ROOF.

Slides:



Advertisements
Similar presentations
Pattern Rafters & Calculations Gable & Hipped Roof M.S.Martin Nov. 2005, Revised Feb
Advertisements

Roof Framing A Quick Primer
Ceilings & Basic Roofing
Flat Roofs & Introduction to Gable Roofs
HIP ROOFS Created BY Michael Martin July 2004 / revised may 2007.
Gable Roof BCGCA3007B.
Gable Roof BCGCA3007B.
Split Sole 45 Degree Raker
Framing Agriculture Structures
Direct Method Presentation
Unit 49 Intersecting Roofs
Basic Roof Types and Roof Theory
BCT 104 Construction Math Stair Calculations. Stair Codes Important Residential Stair Codes 1. The maximum stair riser is 8". The minimum is 4". 2. The.
Architectural Drawing
Unequally Pitched Roofs
2 Post Vertical Shore/Laced Post
RAFTER AND ROOF COMPONENT PARTS
Types of Roofs and Cutting Common Rafters Dr. David Agnew Arkansas State University.
Roof Framing Unit 33.
BCT 122 Roof Framing 1 Roof Framing Procedure Sequence.
L I M K O K W I N G I N S T I T U T E S C O L L E G E O F C R E A T I V E T E C H N O L O G Y Faculty of Architecture and the Built Environment Building.
Gable Roof BCGCA3007B. Gable Roof Flush with no eaves Flush with raked eaves Boxed.
Math Calculations For HERS Raters 1 Why Worry 2.
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
Gable, Gambrel, and Shed Roofs
Presentation 26: HIP RAFTER LAYOUT.
1 Presentation 19: RAFTER AND ROOF COMPONENT PARTS.
Lesson 9 Framing Agriculture Structures Next Generation Science/Common Core Standards Addressed!  CCSS.ELA Literacy Cite specific textual evidence to.
Creeper calculations, Rafter shortening and Pattern Rafter
Pattern Rafters & Calculations
Hip Rafters • Hip Jack Rafters • Constructing Hip Roofs
Competency: Draw roof plans
Copyright 2006 The National Association of Certified Home Inspectors
Broken Hip Roof.
Construct Pitched Roofs (Simple)
Roof Types, Components & Terminology
Roofing Materials Estimating. A square is used to describe an area of roofing that covers 100 square feet or an area that measures 10' by 10'. If we are.
Estimating Hip Roofs.
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Flat Roofs & Introduction to Gable Roofs Ref: M. S. Martin / March 2004 / Reviewed & Combined March 2007.
Roof and Ceiling Framing
Gable Roof BCGCA3007B.
Wall Framing Grimsby Secondary School Technology Dept.
Ag Construction Studs Vertical framing boards are called.
ET 201 – Architectural Drafting Dr. Dan Trent September 28, 2015
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
Roof Types, Components & Terminology
Copyright © Glencoe/McGraw-Hill Carpentry & Building Construction Laying Out a Common Rafter for a Gable Roof.
After the roof design is selected, the next decision is the type of roof construction-- trusses or stick built. Trusses. Less labor to install trusses.
National Center for Construction Education and Research Carpentry, Level 1 Copyright © by the NCCER, Published by Pearson Education, Inc. FIGURE 6- 1 Types.
Designing and constructing a traditional half span hipped end roof  Roof to a domestic extension.
Estimating Hip Roofs.
Construct Pitched Roofs (Simple)
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 8 Layout Tools and Procedures.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
ROOFING BCGCA3007B. Types of Roofs Problem No1 Calculate Underside of Beams Birdsmouth 30mm Rafter 140 x 45.
Competency: Draw roof plans
PATTERN RAFTER.
Framing Agriculture Structures
12 Chapter Roof Framing. 12 Chapter Roof Framing.
Construction Framing Mr. Brock.
Competency: Draw roof plans
Gable Roof BCGCA3007B.
Framing Agriculture Structures
Arch205 Material and building construction 1 floor & Roof systems
Rafter Marking Information Technology and Communication Services
Arch205 building construction floor & Roof systems
One Mathematical Solution
Competency: Draw roof plans
Competency: Draw roof plans
Presentation transcript:

ROOF

Roof Construction

Roof Framing After the roof design is selected, the next decision is the type of roof construction-- trusses or stick built. Trusses. Less labor to install trusses than to stick build roof. Factory built Better quality control Reduced construction cost Hauled to site and lifted into place Computers allow complex designs. Stick built Higher labor costs for complex roofs More variability in quality High level of skill required to produce complex rafters Requires more scaffolding and other supports for construction

Roof--Truss Different types of trusses can be used for roofs. The type used will be determined by the use of the building, size of the building and/or the owners preferences. Most trusses are custom built for the building. Trusses can be wood or metal Truss nomenclature: Rafters Gussets Webs Bottom Cord Posts

Types of Roof Trusses Different types of roof trusses are available. Truss manufacturers custom build trusses for each building Mono (single slope) Sheds attached to buildings Spans 20 to 30 ft Scissors Higher center clearance Spans 20 to 40 ft Fink Poplar efficient design Spans 20 to 50 ft Wowe Heavier ceiling loads than fink truss Spans 20 to 50 ft

Types of Roof Trusses--cont Pratt Used with or without ceilings Spans 20 to 60 ft Belgian Extended fink truss Spans up to 80 ft Bowstring Difficult to construct Spans 40 to 120 ft

Roof Pitch

Roof Framing-cont. Pitch Whether using roof trusses or stick building the roof, the pitch of the roof must be selected. Pitch is the slope of the roof. Roof pitch is indicated by a fraction(1/3, 1/4, Etc.) or slope triangle. When a fraction is used, it is the rise over the span. When a slope triangle is used, it is rise over run. What factors influence the best roof pitch for a building?

