Gregory Crinum Mine 1 Programmable Electronic Roof/Rib Bolter Controls History Old Controls Advantages Roof Mapping New Controls Summary.

Slides:



Advertisements
Similar presentations
AUSTAR COAL MINE A2 MAINGATE ROADWAY DEVELOPMENT Experiences and Lessons Learned Presenter Glenn Sobey Development Mining Engineer Austar Coal Mine.
Advertisements

New Horizons Cybersoft Limited. CONTENTS Concept Behind Spot Billing Benefits of SBM(GPRS) GPRS enabled SBM advantages. SBM(GPRS) Billing Process Data.
Click on this image to open the full PDF document.
- Product Overview – The LMD DEFLECTOMETER ® Series Inductive Loop Detector Why guess when you can know! © Copyright EDI 2013.
Getting Started Product Description Setting Parameters How does it work Wiring Diagram.
Research Update Automated Bolting and Meshing Project - C17018.
Thermoforming Process
1 Metallurgical Coal EXPERIENCES FROM THE USE OF IN CYCLE TENDON SUPPORT Richard Campbell Principal Geotechnical Engineer Blackrock Mining Solutions.
Mike Marr Safety Consultant Specialist
ACARP KEY FINDINGS - DECEMBER 2006 BENCHMARKING STUDY Gary Gibson, ACARP.
Presented by Environmental Health and Safety
Efficient flexibility in room management with SAUTER EY-modulo.
Chapter 8 Prototyping and Rapid Application Development
DataLogger Operation - 1 DataLogger ® Operation Procedures.
Features of CNC Machining Centers
Hazards Analysis & Risks Assessment By Sebastien A. Daleyden Vincent M. Goussen.
T. Bajd, M. Mihelj, J. Lenarčič, A. Stanovnik, M. Munih, Robotics, Springer, 2010 SAFETY IN INDUSTRIAL ROBOTICS R. Kamnik, T. Bajd and M. Mihelj.
Equipment Familiarization Amatrol 850 Basic Hydraulic Training System
AccuMax Multi-Point Injection Mechanics
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
The machine is built to comply with the accident prevention, hygiene and electric standards in force. MODUL SERIES MODULAR DECK OVENS Control panel features:
Distribution System Control Strategies.  Tank Management/Operations  Flushing  Rerouting Water  Others  optimizing existing booster chlorination.
Computer Process Control Application. Computer process control In computer process control, a digital computer is used to direct the operations of a manufacturing.
Research Update Automated Bolting and Meshing Project.
ACARP Presentation Cutting A Smarter Metre Process optimisation techniques currently being utilised.
Lockout Tagout Tryout (LOTO)
Field-IQ System Boom Height Control. Benefits  Maintain boom height in uneven terrain  Reduce operator fatigue  Consistent spray tip height reduces.
1 PAC530 | Output Controller. 2 The Output Controller (PAC530) provides the local connection on an RS-485 network between an Access and Alarm Server (PAC500)
ACARP Roadway Development - Operators Workshop March 2008
Ergonomics and Workstation Design Space Requirements
1 ADA EZ Product Review Meeting Presented by Jay Vaitkus.
MODERN SURVEY (FAMILARISATION WITH EQUIPMENTS). Modern equipments EDM – Electronic distance measurement eqp. EDM – Electronic distance measurement eqp.
All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech University.
Joe Bateman, ISRI Safety 1 Machine Guarding. ISRI Safety 2 Introduction Machine guards are essential for protecting workers from needless and preventable.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
Chemical Engineering 3P04 Process Control Tutorial # 6 Learning goals 1.Learn basic principles of equipment in a control loop 2.Build understanding of.
MUD LOGGING DEFINITION, THEORY & LAG CALCULATIONS
Dec07-02: Prototype Parking Meter Phase 8 Bret Schuring: Team Leader Pooja Ramesh: Communications Wilson Kwong, Matt Swanson, Alex Wernli.
Automating Continuous Gas Lift
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
Montabert The Alternative Drifters replacement THE ALTERNATIVE
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Intelligent Boiler Sequencing
1 Beltana Development. 2 Beltana Overview Process Control Continuous Improvement Summary.
“ELMIZ” PJSC was found in 1996 as a results of “Kyiv Radio Plant” restructuring according to the decision of the Cabinet of Ministers of Ukraine. The enterprise.
DEVELOPMENT OF THE ABM25 POST CRINUM March 2007 Doing the basics better - West Wallsend, Crinum and Ulan.
May07-02: Parking Meter Clint Hertz: Team Leader Austyn Trace: Communications Nick Hollander Christian Baldus.
Valves In Industry (Part 1)
Front loaders boasting top performance Cold milling machines W 100 F, W 120 F, W 130 F.
The complete flow monitoring solution Measure – Display – Switch – Transmit.
CML 700i measuring light curtains Integrated interfaces and control unit for even simpler operation Leuze electronic | CML 700i product launch | Status:
Altivar 32 So slim, So smart!
Dr. Subhash Technical Campus
The piezoelectric generator consists of three units: 1. Piezoelectric block: Made of layers of piezoceramic elements – 1.1 (manufactured, for instance,
"Improvements in the Bolting Cycle Using Conventional Installation Methods" John Naylor – Queensland Technical Manager, Jennmar Harold Hinton – Queensland.
It’s…….
Automated Monitoring and Warning Systems Presented by Mark Johnston – PIMS Group Principal Engineer Dave Dowell – PITS Engineering Manager Introduction.
AUTOMATED DRILLING IN UNDERGROUND MINES
Features of CNC Machining Centers
Some features of a Stairlift
H-BRAKE Hybrid Serie.
Features of CNC Machining Centers
Computer Numerical Control
Automated Bolting and Meshing Project - C17018
Chapter 8 Prototyping and Rapid Application Development
Hazards Analysis & Risks Assessment
LOCKOUT/TAGOUT By: Kory Hildebrand.
Presentation transcript:

