MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1.

Slides:



Advertisements
Similar presentations
Engine Cylinder Leakage Test Tune 8 NATEF Section A8, A.11 P-1.
Advertisements

PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
P08026: Modular Hemodynamic Flow Simulator Jason Brown Mechanical Engineering Amanda Clark Mechanical Engineering Matthew Hicks Electrical Engineering.
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
MSD-I Project Review Modular Motion Tracking Sensors 1.
6/10/2015SYSTEMS LEVEL DESIGN REVIEW 1 HEALTH-MONITORING OF A RECIPROCATING COMPRESSOR MSD1 – P12453 SYSTEMS LEVEL DESIGN REVIEW.
04013 Micro Turbine Senior Design Micro Turbine Senior Design PDR – May 20 th, 2004 Project
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
1. Scope of the Project Diagnostic tools are already being used by GE for compressor performance, but they are… – Too expensive – Time Consuming – Hazardous.
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
Compressor ReVamp and Fabrication PO9452. Update Revised specs Continued concept generation Researched range of educational applications for compressor.
P09311: Interface for Multi-Purpose Driver/Data Acquisition System Adam Van FleetProject Leader, EE DAQ Hardware Development David HoweElectrical Engineer.
PRELIMINARY TEST PLANS 6/30/2015 Detailed Design Review 1.
Team 12 Amelia House Paul Jaffa Johanna Miller Brian Ortega.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
P14453: Dresser-Rand Compressor Bearing Dynamic Similarity Test Rig Final Review May 13, 2014Rochester Institute of Technology1.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Ice Pile Air Conditioning Joseph Cooper: Project Lead Kylie Rhoades, Clara Echavarria, Jonathon Locke, Alex Gee.
GARLOCK EXPANSION JOINT (MSDI-P13671) Systems Design Review January 11 th, 2013 Friday, January 11, 2013P Garlock Expansion Joint 1.
GARLOCK EXPANSION JOINT (MSDI-P13671) Systems Design Review II January 18 th, 2013 Friday, January 18, 2013P Garlock Expansion Joint 1.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
PROJECT STATEMENT Dresser-Rand will be donating a single stage ESH reciprocating compressor for RIT use. The project objective is to safely install the.
Senior Design Team #18 Lacey Ednoff Brianna Beconovich Jarimy Passmore Jesse Poorman.
P12022: LVAD P OWER T RANSMISSION T EST R IG Erin McNally Pedro Baez Paul Parthemore Kris Stichter.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
System Design Review Project Team 13453
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
Combined April and May 2007 Monthly Report
MSD P13453 Final Project Review Sean Deshaies (ME) Erin Sullivan (EE) Michael Gorevski (EE) Brandon Niescier (ME)
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
1 PST Heaters 4 panels per segment along pixel support tube. Each segment is 236mm long at the moment. Copper-on-kapton. Nominal 20 ohms per full panel.
May 10, 2013P Xerox Bearing Tester Final Project Review.
Nanofluidic Characterization David Sharp David West Justin Davis.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
P16452: Active Reciprocating Compressor Valve Assembly Week 9: Subsystem Design Review.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
Mass Flow Sensor Integration Team 5: Beau Rodgers Luis Mendez Brian Roberts Keenan Cheeks Sponsored by: Danfoss Turbocor Advised by: Dr. Shih.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
P08452 Reciprocating Compressor Installation, Revamp, and Interface Installation Designed and prepared the installation guidelines and test cell setup.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
Shaft Replacement Standard Operating Procedure
Advisor: Dr. Shangchao Lin
2K Cold Box FDR Introduction
Nano-fluidic Characterization
LARP Phase II Secondary Collimator RC1
P07203 Dynamometry Laboratory Infrastructure
Performance of an Automated Water Based Cooling System for CBM MuCh
Xerox Bearing Tester Final Project Review
P15671: Expansion Joint Health Monitoring Data Acquisition
P16081: Systemic Circulation Detailed Design Review
C Air Compressor Up-fit and Plumbing Guide For LDI B3
MOOG EMA Installation MSD1 - P12251
Detailed Design Review
P14372 Actively Stabilized Hand-Held Laser Pointer
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
MSD P15280 RIT HOT WHEELZ TEST BENCH
P15661 Reciprocating Friction Tester Base Subsystem
Active Reciprocating Compressor Valve Assembly P16452
P09045: Membrane Characteristic Test Stand
Detailed Design Review Solar Thermal Water Heater
Presentation transcript:

MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1

Agenda Introduction (1 min) Project Background (2 min) Customer Needs (2 min) Revised Engineering Specs (5 min) Risk Management (5 min) RITDAQ (40 min) – Analog – Thermocouples Bill of Materials (10 min) – Complete – Cost Overview LabView VI Interface (10 min) Test Plan (10 min) Questions 5/17/2015 Detailed Design Review 2

