MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
Products being integrated to create Home Base OpenClass Collaboration Schoolnet Instructional Tools and Assessment PowerSchool Student Information Core.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
Authoring Instructional Materials (AIM)
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
AIM Toolset Interfaces with Authoritative Technical Data
1 AIM/CPM Pilot Project Status Report 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Roy Hoyt & Leslie Desenburg, NETC N74.
Authoring Instructional Materials (AIM)
AIM FRB Briefing NAVSEA 07TR3 Sandra Wiegmann Submarine Training Systems Division NAVSEA 07TR3 4 Nov 2008.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
AIM Program Software Status
A look at the NETC End-to-End (E2E) Process using the Content Planning Module (CPM) / Learning Object (LO) Module.
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
DEFENCE LEARNING NETWORK PROJECT DLN Overview and Demonstration UMCC HR Sub-committee 6 December 2012 Susan Nutbrown DLTPD/DGWD DLN Project Leader (Civilian)
Mechatronics: An On-Boarding Corporate Training Example Jay Bouis Coordinator of Technical Training The Community College of Baltimore County Penny Jung.
NETC N6 Status Update to AIM FRB 18 Sep 12 Bruce Bare, NETC, N62 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
Using Blackboard for blended learning Delivering the Geography curriculum at Kingston College This talk will give an overview of the assessment features.
AIM/CPM Briefing & Demo 4 November 2009 Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
Center for Personal and Professional Development Harrison-Youngs/ Bartholomew ISD CPPD 4 November 2008.
Nodal Education Initial Staff Concepts 11/30/05. Agenda Integrated Approach Roadmap and Processes Curriculum Development ERCOT Education Advisory Council.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Linking Blended Learning to Navy Fleet Performance Requirements, REAL-TIME Jake Aplanalp Naval Air Warfare Center, Training Systems Division.
Worldwide Protein Data Bank wwPDB Common D&A Project Full Project Team Meeting Rutgers March 16-19, 2010.
1 AIM FRB Briefing Karen Pohl Curriculum Systems Director Naval Special Warfare Center 3 Nov 08.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
LOG 101 Curriculum Review 28 Jun 02 Richard A. Andrews, CPL Course Manager.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Block Learning / Ready Relevant Learning and
Staff development for technology- enhanced learning and assessment an institutional overview Carol Russell.
Vers national spatial data infrastructure training program Training Materials Workshop Subject Matter Expert USGS Headquarters Reston, Virginia.
Role of Account Management at ERCOT Nodal Training – Update Pamela Dautel April 10, 2006 Market Education.
Software Configuration Management
Presentation transcript:

MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator

Overview MT Continuum overview Application to other communities Project status Lessons learned for other NETC communities

Background Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just- in-time ILE-conformant Instructor Led (ILT) and Interactive Multimedia Instruction (IMI) segments delivered, tracked, and assessed through LMS AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms

MT Continuum Team SSP - Requirements Owners, Afloat Delivery System Contractor team – ILT development, IMI Storyboard development, SMEs NAWCTSD / AIM team - CPM/LO Module support NUWC – LMS (Seaware) NUWC – MTC Lead System integrator LSI, Inc. – ISD and IMI design/development Chenega Logistics – CM/QA agent for SSP SLC – ETC CCA for MT curriculum Fleet – SMEs/afloat training management

Project Status Plan, Analyze & Design Phases Completed – Delivery Method Analysis Process still needed – Scientific/Justifiable/Repeatable Development fully underway. Development effort is at the halfway point – Assessment, Performance Testing (NAVEDTRA 132) Large emphases on Implementation, Evaluation and Maintenance – Versioning, LMS interface Ongoing integration of CPM/LO Module, IMI toolset, PC simulation toolset, and LMS for planning, analysis, design, development, implementation, evaluation, and maintenance of blended content

MT Continuum Technical & Schedule Integration MTC development spans from JDTAs to the delivery and maintenance of training and test assessment material to students afloat and ashore MTC Lead System Integrator – Coordinates technical and schedule activities between and among developers, relative to the training and assessment delivery and maintenance goals of the MTC – Development functions /roles include: MPAs, Courseware Developers, ISD, CPM & LO Module developers/maintainers, LMS developers, PPC and SLC relative to the goal of delivering

MT Continuum Components Plan/Analyze – CPM (JDTA/TPP/TCCD) Design – CPM (COI) – LO Module (final design of ILT/preliminary design of IMI) Develop – LO Module (complete for ILT and test items) – Venus.net IMI toolset (complete for IMI and assessment Sections) – VIPr (PC simulation scenarios for ILT and IMI) – Content Packaging Tool (CPT) (Section level ILT/IMI/assessment integrated via per LMS Interface Specification)

MT Continuum Components (contd) Implement – Training content includes assessment items – Seaware LMS (ILT/IMI/assessment delivery and tracking) Evaluate – Seaware LMS (student testing /test item analysis) Maintain – LO Module/Venus.net (integrated surveillance/update of ILT/IMI/test items)

MT Continuum Integration Tasks LMS Interfaces – Interface specification with LO Module and VIPr – NUWC Newport lead with inputs from PPC (Chenega Logistics), ISD/IMI developer (LSI), and AIM team (AIMEREON) Content Packaging Tool (CPT) – Ongoing development by LSI with support from NUWC Newport Seaware LMS team, PPC, and AIM team (AIMEREON) Classroom Control Software (CCS) – Architectural approach in development by NUWC LMS team, supported by LSI, PPC, and AIM team (AIMEREON) – CCS system and developer selection tbd

Required for MTC March 2015 Blended Training: Course Packaging Tool, Enhancements to XLP and LMS, and AIM LO Module Interface 10

Application to Other Communities Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development (NAVEDTRA 137) Closely coordinated with NAVEDTRA 136 development Hands-on production phase development of complete LO Module ILT lessons/sections including versioning Design of IMI lessons/sections as well as definition of new JDTA/LO Module versioning concepts Integration of PC Simulation toolset with LO Module

Application to Other Communities (contd) Bi-directional interface between LO Module and IMI toolset for integrated IMI / assessment development / maintenance Development of ILT and IMI test items and output to IMI toolset for aggregation into LMS-delivered Lesson-level assessments Sections, including enhanced performance test item development LMS delivery and tracking of integrated ILT / IMI / assessment content Integrated surveillance and maintenance environment for blended (ILT/IMI/test item) SCORM NAVEDTRA 136- compliant learning content

Application to Other Communities (contd) Briefing of MT Continuum to ‘big Navy’ – Training 2020 study group – OPNAV staff – Fleet Forces Command

Lessons Learned JDTA – Foundation. Getting this right cannot be over- emphasized. Maturity of Design Documents and Processes – IMDP, Learning Objectives (ISD Considerations), Process Documents, Assessment Design, Time to Train Estimations, Delivery Method Analysis Early definition of detailed blended content structure and ILT/IMI delivery implementation – Delivery interface specification – ILT/electronic classroom delivery

Questions?