Gregory Crinum Mine 1 Programmable Electronic Roof/Rib Bolter Controls History Old Controls Advantages Roof Mapping New Controls Summary

Gregory Crinum Mine 2 History Crinum has been operating for nearly nine years now with three Joy continuous miners and in that time there have been many upgrades to the miners. Ie Supply Cassette system, Onboard ventilation, Rib Protection Platforms and the transformation of the machines from 12scm30 to 12cm32. With the Crinum roadway width of 4.8m we had to consider the overall length of the machine when making the machine change. The gathering and cutterhead were moved back approximately 400mm to keep the length to a minimum so break offs could be done with ease.

Gregory Crinum Mine 3 History With the front end of the machine moved back the roof bolter platform has been reduced in size. With the four ARO series 4000 bolters and Apitech controls the distance from the drill head to the operator is approximately 500mm and with that distance Crinum was experiencing a number of injuries whilst operating bolters.

Gregory Crinum Mine 4 History Reducing the number of strain injuries related to roof bolter. Team assembled in March 2000 to look at improving the efficiency of the bolting cycle. Ergonomics and work platform space were key areas to consider in the development of the new bolter controls. Specialist Engineering companies and the Crinum team developed and implemented an ‘Industry first’ concept of installing electro- hydraulic controls on the continuous miner.

Gregory Crinum Mine 5 History The equipment incorporates a semi automatic drilling and bolting process to improve the quality and consistency of the bolt installation cycle. Another aim of the system is to measure ‘The Specific energy of drilling’ providing data for site geotechnical engineers with information about immediate roof conditions. Installation was completed on the first machine in Oct 2002 and has been in operation since January 2003.

Gregory Crinum Mine 6 Old Controls Crinum roadway width is 4.8m this does not allow for large work platform area on the machine. Looking down on the old roof bolter controls and work platform area Minimum distance between the inside control valve and the body guard on the machine.

Gregory Crinum Mine 7 Old Platform Side view of the platform showing the limited space for two operators to work in.

