Ronald B. Achelpohl, PE Operation Green Light Mid-America Regional Council.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

Overview What is the National ITS Architecture? User Services
SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview
| 1 The Municipal Farm Sustainable Reuse Plan Project funded through a Brownfields Area-Wide Planning Pilot Grant from the United States Environmental.
1. We can’t promise all green lights… …but we can minimize the number of red lights, stops and delays.
Transportation’s Relation to Growth Management `.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
CALTRANS’ TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS CTP 2040 PAC 1 Kris Kuhl Assistant Division Chief, Division of Traffic Operations 4/15/2014 CREATING.
The Facts are In… updated >. Understand how it works See the results data Compare to other options Understand the investment.
Presented by: SAGE KAMIYA, P.E., PTOE
Los Angeles County Metropolitan Transportation Authority (Metro) Metro’s Countywide Signal Priority Program T3 Webinar January 22, 2008.
KC REGIONAL TRAFFIC SIGNAL COORDINATION. Agenda  National Perspective  OGL Video Overview  Mid – America Regional Council  Program Elements  What.
WINTER OPERATIONS COALITION Bill Hoffman, P.E. Nevada Department of Transportation - US Chief Maintenance & Operations Engineer
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
TRAFFIC SIGNAL MANAGEMENT. PURPOSE Purpose: Foster understanding through development of educational outreach materials Illustrate benefits and basic techniques.
The City of Gdynia City rights in 1926 With Sopot and Gdańsk forms the Tri-City agglomeration It has inhabitants Port city, employment structure:
Economic Analysis in Transportation Systems CE 7640: Fall 2002 Prof. Tapan K. Datta, Ph.D., P.E.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Gresham Traffic Signal System Optimization A Comprehensive Evaluation of Corridor Performance After Deploying Adaptive Signal Control.
Congestion Reduction Using Intelligent Transportation Systems Ben Sperry University of Evansville University of Evansville MESCON March 25, 2006.
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
May 22, 2003 ITSA Executive Networking Session #63 Hidden Text.
Rapid Transit System Steering Committee Meeting December 4, 2012.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Cross Town Improvement Project. Performance Metrics.
Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Overland Park Public Works Committee – Transit Update June 24, 2015.
Innovative ITS services thanks to Future Internet technologies ITS World Congress Orlando, SS42, 18 October 2011.
Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the Transportation Planning Board Michael.
Early Implementation of Coalition Initiatives ARK-LA-TEX Rail Summit May 9, Transportation Department North Central Texas.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
The Fully Networked Car Geneva, 4-5 March Ubiquitous connectivity to improve urban mobility Hermann Meyer ERTICO.
September 6, 2011 Summerville Chamber Public Policy Committee.
Progress on Board Priorities Denver Regional Council of Governments February 23, 2007.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
1 Transportation Systems Management & Operations A New Paradigm for the 21 st Century Transportation Department Group 3 3 Notches Above the Rest.
Action 2020 Training Local Context August 15, 2012.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Presentation title | Date. Who We Are Building a Healthier Heartland (BHH)  Super-coalition of local and national partners that promotes policy, systems.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
Traffic Management System Status Update February, 2008.
KC REGIONAL TRAFFIC SIGNAL COORDINATION. ABOUT MARC  Council of Governments  Metropolitan Planning Organization  Programs Aging Services Early Education.
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
LES Policy and Practice Seminar Royal Horticultural Halls & Conference Centre London SW1P 2PE 12 May 2009 Ogo Osammor Air Quality Officer Sheffield City.
Kansas City Regional ITS Architecture Ron Achelpohl, PE Assistant Director of Transportation Mid-America Regional Council September 29, 2005.
US-169 / I-70 “North Loop” Planning Environmental Linkages Study Pre-Proposal Workshop.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
TRANSPORTATION PROGRAMS MAG Commuter Rail Strategic Plan Transportation Policy Committee December 12, 2007.
Dig Once (with Many Partners) The Dakota County Broadband Network State Broadband Task Force June 15, 2016.
Expertise SR 710 North Study An Evaluation of the DEIR/EIS Presentation to the City of San Gabriel City Council February 2, 2016 Leland C Dolley, Special.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure  Dealing with Traffic Growth &  Considering the needs of all Road Users.
Reducing Idling Times of Vehicles Along a Busy Corridor – A Case Study (City of Burnaby) Michael Cetnarowski, P.Eng. DMD & Associates Ltd.
2016 APTA Sustainable and Public Workshop COTA’s Role in Smart City Columbus Implementation July 25, 2016 Michael L. Bradley Vice President of Planning.
Summit County – Canyons Employee Housing
2016 APTA Sustainable and Public Workshop COTA’s Role in Smart City Columbus Implementation July 25, 2016 Michael L. Bradley Vice President of Planning.
ITE Midwestern District Conference June 20, 2017
Welcome to Newcastle – Newcastle Connected Corridor
2019 CCIM BREAKFAST MEETING
TSMO – What Does It Mean for Planners?
Presentation transcript:

Ronald B. Achelpohl, PE Operation Green Light Mid-America Regional Council

A project to improve the coordination of traffic signals on major routes throughout the Kansas City area. A project to improve the coordination of traffic signals on major routes throughout the Kansas City area. What is Operation Green Light?

