Nick Walker – GDE meeting Frascati 8.12.05 Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati – 8.12.2005.

Slides:



Advertisements
Similar presentations
Most slides from September 2006 MAC meeting ILC Cost Versus Performance (Parameter Choices) Tor Raubenheimer SLAC.
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Status of the ILC Accelerator Design Barry Barish, Nick Walker for the entire ILC machine community 2 nd ILC Workshop – Snowmass, Colorado
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
GDE expectations from the SRF community Barry Barish Cornell SRF Mtg 15-July-05.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
Brian Foster - ILC 1 The International Linear Collider Brian Foster Oxford The Global Design Effort European GDE ILC Spain Gandia 4/12/05.
ILC-GDE The ILC Global Design Effort Gerry Dugan ILC/GDE and Cornell University SLUO Annual Meeting SLAC Sept. 26, 2005.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
GDE Report to FALC Status and Plans Barry Barish FALC Fermilab 4-Nov-05 ILC Polarized Electron Source.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
GDE Report from Snowmass to a Baseline Barry Barish ILCSC Meeting Daegu, Korea 27-Aug-05.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
On the Way to ILC Shekhar Mishra Fermilab Talk presented on behalf of ILC-GDE 2/16/06 Talk Presented at the 2006 Aspen Winter Conference: "Particle Physics.
GDE: Status and Plans Barry Barish CERN FALC Resource Board 8- Feb-06.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
ILC Global Design Effort Barry Barish GDE 9-March-06.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
@ Fermilab ILC bunch-compressor and linac rf requirements Sergei Nagaitsev Fermilab Feb. 9, 2006.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
07 June 2006Peter Tenenbaum1 Ring to Main Linac and Low Emittance Transport SLAC DOE Review Accelerator Breakout.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
15-August-2005Peter Tenenbaum for WG1 Convenors 1 Low Emittance Transport and Beam Dynamics (WG1) Snowmass Meeting “I hear the roar of the big machine,
WG1: Overall Design personal highlights report by Nick Walker First project meeting 2/12/2004 conveners: Kiyoshi Kubo (KEK) Tor Raubenheimer (SLAC)
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
ILC - Upgrades Nick Walker – 100th meeting
SC Quadrupole Magnets in ILC Cryomodules
Status and Plan of GDE Design Work (Including Road Map for RDR)
Technical Design Report preparation
ILC Global Design Effort
International Linear Collider Report from the GDE Director
Barry Barish GDE Caltech
Discussion Session “Strawman” BCD  BCD (now)
Yasuhiro Okada, Executive Director, KEK
Presentation transcript:

Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –

Nick Walker – GDE meeting Frascati The Next Two Hours The road to the BCD  brief recap of the process since Snowmass Review of the White Papers BCD EC decisions for the strawman BCD  what changes we made Review of comments and feedback  some comments we have received  what’s missing from the BCD Formal acceptance of the BCD

Nick Walker – GDE meeting Frascati Arriving at the BCD 1 st ILC Workshop at KEK ( )  working groups (WG) formed to begin identifying contentious design issues 2 nd ILC Workshop Snowmass (8.2005)  modified WG continue identifying baseline design and alternatives  newly formed ‘Global Groups’ begin to discuss and catalogue global design issues  2 nd Snowmass week: concentrate on the list of ‘Top 40’ critical design questions (Himel List)

Nick Walker – GDE meeting Frascati Arriving at the BCD (cont) Comments on Snowmass  first week: formal workshop with traditional parallel working groups  second-week: entire ILC community not present, but those that remain make significant progress on identifying baseline. It was understood that the result of 2 nd week deliberations did not necessarily reflect the consensus view of the entire community.

