A. Perin, CERN, TE-CRG, 26 May 2011 1 Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.

Slides:



Advertisements
Similar presentations
Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN.
Advertisements

Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
New HV test specification for the LHC N. Catalan for the EI section.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Review of the Cryogenic By-pass for the LHC DS collimators Ph. Lebrun on behalf of the Review Committee CERN, Kjell Johnsen auditorium 26 May 2011.
CRYOGENICS AND POWERING
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 DS Collimators at IR3: mechanical engineering and design LHC Collimation Upgrade Review Alessandro Bertarelli, Alessandro Dallocchio, Delio.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
HC review, A. Perin, 12-MAY DFB Project LHC hardware commissioning review May 2005 Hardware commissioning of the DFBs and DSLs and connection.
12th HL-LHC Parameter and Layout Committee meeting.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Interconnection work for the the QRL cryogenic extensions Ivo Slits - AT/CRI
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Interconnections Cryogenic Extensions and DSL Ivo Slits - AT/MCS
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Integration options for collimators in the DS zones V.Parma, CERN, TE-MSC With contributions/input from: V.Baglin, A. Bertarelli, M.Karppinen, H.Prin,
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
MPE Workshop for LS1 / 22 & 23 Nov  DFB Instrumentation Upgrade  Cabling Issues  R2E Consolidation  Current Lead Insulation Project  DFB Instrumentation.
A. Perin TE-CRG, 06 April LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs A. Perin, TE-CRG.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
Cryomodule test stand at ESS site
Project overview, boundary conditions, configuration, cost & schedule
SLHC –PP WP6 LHC IR Upgrade - Phase I.
IT-4189 Supply and installation of a cryogenic distribution system
BA6 – crab cavity activities in EYETS
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
Update of cryogenic activities
SPS cryogenic proximity equipment and SM18 validation
LS1 Committee January 24th, 2014
Comparison between 1) HL-LHC BASELINE: Q5 at point 6 at 1
Keeping LHC cold during LS periods Preliminary proposal
Hollow e- lens, Cryogenic aspects
From Design to Installation courtesy R. Folch S. Atieh TS / MME
The 11T cryo-assembly: summary of design and integration aspects
TEST PLANS for HL LHC IT STRING
LHC Machine Advisory Committee Meeting no. 19, June 2006 DFB status
HL-LHC - WP15 modifications Coffrets Prise C4L8
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic extensions A.Perin, N. Veillet, TE-CRG and contributions of many others…

A. Perin, CERN, TE-CRG, 26 May Outline Cryogenic extensions Modifications of the DFBs and related equipment Modification of the superconducting link (DSLC) Scope: TE-CRG activities (not included: cabling, transport, interconnections, electrical proximity equipment components and assembly) Design and production of jumper extensions Design and production of components for the modifications of the DFBAs Design and production of the proximity equipment frames and warm helium piping Design and production of the DSLC components & tooling for shortening Installation of the jumper extensions (without interconnection to QRL) an their supports Modification of the DFBAs to accommodate jumper extensions Shortening of the DSLC (cryo piping) All leak tightness and pressure tests for the DFBAs & DSLs prior to connection to the continuous cryostat

A. Perin, CERN, TE-CRG, 26 May Impact on cryo-equipement and DFBs V. Parma, TE-MSC

A. Perin, CERN, TE-CRG, 26 May Impact on cryo-equipement and DFBs V. Parma, TE-MSC

A. Perin, CERN, TE-CRG, 26 May Summary of impact on cryo-equipement and DFBs EquipmentModificationRemarks QRLNo change. Interface to QRL stays the same Jumpers to Q7 magnetsExtension to be added to compensate for shift (Q7 magnets)New jumper Jumpers to DFBAExtension to be added to compensate for shift DFBAsJumper connection to be modified because of jumper extension DFBAs proximity equipment Helium recovery piping Instrumentation + transformers, etc. Extension to the warm recovery line Modification due to interference with jumper extension Modification due to interference with the jumper extensions DSLCMust be shortened by 4.5 m

A. Perin, CERN, TE-CRG, 26 May DFBA current situation left side

A. Perin, CERN, TE-CRG, 26 May DFBA current situation right side

A. Perin, CERN, TE-CRG, 26 May Jumper extensions Functionalities Allow shifting of the magnets and DFBAs by 4.5 m Keep the same mobility as the original jumper No additional forces on the magnets and DFBA Limit the modifications to the magnets and DFBAs Constraints Very limited space in the tunnel Difficult integration with numerous equipment No screen cooling circuit available to the Q7 jumpers No modification of the cryogenic flowschemes Design Copy/paste from existing QRL extensions in IR2 Invar cold lines. Thermal screen cooled by conduction only Flexibility provided at the QRL jumper. Rigid connection to the magnet & DFBA Spring mounted supports in order to provide the freedom of movement and limit the forces to the magnets and DFBAs. Jumper on the Q7 magnet in IR3R Cryogenic extension in IR2R (Q6)

