccines –BSL3, class 10,000 and 100,000 lab spaces –Part of St. Jude’s 10 yr. Campus expansion Project Team –Owner: St. Jude Children’s Research Hospital –Design-Build Firm: The Austin Co. Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion Sandy Vondrak AE Senior Thesis

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Architectural Considerations Interstitial Architectural Redesign –Add 4’ to 1 st and 2 nd floor plenum spaces Increased volume by 234,600 ft 2 (17.6%) Additional 6,232 ft 2 of glass and precast façade area (15%) –Used for estimating in CM analysis Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Architectural Considerations 1 st Floor Mech. 2 nd Floor 20’ 16’ Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Architectural Considerations 20’ 1 st Floor Mech. 2 nd Floor Architectural Conclusions –Meets Memphis zoning and height requirements –Minimal impact on surroundings/aesthetics Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Structural Considerations Options for Interstitial Construction –Catwalk - cheapest, least advantageous –Suspended - frequently used but introduces vibration and coordination problems –Full Composite Floor - expensive, most advantageous Redesign –RAM Steel redesign for cGMP area only LRFD design 40 psf live load (ASCE 7-98) – similar to maintenance catwalk 3 ¼” light weight concrete slab on 2” deck Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Structural Considerations Other Structural Issues –Column size increases –Foundation size increases –Seismic and wind loads change Structural Conclusions –Main cost increase –Room for cost savings and value engineering in floor selection and frame layout –Design issues are minimal if interstitial design is selected initially Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Mechanical Considerations Mechanical Advantages –MEP Zoning and Coordination Efficiency and modularity in design –Maintenance and Operations Increased productivity and little to no disruption Conventional Interstitial Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Mechanical Considerations Additional Building Loads –HAP Analysis 5’ existing plenum compared to 9’ interstitial space Equipment loading the same in both scenarios Lighting and occupancy allowance in interstitial –Analysis Results Difference of 5.2 tons between scenarios – makes up only 1% increase in total building load Mechanical Conclusions –Not a significant increase in building load –Efficiency of design, modularity and other advantages far outweigh any load increases Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Other Considerations Lighting/Electrical –Similar to other maintenance areas –Interstitial design has a minimal direct effect on lighting and electrical systems Fire Protection –Research shows no problems with fire codes –Surveys show a need for additional fire dampers due to penetrations Acoustics –Depends on floor system selected –Isolation of MEP systems may reduce noise Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Construction Management Analysis Value Engineering –Research shows interstitial design improves quality, schedule and safety without increasing cost Constructability Overview –Overlap MEP and finishing trades Research shows 10 – 20% decrease in schedule 10% decrease found in St. Jude study –Trade zoning and coordination much easier –Safer construction working off the ground –Significant productivity increases Research shows 10-30% increase in productivity Conservative 10% used in St. Jude case study Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Construction Management Analysis Schedule Impacts –Additional Floor Construction Adds 30 days to schedule –Increased Productivity Allowance of 10% Saves 24 days total from interstitial MEP trades –Overlapped Trades Saves 21 days per floor or 42 total Interstitial Space Laboratory Space Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Construction Management Analysis First Cost Impacts –Floor Structure - $178,248 –Façade - $146,872 –Vertical Components Allowance - $3,429 –General Conditions Savings $237,600 savings ($6,600/day for 36 days) –Owner’s Priorities Difficult to quantify Time is money – $4 million per month First to market – 80% market share Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Construction Management Analysis NegativesPositives - Extra $271, extra days online - Value of 1 st to market - Life or death cases - (Financing) First Cost Conclusion Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion Given this scenario, owners unanimously chose the interstitial space option!

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Construction Management Analysis Life Cycle Cost Impacts –Based on costs/revenue for similar facilities Maintenance and utility costs $1,000,000 revenue per month with estimated one month disruption per year ConventionalInterstitial Maint. Cost ($/sf/yr)$1.94$1.80 Utility Cost ($/sf/yr)$7.14$6.74 Util./Maint. (1 yr)$590,200$555,100 Revenue Loss (1 yr w/ Disruption) $2,000,000$125,000 Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Construction Management Analysis Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Summary and Conclusions A Promising CM Solution –Value engineering at its best Quality, Schedule, Safety and Cost St. Jude Case Study –Additional $271,315 in building costs mitigated by 36 day schedule savings –Best solution in both long and short terms Research –Increasing in popularity –Tremendous first and life cycle savings –Adaptable, flexible, energy efficient design –Future research – dispel misconceptions Sandy Vondrak AE Senior Thesis Introduction - Definition - Goals Research - Survey Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other Areas - CM Analysis Conclusion

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Acknowledgements God. Without Him, nothing is possible. My family and friends for their continued support. The Penn State Faculty My Advisor, Dr. Riley Dr. Hanagan, Dr. Ling, Dr. Messner, Dr. Thomas The Austin Company David Chicoine and Ty Weiss Pinto Patel, Michelle Schantz, Ron Smith, Jim Speicher Other Industry Professionals Rick Bolton of St. Jude Children’s Research Hospital Robert Cowan and Guy Ott of the FHCRC Howard Reel and Jack Grinnalds of Johns Hopkins Leif Rolfson of Abbott Laboratories Lloyd Siegel, FAIA of the Dept. of VA The 70 companies who responded to the survey

Introduction - Definition - Controversy - Goals Case Study - Bldg. Intro - Architectural - Structural - Mechanical - Other - CM Analysis - Conclusions Research - Existing Info. - Survey Conclusion Any Questions?