Nick Walker – GDE meeting Frascati Arriving at the BCD (cont) August SeptemberOctober November December 2005 WW/GG summaries + broader input Response to Himel list (40 questions) all documented ‘recommendations’ publicly available on www (request community feedback) review by BCD EC BCD EC publishes ‘strawman’ BCD public review Frascati GDE meeting BCD Executive Committee (EC): Barish Dugan, Foster, Takasaki (regional directors) Raubenheimer, Yokoya, Walker (acc. design leads)

Nick Walker – GDE meeting Frascati Arriving at the BCD (cont) August SeptemberOctober November December 2005 WW/GG summaries + broader input Response to Himel list (40 questions) all documented ‘recommendations’ publicly available on www (request community feedback) review by BCD EC BCD EC publishes ‘strawman’ BCD public review Frascati GDE meeting Request for public comment and feedback

Nick Walker – GDE meeting Frascati BCD EC review process Snowmass documentation comments and feedback from general community ‘white-paper’ task groups on identified contentious items Barish ‘mini-MAC’  Burt Richter (SLAC)  Katsunobu Oide (KEK)  Lenni Rivkin (PSI)

Nick Walker – GDE meeting Frascati White Papers Energy upgrade  Lijle, Raubenheimer, Toge IP configuration  Bialowons, Markiewicz, Yamamoto Number of tunnels  Delahaye, Hayano, Phinney Location of positron source  Himel, Walker, Yokoya Tunnel topology  Funk, Schulte, Shidara

Nick Walker – GDE meeting Frascati BCD EC contrary decisions Energy upgrade – short tunnel adopted  option 3 in white paper Main linac quadrupole spacing  32 quads per quadrupole (24 recommended by WG1) RTML (bunch compressor)  cost minimal system (two-stage compressor)  evaluate (cost) single-stage system with two-stage system as upgrade rationale: cost

Nick Walker – GDE meeting Frascati Comment and feedback SLAC ILC group  modulator baseline  e+ source location (→ white paper) Armin Reichold (Oxford)  no BCD entry for survey & alignment Weiren Chou (FNAL)  question concerning gradient cost optimum GG2 conveners (Braun, Ross, Urakawa)  recommendation for ~1  m linac BPM resolution (current BCD is ‘less than 10  m’) Gudrid Moorgat-Pick  Importance of focus on CME ≤ 500GeV (strong physics case)  Concerns on potential  1TeV upgrade driving initial design

Nick Walker – GDE meeting Frascati Barish ‘Mini-MAC’ high-points Richter  importance of energy flexibility and incremental energy upgrade physics-driven in light of early LHC results  The case for 2 detectors – 2 IRs Oide  luminosity parameters – designing a 5×10 34 machine  Design of RF system to ‘true average gradient performance’  Questions concerning e+ source  DR discussions (favours dogbone?) BCD EC will respond to all comments and questions

Nick Walker – GDE meeting Frascati The Baseline Machine (500GeV)

Nick Walker – GDE meeting Frascati TeV upgrade

Nick Walker – GDE meeting Frascati The Baseline Machine (500GeV) not to scale ~30 km e+ 150 GeV (~1.2km) x2 R = 955m E = 5 GeV RTML ~1.6km ML ~10km (G = 31.5MV/m) 20mr 2mr BDS 5km

Nick Walker – GDE meeting Frascati BCD Current baseline rather superficial in many places  exception: main linac technology Many inconsistencies  need pedantic review of details Much detail still missing and needs to be supplied  tables of parameters  tables of tolerance  figures (cartoons) of basic layouts  lattices  … First work for AGs over the next couple of months (together with the CCB)

Nick Walker – GDE meeting Frascati Formal Acceptance of BCD You got a problem with that? BCD EC

Nick Walker – GDE meeting Frascati Formal Acceptance of BCD BCD EC Yeah! Wanna talk about it?

Nick Walker – GDE meeting Frascati BCD Formal Acceptance The Role of Change Control  today is not the final word!  requests for modifications will now be formalised via the CCB  many questions and decisions on details still remain (not currently in the BCD document)  CCB will probably be more of an ‘Acquire Control Board’ in the first few months.