Gregory Crinum Mine 8 Platform Comparisons

Gregory Crinum Mine 9 Operator on old Controls

Gregory Crinum Mine 10 OperatorOperator on new Controls

Gregory Crinum Mine 11 New Controls New Controls are ‘V’ shaped to allow better access to the bolter for the operator. The handle controls are for positioning the bolter only. Push button controls for the drilling and installation cycles. Minimum oil flow at the operator platform due to high flow oil valves being mounted on the bolter.

Gregory Crinum Mine 12 New Controls Push button controls are mounted above the handle controls allowing more room on the platform.

Gregory Crinum Mine 13 Push Button Control A Four line Lithium Crystal Display is mounted above the membrane buttons for programming functions, trouble shooting and to show which functions are being operated whilst in auto mode. Blue and green buttons are the auto functions and have to be pressed for 1 second before the operation starts. This was recognised by the team as a safety issue if inadvertently pressed.

Gregory Crinum Mine 14 New Controls The same software is utilised for the roof and rib bolters with adjustable parameters that the operators can adjust within limits. The parameter changes are for variations in chemical set and mix times, also for when a cuttable dowel is used instead of a steel bolt in the rib. There are 2 levels of security for any adjustments, the operator level and the supervisor level. The operator level is restricted to plus or minus 5 seconds of the setting the supervisor has set. The supervisor level has limits set-up in the software to restrict the amount of adjustment on all functions. There are only a small number of people onsite that have access to this option. All hydraulic pressures and times can be adjusted in this set- up.

Gregory Crinum Mine 15 Advantages Programmable Drilling Parameters- All functions can be adjusted to suit the roof / rib conditions. All bolters are individually adjusted to customise for the operator needs. Consistent Roof Bolt Installation- Repeats the bolt cycle installation identically every time with predetermined values. Reduces Operator Fatigue- Push buttons used instead of handles in drill and bolt function. Fast Learning Curve for new Operators- Less time for an inexperienced operator to become productive with less risk of injury or incorrect installation of bolt. Designed for high Availability - Bolter control components can be changed individually. Ie all parts are modular.

Gregory Crinum Mine 16 Advantages Capable of Mapping the Mine Roof - Records drilling parameters which are correlated to types of rock and anomalies. This information is available on the geotechnical engineers computer on the surface. Ergonomically Appealing Operators Platform - The platform allows for easy access to the drill heads and controls. Built in Diagnostics - The system includes diagnostics which enable an operator or tradesman to quickly find the source of the problem. Safety Interlocks - The rotation feedback governs the speed of the feed and automatically slows down if the drill steel is blocking. If the drill steel blocks the rotation and feed will automatically stop. No water flow through the steel will also stop the drilling cycle.

Gregory Crinum Mine 17 Advantages History of Roof Bolts - System will have provision to look at previously installed roof bolts to assist the operator to determine secondary support requirements. Reduced Number of Handles – Remaining handles are well protected from inadvertent operation and entanglement.

Gregory Crinum Mine 18 Roof Mapping Roof mapping is a measure of specific energy of drilling, and to gather this information the new controls on the outside rigs have been set-up with a pressure transducer and flow meter on both the rotation and feed circuits. The information gathered is fed up through the continuous miner power cable to a modem in the section transformer. Then transferred to the surface via Ethernet to a server where the information can be displayed on computers in the office, on the internet or on the machine itself.

Gregory Crinum Mine 19 Roof Mapping Crinum have a roof hazard map for all areas of the mine that shows the various roof strengths. The software has been designed to incorporate the hazard map and update the data onto the map on a shiftly basis. The data obtained through this will provide site geotechnical engineers with information about the immediate roof conditions and eventually enable calculation of empirical roof strength contours, optimisation of primary and secondary support in roadways and improve our understanding for future longwall mining risk.

Gregory Crinum Mine 20 Roof Mapping

Gregory Crinum Mine 21

Gregory Crinum Mine 22

Gregory Crinum Mine 23 Summary There have been no bolter related injuries since the machine has been operating. The team has achieved an ergonomically designed work platform well accepted by the operators. The electronic controls are working to expectation. Industry first in gathering data for roof mapping.