Roof Framing-cont. Pitch Problem Determine the rise for the rafter in the illustration for a 1/3 pitch.

Roof Framing-cont. Slope Triangle A triangle (slope triangle) is also used to indicate roof slope. A slope triangle indicates the rise/run. The slope triangle in the illustration indicates that for every 12 inches of run there will be 3 inches of rise. Because a ratio is used, the 3 and 12 can have any units as long as they are both the same. Three (3) feet & twelve (12) feet would have the same rafter slope as 3 inches and 12 inches. The use of the slope triangle reinforces the concept the a rafter is the hypotenuse of a right triangle.

Roof Framing-cont. Slope Triangle Problem Determine the rise for the rafter in the illustration.

Stick Build Rafters

Stick Built Rafter Terms A common rafter is the hypotenuse of a right triangle. The plumb cut is made so that the ends of two rafters will fit together. They are fitted flush when used in a rafter truss. A ridge board is used when the rafters are “stick built”.

Stick Built Rafter Terms-cont. The tail cut can be left several ways. Common types are:

Stick Built Rafter Terms-cont. The birds mouth is used to increase the contact area between the rafter and the top plate. Must not extend more than 1/2 way through the dimension of the board. Excessive depth can cause the rafter to split.

Stick Built Rafter Steps Four (4) steps in laying out a common rafter. Mark the angle at the ridge board end (plumb cut) of the rafter. Determine the rafter length. Mark the location and size of the birds mouth. Mark the angle of the rafter at the overhang.

Stick Built Rafter Step 1-Plumb cut The angle at the end of a rafter is determined by the pitch. The angle can be calculated in degrees and laid out with a protractor. Because a rafter is the hypotenuse of a right triangle, a framing square or a speed square can be used.

Stick Built Rafter Steps. Step One - Plumb Cut cont. Mark the plumb cut on the rafter. Place the 12 inch mark on the body of the square on one edge of the board. Rotate the square until the inches of rise is on the tongue of the square and on the same edge of the board. Mark along the edge of the tongue. In this example the rise per foot of run is 8 inches. Remember: the same edge of the square must be on the same edge of the board.

Stick Built Rafter Steps. Square Use Why are these two illustrations examples of incorrect square use? The square marks are on two different edges of the board. Opposite sides of the square are used. Does this illustration show correct use? Yes because both edges of the square are on the same edge of the board.

Stick Built Rafter Steps. Step Two - Determine the length The second step is determining the length of the rafter. The length is the distance from the peak of the roof to the outside edge of the top plate. One half the thickness of the ridge board must be deducted when it is used. The rafter length can be determined by calculation or by stepping. Determining rafter length by calculation: Pythagorean Theorem

Stick Built Rafter Steps. Example of Length by Calculation Determine the total length of a common rafter for a building with a span of 12 ft. 6 in. and a 1/3 pitch. The building will use a 2 x 6 ridge board and a 6 in. overhang. Answer: 8 ft Rafter rise = Rafter length = Subtracting 1/2 of ridge = Overhang rise = Length of overhang = Total length =

Stepping A Rafter

Rafter Length by Stepping The stepping process uses the rise and run. Works best with a span that is an even foot. Step a rafter for a building with a 12:8 slope and a 10 foot span. A building has eight (8) inches of rise per foot of run and the run is five (5) feet. It will use a 12 inch overhang. The square is aligned like making a plumb cut. In this case 12 and 8 are used. A line is drawn for the plumb cut and the 12 inch mark on the square is marked on the board.

Rafter Length by Stepping - Second Step The square is “stepped” along the board for each foot of run.

Rafter Length by Stepping - Third Step Process is continued until the width of the run is “stepped” off.

Rafter Length by Stepping - Fourth Step

Rafter Length by Stepping - Fifth Step At this point the length of the rafter will be correct for a building with a run of five (5) feet. If an overhang is used, the additional length must be “stepped off” for the overhang. If a ridge board is used, the rafter length must be adjusted.

Stick Built Rafter Steps. Step Six - Birds Mouth

Stick Built Rafter Steps. Tail Cut If the rafter did not have an overhang, it would be cut off plumb with the back of the birds mouth.

Stick Built Rafter Step Seven - Overhang Laying out the overhang requires two (2) steps. In the first step the 12 inch distance of the overhang is marked.

Stick Built Rafter Step Seven - Overhang-cont. The second step is to mark the end cut. In this example it is a plumb cut. The same ratio is used. If a square cut is desired, a line square with the edge would be marked.

Questions