Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.

Slides:



Advertisements
Similar presentations
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Advertisements

Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
Culvert Inventory and Assessment Protocol 2015 Field Season.
Culvert Inventory and Assessment Protocol 2012 Field Season.
What is a Culvert? Culvert Components Culvert Design and Construction
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Riparian Zone Habitat Assessment Vegetation and More.
Wetland Habitats: EMWMF Haul Road Remediation In 2005 a large haul road was constructed that resulted in loss of wetlands. To compensate for those losses,
Alabama Best Management Practices for Forestry Alabama’s Best Management Practices for Forestry “… are voluntary guidelines to help maintain and protect.
1 Floodplain Management SESSION 7 Stream Systems on Dynamic Earth Floodplain Management Principles & Practice Prepared By Donald R. Reichmuth, PhD.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
WATER CONSERVATION PRINCIPLES AND PRACTICES. Water conservation “ The conservation treatment meant to reduce or prevent sheet erosion while achieving.
Design of Culverts. Culvert Design - Basics Top of culvert not used as pavement surface (unlike bridge), usually less than 7 m.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
RIPARIAN TREE PLANTING City Stream Watch SAWMILL CREEK Phase II Rehabilitation Project.
Design of Open Channels and Culverts
Vineyard Planting in Sonoma County Nick Frey Sonoma County Winegrape Commission.
L ESSONS L EARNED BY P ROJECT T YPE Acknowledgements: This truly was a cooperative effort between the NPT, USDA-FS and the many contractors who have completed.
Habitat Assessment Developed by Ken Cooke Kentucky Division of Water Watershed Watch Program Coordinator Modified by Mike Kemp Professor of Environmental.
Lewis Creek Reach M19 Phase 1, Phase 2, and Phase 3.
Bioassessment 1.0. Stream Visual Assessment Protocol 1. Turbidity 2. Plant growth 3. Channel Condition 4. Channel Flow Alteration 5. Percent Embeddedness.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Stream Restoration Techniques
Stream Crossings: Effects on Streams at Fort Riley Military Installation Gilbert Malinga 1, James Steichen 1, Stacy Hutchinson 1,Phillip Woodford 2, Tim.
Minnehaha Creek – Reach 14 Streambank Improvement Project.
1 Mixing engineering and biology. Where Fish Passage is required Connectivity is required across the landscape wherever there are fish. Fish and fish.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Urban Stream Restoration Case Studies: Challenges and Opportunities Alabama Water Resources Conference September 6-7, 2012 Greg Jennings, Darrell Westmoreland,
Protect & Restore Northeast Oregon/Southeast Washington Project Number ISRP – Geographic Review May 1, 2013.
Forestry BMPs OUR GOAL: To Protect Our Waters and Site Productivity Through the Proper Use and Application of Best Management Practices. (BMPs)
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Project Activity: Riparian Zone Restoration Scott Compton, Watershed Program Manager Valles Caldera National Preserve.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Nez Perce Tribe Department of Fisheries Resource Management WATERSHED DIVISION FCRPS Biological Opinion Expert Panel “Gap Filling by Habitat Actions”
Evaluation of Fish Passage Improvement Projects in the South Coast and Rogue River Basins Duck Creek Associates Dylan Castle.
San Pedro Creek: A Longitudinal Profile Study Andrew Georgeades Anne Jurek Mary Snow.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Clear and Foster Creek Fish Passage Assessment and Prioritization Project Draft Methodology Report: For the Clear and Foster Creek Fish Passage Assessment.
Flowing water.  vitally important geologically, biologically, historically and culturally.  contain only 0.001% of the total amount of the worlds water.
Coos Watershed Association Watershed Restoration Projects.
Introduction Left: Old Kenston High School was built in 1950 Right: New Kenston High School was built in 2006.
Coal Creek Culvert Replacement Pacific Coast Salmon Coalition.
Earth Day Award Nomination by Utah School and Institutional Trust Lands Administration and the Division of Wildlife Resources.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
Project Profile: Four-Star NGBS Certified Development Developed by Rocket Properties, LLC 778 acre infill site, 428 acres preserved 604 home sites in 8.
Indices of Road Erosion Bear Valley Watershed, Idaho
Black Creek Streambank Stabilization Projects
Erosion • outline a cause of soil erosion in  NSW due to: – an agricultural process – urbanisation and identify a management strategy that prevents or.
a design technique for achieving fish passage
EAG346-Sem II 2014/2015 Lesson 2.
Unit 4: Environmental Science
Fish Passage Restoration at Roy’s Pools
Watershed Restoration on the Lolo NF Benefits for the Clark Fork Watershed Taylor Greenup, Hydrologist, Lolo National Forest Jennifer Mickelson,
Road-Stream Interface:
Water Testing Project for the North Fork River
Module # 17 Overview of Geomorphic Channel Design Practice
Environmentally sensitive areas
Kastanis- Existing Conditions
Module # 16 Restoring Functions to Streams Through Design
Longitudinal Profile Survey for Successful Culvert Replacement
Stream Crossing Replacement Policy
In-Stream Structures & Grade Control
Shaver Creek Permitting
Presentation transcript:

Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored in years 0, 1, 2, 5, and 10 post decommissioning. To date there have been 100 monitoring segments set up, and 42 of those have reached the year 10 monitoring cycle. Each segment may consist of up to all of these parameters monitored… 1.Longitudinal Profile of SGC (stream grade channel) 2.3 cross sections within SGC profile 3.500’ vegetation plots established within decommissioned road prism 4.Visual assessment of CDC (cross drain channel) 5.Overall segment condition – erosion, slash, weeds, failures 6.Temperature data at SGC 7.Photos of segment 8.Yearly tracking of mass failures (greater than 10 CY) known on any decommissioned road

Lessons Learned There are never too many clump plantings on decommissioned roads, especially in channel crossings Stream bottoms should be constructed at least 2 times bankfull width to allow stream to migrate laterally while minimizing erosion to adjacent slopes Erosion control mattresses are not necessary in channel bottoms and side slopes to reduce erosion The use of “brush blankets” has greatly reduced erosion in CDC’s Spreading “duff” layer from above or below road speeds up the process of establishing native plants and shrubs on decommissioned roads Slash should be laid on road at approximately 40-60% coverage for optimal reveg No straw is better than too much straw which will inhibit revegetation Fertilizer did not increase the rate at which vegetation was established on roads

SGC on rd Lost Creek drainage decommissioned 2009 Comparison of SGC from year 0 and same site at year 1. Notice the clump plantings where the main alder tree in clump didn’t survive, but all of the shrubs, forbs, grasses that came along in clump are doing very well. And also the areas where the straw was laid down too thick the vegetation is much more sparse if any coming back in those spots.

Culvert Monitoring For each AOP project completed, a monitoring site is set up and monitored in years 0, 1, 5, and 10 post construction There have been 99 monitoring sites set up to date, with 15 having reached year 10 Each monitoring segment consists of: 1.Longitudinal Profile starting 10 times bankfull width above the inlet of structure and ending downstream past point of influence of structure 2.Control cross section set up at beginning of LP, and a tailwater cross section being set up at tailwater control point after outlet 3.Site sketch to include overhead and side view within structure 4.Presence/absence of fish above and below structure 5.Bankfull widths of stream outside zone of influence 6.Substrate size at inlet, middle, and outlet of structure 7.Site photos

Lessons Learned For AOP, bridge is best option, followed by bottomless arch Squashed pipes with built in substrate retention structures do not always retain substrate When at all possible, rock weirs constructed within bottomless arch or under bridges are best option for passage Planting of fill slopes at inlet and outlet ends helps with stability of slope and creates shade for stream If using rip rap as fill, cover with soil to allow planting

Rock weirs in Cabin Creek bottomless arch This culvert is 144 feet long with a 6.2% slope. There are a total of 7 rock weirs constructed within structure creating resting pools, habitat, and acting as gradient control structures to optimize passage for all aquatic life.