1.7 million people 1.7 million people 3800 Sq. Miles 3800 Sq. Miles 8 Counties 8 Counties 115 cities 115 cities 2 states 2 states Kansas City Region

Operation Green Light: Regional Context Air Quality Planning (1990’s) Air Quality Planning (1990’s) Kansas City Scout ( ) Kansas City Scout ( ) MoDOT/KCMO Study ( ) MoDOT/KCMO Study ( ) Shawnee Mission Parkway ) Shawnee Mission Parkway ) Feasibility Study ( ) Feasibility Study ( ) CMAQ Eligibility (1998) CMAQ Eligibility (1998)

Operation Green Light: Vision Seamless Transportation System Without Jurisdictional Boundaries

Reduce: Air Pollution Air Pollution Operation Green Light: Mission

Reduce: Air Pollution Air Pollution Vehicle Stops Vehicle Stops Operation Green Light: Mission

Reduce: Air Pollution Air Pollution Vehicle Stops Vehicle Stops Delays Delays Operation Green Light: Mission

Reduce: Air Pollution Air Pollution Vehicle Stops Vehicle Stops Delays Delays Fuel Consumption Fuel Consumption Operation Green Light: Mission

Reduce: Air Pollution Air Pollution Vehicle Stops Vehicle Stops Delays Delays Fuel Consumption & Fuel Consumption & Driver Frustration Driver Frustration Operation Green Light: Mission

Operation Green Light Strategies Upgrade Hardware Upgrade Hardware Cooperative Relationships Cooperative Relationships Communication Networks Communication Networks Regionally Optimized Signal Timing Regionally Optimized Signal Timing Operation Green Light: Strategies

Overland Park Prairie Village Mission Olathe Merriam Lenexa Leawood Shawnee Gladstone Westwood Unified Govt/Kansas City, KS Independence Fairway Kansas City, MO Lee’s Summit Liberty MoDOT North Kansas City Raytown KDOT Project Partners

Committee Structure

Priority Corridors

Priority Corridors Project Funding CMAQ $8.2 M STP $2.1 M ITS Integration $0.4 M KDOT ITS $0.2 M Local $2.2 M Current Total $13.1 M

Priority Corridors Project Budget System Integration $3.4 M Engineering $1.3 M Communications $4.8 M New Controllers $1.7 M Operations $1.5 M/yr. Current Total $13.1 M

Priority Corridors Project Tasks System Integrator System Integrator TransCore team underway TransCore team underway Communications Design Communications Design Olsson Associates team underway Olsson Associates team underway Controller Upgrade Design Controller Upgrade Design Kimley-Horn team selected Kimley-Horn team selected Construction Phase Construction Phase Operations Phase Operations Phase Pilot Timing Projects Initiated Pilot Timing Projects Initiated

Pilot Signal Optimization Project Barry Road in Kansas City, MO 10 Signals 1 Mile ADT 22,000 VPD Pilot Signal Optimization Project

Speed Profile: Before

Speed Profile: After

Benefits: Travel Time Morning Peak – 27% reduction (45 sec) Morning Peak – 27% reduction (45 sec) Noon Peak – 38% reduction (74 sec) Noon Peak – 38% reduction (74 sec) $.75 savings per trip $.75 savings per trip

Benefits: Travel Speed Morning Peak – increased by 39% Morning Peak – increased by 39% Noon Peak – Increased by 62% Noon Peak – Increased by 62%

Benefits: Fuel Consumption Morning Peak – 20% reduction Morning Peak – 20% reduction Noon Peak – 26% reduction Noon Peak – 26% reduction $0.06 savings per trip $0.06 savings per trip

Benefits: Vehicle Emissions Morning Peak – 19% reduction Morning Peak – 19% reduction Noon Peak – 21% reduction Noon Peak – 21% reduction

Benefits: Vehicle Stops Morning Peak – 68% reduction Morning Peak – 68% reduction Noon Peak – 86% reduction Noon Peak – 86% reduction $0.23 savings per trip $0.23 savings per trip

Daily/Annual Savings Performance Measures Daily Benefits Annual Benefits Vehicle hours of travel 33087,385 hours reduction Fuel consumption 35493,805 gallons decrease Time and fuel costs $ 7,640 $ 7,640 $ 2,024,657 $ 2,024,657savings Total pollutant emissions ,276 Kilograms reduction *Assuming that 22,000 vehicles are impacted daily.

Other Activities Coordinating with KCMO, Overland Park and Olathe Projects Coordinating with KCMO, Overland Park and Olathe Projects 2070 Firmware Selected 2070 Firmware Selected Negotiating Funding Agreements Negotiating Funding Agreements Negotiating Tower Leases Negotiating Tower Leases

Kansas City Scout Partnership Traffic Operations Center Traffic Operations Center Equipment Room Equipment Room Office Space Office Space MARC Offices MARC Offices

OGL Values Cooperation Cooperation Respect Respect Understanding Understanding Quality Quality Regional Framework Regional Framework Value Value Integrity Integrity Operation Green Light: Principles

Questions?