City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
Advertisements

Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Special Topics: Overlaps By Michael P. Dixon, Ph.D.
Flashing Yellow Arrows Joel McCarroll, Region 4 Traffic Manager on behalf of Edward L. Fischer State Traffic Engineer Oregon Department of Transportation.
Fixed Time Signal Coordination
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Safety at Signalized Intersections. Signalized Intersections FHWA Safety Focus Areas 2.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
Current Practices in Traffic Signal Coordination
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
CEE 764 – Fall 2010 Topic 7 Special Issues on Signal Coordination.
MICHIGAN DEPARTMENT OF TRANSPORTATION Davison TSC
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
SIGNAL SYSTEMS AND SUBSYSTEMS Tapan K. Datta, Ph.D., P.E.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
INTRODUCTION TO TRANSPORT Lecture 4 Introduction to Transport Lecture 4: Signal Timing.
Gresham Traffic Signal System Optimization A Comprehensive Evaluation of Corridor Performance After Deploying Adaptive Signal Control.
Chapter 241 Chapter 25: Analysis of Arterial Performance Know how arterial LOS is defined Be able to determine arterial classes Know how to determine arterial.
PASSER II SOFTWARE.
Traffic Signal Warrants
Signal Timing Design Example Problems. Intersection of Michigan Avenue and Hewitt Road.
CEE – Spring 2005 Lectures 16, 17 (Handouts, Chapter 24) Signal Timing and Coordination.
Lecture #11 Signal Coordination: Chapter 22. Objectives Factors affecting coordination Basic theory of signal coordination Application to arterial progression.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Javad Mirabdal, Jack Fleck & Britt Thesen Department of Parking and.
Transportation Engineering
Evaluating InSync Performance in Microsimulation Aleksandar Stevanovic, PhD, PE Florida Atlantic University Transpo 2012 Bonita Springs, FL October 29,
Alternative Solution ONE Changes Phases from 4 to 6 based on the traffic demand of different movements; Optimizes Timing accordingly to minimize the overall.
SE&A GTS – Ga r d n e r T ra n s p o r t a t i o n S y s t e m s © Siemens E&A, GTS Kittelson Associates, Inc. Protected Permitted Left Turn Displays NCHRP.
Travel Speed Study of Urban Streets Using GPS &GIS Tom E. Sellsted City of Yakima, Washington Information Systems and Traffic.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
Signal Warrants. Slide 2 Signal Warrants  r2/part4/part4c.htm r2/part4/part4c.htm.
Introduction to Transport
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
CEE 764 – Fall 2010 Topic 3 Basic Signal Timing and Coordination Principles.
Traffic Signal Timing Design Part I. Slide 2 Steps in Designing a Traffic Signal Timing Plan (1/2) 1. Determine lane configurations and lane volumes 2.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
Jason J. Siwula, PE – Safety Engineer HSIP HORIZONTAL ALIGNMENT SIGNING.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Visit Our Website at: Click to edit Master title style.
Assistant City Traffic Engineer
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
SUMMARY AND CONCLUSIONS
Lane Volume Allocation
Traffic Engineering Division Nestor A. Flores, P.E., PTOE
2a. Fully actuated signal - Improved T intersection
Irvine Traffic Research & Control Center (ITRAC)
Problem 2: Moe Rd/Route 146 Intersection
Highway capacity and Level of Service Analysis
Signal Timing: Putting it All Together
CE 3500 Transportation Engineering Saturation flow and signal LOS
Flashing Yellow Arrows for Permissive Left Turns – Is It for You?
CE 3500 Transportation Engineering Elements of Traffic Signals
School of Civil Engineering
Highway Engineering CE 431
Presentation transcript:

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road William Henry, P.E. Traffic Engineering Manager

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Protected Permitted Left Turns (PPLT) Provides drivers with the option to wait for a protected left turn when there are insufficient gaps or to make a left when there are available gaps to make the turn. PPLT increases efficiency over fully protected left turn phasing Approximately 30% of intersections in the US include PPLT phasing

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock PPLT Phasing Concerns PPLT phasing can cause a “Yellow Trap”. A yellow trap occurs when a driver waiting to make a permitted left turn sees the adjacent through phase turn yellow while the opposing green phase stays green.

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Correcting the Yellow Trap with the Dallas Display Dallas Phasing utilizes an exclusive left turn signal head with the green and yellow ball displays louvered to prevent adjacent lanes from seeing the signal indications The louvered display shows the opposing through indication instead of the adjacent through indication to eliminate the yellow trap

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Time Space Relationship Lead-Lag Operation corrects inefficiencies due to unfavorable spacing of traffic signals along the corridor Efficiency is improved when providing early releases to keep the main traffic platoon moving

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Project Location Rodney Parham Road – 2.6 mile Arterial

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Project Scope Coordinate 11 Signals Utilize Synchro for Initial Timings Implement Lead-Lag Left Turn Phasing using Dallas Display Develop System Cycle Length Optimize Cycle and Splits – Synchro Export Data to TSPPD Evaluate Time Space Diagram Solution Provided by Synchro

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Noon Peak Flows Shackleford 1427 WB 1258 EB Breckenridge 1181 WB 1074 EB Reservoir Rd 973 WB 915 EB Brookside 449 WB 1443 EB

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Synchro Solution

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Synchro Signal Progression 40 MPH Design Speed Balanced Noon Flows vehicle per hour flows Synchro Model only reduces intersection delays, does not look at arterial flows and the benefits of 2-way progression. Left Turn splits are excessive, and do not utilize the natural gaps in traffic produced by well designed traffic plans with ample 2-way green bands. Synchro optimized plan does not provide any significant through traffic bands.

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Designing Timing Plans Two-Way Progressive Flows Utilize Synchro TSPPD Base Plan as a Starting Point Drive Corridor to establish speeds Add dummy intersections at both end of the time-space-diagram to aid in developing true two-way progression With a 100 second cycle, plan for 35 second band widths in each direction for initial design. Analyze for lead-lag phasing to maximize band widths. Implement and Adjust Plan

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Adjusted 2-Way Plan

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Two-Way Progression Plan EB Green Band – 30 Second Band Width – 1427 VPH WB Green Band – 25 Second Band Width – 1258 VPH Install Texas Display at 3 intersections in order to run permissive lead-lag left turn phasing Natural Gaps generated throughout system Synchro recommended left turn times significantly reduced, which provides more green band time for the major movements

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Left Turn Split Reduction Examples Ark. Valley – Synchro 20 secs TSPPD Adjusted 10 secs I-430 West Side – Synchro 44 secs TSPPD Adjusted 15 secs I-430 East Side – Synchro 46 secs TSPPD Adjusted 18 secs

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Dallas Display Signal Head Louvered for the Leading Left Phase Direction

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Dallas Displays Doghouse 5-Section Signal w/louvers

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Dallas Display for Leading Movement Display Prevents Yellow Trap

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Breckenridge Overlaps for Dallas Displays

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Epac Overlap Programming for Breckenridge

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Eastbound on Rodney Parham – Noon Plan

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Westbound Rodney Parham – Noon Plan

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Completion of Timing Plan Plans are never complete, constant adjusting due to changing patterns Next Improvement scheduled ** Traffic Responsive **

City of Little Rock Public Works – Traffic Engineering Division City of Little Rock Contact Info Bill Henry