A. Perin, CERN, TE-CRG, 26 May Jumper extensions: IR3 Right View from transport side View from QRL side

A. Perin, CERN, TE-CRG, 26 May Jumper extensions: IR3 left View from transport side View from QRL side

A. Perin, CERN, TE-CRG, 26 May Jumper extensions for the Q7 magnets Special supports for displacement Requires rotation of 90° of magnet jumper with respect to original. Magnet jumper also higher by about 300 mm In IR3L, the jumper extension will be installed after the interconnection work in order to guarantee the best access for the intervention. Q7R3. View from transport side Q7L3. View from transport side supports

A. Perin, CERN, TE-CRG, 26 May Jumper extensions for the DFBAs Special supports for displacement Requires rotation of 45° of DFBA jumper with respect to original. Interference with “proximity equipment”: transformers, connection boxes, etc. DFBAF. View from transport side DFBAE. View from QRL side supports

A. Perin, CERN, TE-CRG, 26 May Moving the DFBAs Impact on the DFBAs Connection to the jumper extension requires a rotation of 45° of the DFBA jumpers an internal piping with respect to original: essentially completely rebuild the jumper. Interference with “proximity equipment”: transformers, connection boxes, etc: displacement of the proximity equipment No spare DFBA! Tentative sequence of interventions Open interconnection to Q7, disconnect the DFBA from the QRL, from WL and cabling Move DFBA in a safe place (possibly IP4). Re-use the installation tooling. Perform all modifications on the DFBA jumper Full leak and pressure test of the modified piping on the DFBA (+ electrical qualification) Transport the DFBA in the new location and reconnect

A. Perin, CERN, TE-CRG, 26 May Impact on the proximity equipment IR3L No space in current position because of jumper extension The transformers and connector boxes could be fitted on astructure above the switches The CL valves and piping mst also be relocated DFBAE. View from QRL side IR3R No space in current position because of jumper extension The transformers and connector boxes could be fitted on a structure above the switches The CL valves and piping could stay at the same position

A. Perin, CERN, TE-CRG, 26 May Modifications to the DSLC (superconducting link) Cut & shift by 4.5 m The DSLC needs to be shortened by 4.5 m Cable is 44 x 600A busbars Delicate operation but experience exists. Unique system. Tentative sequence (details being studied): Open and disconnect at the DLSC-DFBAF connection Open and disconnect at ceiling connection 40 meters from DFBAF Shorten the helium piping while preserving the SC cable on the DFBAF segment Reconstruct the interface flanges on the piping Install temporary sliding supports on the DSLC vacuum envelope Shift the DFBAF segment by 4.5 m to the new position Reconnect the DSLC Perform leak tighness & Hi Voltage tests on the DSLC before reconnection to the DFBAF Reconnect to the DFBAF + leak tests + electrical test DFBAF

A. Perin, CERN, TE-CRG, 26 May Planning and strategy Production & installation strategy In-house detailed design Possible outsourcing for the production of the jumper extensions All tunnel operations under direct supervision of CERN. Planned milestones End of 2011: completion of detailed design 2012: production of the components and assemblies. End of 2012: all jumper extensions, components for interconnection and other parts available 2013, coordinated with the other LS activities, installation in the tunnel Estimated duration of tunnel operations & constraints (CRG operations only) Installation of jumper extensions: 2 weeks / extension. Installation performed after magnet interconnections. Disconnection of DFBA from WRL: 2 days / DFBA Modification of the jumpers of DFBA: 3 weeks/DFBA Shortening of the DSLC: 2 weeks to disconnect and shorten + 2 weeks to reconnect Current status Integration and main parameters defined for the jumper extensions Integration study ongoing for frames Detailed design started for the modification of the DFBA jumpers Work on modification of DSLC not started yet

A. Perin, CERN, TE-CRG, 26 May Estimated resources and costs (CRG tasks) CRG tasks Design and production of jumper extensions Design and production of components to modifications of the DFBAs Design and production of the proximity equipment frames and warm helium piping Design and production of the DSLC components & tooling for shortening Installation of the jumper extensions (without interconnection to QRL) an dheir supports Modification of the DFBAs to accommodate jumper extensions Shortening of the DSLC All leak tightness and pressure tests TE-CRG Resources Total (FTE) Engineers Draftsmen FSU 0.5 Activity Total (kCHF) Cryo Ext DFBA moving (incl. frames) DSLC shortening Grand total Estimated costs for TE-CRG activities (for installation in 2013)

A. Perin, CERN, TE-CRG, 26 May Conclusions The studies performed show that the modifications to the jumpers and to DFBAs and DSLs in order to introduce the collimators/cryo-bass in IR3 are feasible during the long shudtown of No showstopper has been identified The jumper extensions can be based on validated existing design Moving the DFBAs requires to heavily modify the jumpers and some internal piping The proximity equipment (valves, piping, cables, transformers, connection boxes) must be relocated The preliminary study to shorten the DSLC shows that the best place to perform the operation is the first interconnection from 40 m from the DFBAF. Further studies are needed to precisely define the operation.