Team Members TEAM: Project Manager: Markus Holzenkamp (ME) Project Engineers: Cody Anderson (ME) Robin Leili-Marrazzo (ME) CUSTOMER: Dr. Jason Kolodziej, ME Department, RIT Dr. Edward Hensel, ME Department, RIT SUPPORT: Project Guide:Bill Nowak (Xerox) Faculty Champion:Dr. Kolodziej (RIT) Sponsors:Scott Delmotte (D-R) James Sorokes (D-R) Britt Dinsdale (D-R) 5/17/2015 Detailed Design Review 3

Customer Needs PriorityNeed 1Learn RITDAQ capabilities and propose and implement improvements in code to generate p-v diagrams, time and frequency plots 1Propose and install possible additional sensors to measure stage pressures, stage temperature, bearing temperature 2Install Envision System 3Select, install, and integrate encoder 99Develop future undergrad/grad labs 5/17/2015 Detailed Design Review 4

Project Scope Understand the current state of the compressor – Current sensors, DAQ capabilities – Operation characteristics of reciprocating compressors Install and run ENVISION Condition monitoring system to be donated by Dresser-Rand Increase the current DAQ capabilities End Goal: Design, develop, and install effective health monitoring capabilities 5/17/2015 Detailed Design Review 5

Sample Engineering Specs (Updated) Specification Unit of Measure Margin al Value Ideal Value Actual Value Encoder Resolution pulses per rev (x4) crankshaft / encodershaft ratio 1011 Encoder Lifetimecycles TBD Voltage required by sensorsV Sensor Cost$10000<300 Sensor OutputV 0-5 Sample Rate of the RITDAQHz 0<370kHz TBD Total number of analog sensors#0<1613 Total number of thermocouples#0<1612 Pipe thread size ½”- ¾” NPT 1/8” – ¾” NPT 5/17/2015 Detailed Design Review 6

Concept Selection 5/17/2015 Detailed Design Review 7 Concept Selection (week 3) Concept Selection (week 7) Concept Sketch (week 8)

Risk Assessment 5/17/2015 Detailed Design Review 8

Risk Assessment 5/17/2015 Detailed Design Review 9

RITDAQ Channel layout and sensor attachments 5/17/2015 Detailed Design Review 10

DAQ Channel Layout (Analog) 5/17/2015 Detailed Design Review 11

DAQ Channel Layout (Analog) 5/17/2015 Detailed Design Review 12

Flow meter How? Insert in flex-hose section Why? Easy to modify layout Cost efficient Materials Needed: -hose clamps (x2) -Adapter (x2) 5/17/2015 Detailed Design Review 13

Tank Pressure 5/17/2015 Detailed Design Review 14

Tank Pressure How? Use Rosemount Alphaline 1151 Mounted on compressor base Connected with pressure tubing Why? Already have sensor Easy to place T-Piece before analog gage Materials Needed: -T-Piece -Adapter -Thermocouple fitting 5/17/2015 Detailed Design Review 15

dP across orifice tank How? Use Rosemount sensor Mount in basement with tank Why? No room constraints Out of the way Materials Needed: -Hardware -Adapter (x2) -Elbow 5/17/2015 Detailed Design Review 16

Photocraft HS20 Encoder How? Use included mounting bracket to attach to oil pump housing Why? No modifications to existing structure Materials needed: - 7/16-14 Bolt 3in long - 7/16-14 nuts 5/17/2015 Detailed Design Review 17

DAQ Channel Layout (Thermocouples) 5/17/2015 Detailed Design Review 18

DAQ Channel Layout (Thermocouples) 5/17/2015 Detailed Design Review 19

Inlet Coolant Temperature How? Attach T-Piece between flex hose and steel flange Why? No modifications to existing structure Inlet coolant is at room temperature, heat loss is negligible along steel pipe Materials Needed: -T-Piece -Hose Clamp -Adapter for Thermocouple -Thermocouple fitting 5/17/2015 Detailed Design Review 20

Cylinder Coolant Layout 5/17/2015 Detailed Design Review 21

Head Outlet Coolant Temperature 5/17/2015 Detailed Design Review 22

Head Outlet Coolant Temperature How? Attach fitting to plugged hole and insert thermocouple directed at top outlet Why? No modification of existing structure Measures right at the outlet Materials Needed: -Thermocouple fitting -Adapter 5/17/2015 Detailed Design Review 23

Center Outlet Coolant Temperature How? Attach fitting with thermocouple to plugged hole adjacent to outlet Why? No modification to existing structure No losses Materials Needed: -Adapter -Thermocouple fitting 5/17/2015 Detailed Design Review 24

Tail Coolant Out Temperature 5/17/2015 Detailed Design Review 25

Tail Outlet Coolant Temperature How? Drill and tap hole in pipe. (4mm wall thickness) Why? Close to outlet No mixing with other coolant flows Materials Needed: - Thermocouple fitting 5/17/2015 Detailed Design Review 26

Tail Coolant Out Temperature Test strength of threading schedule 80 pipe. 5/17/2015 Detailed Design Review 27

Combined Outlet Coolant Temperature How? Drill and tap hole in bottom of flow sight Why? Close after all 3 coolant outlets combine Sufficient wall thickness to secure enough threads for fitting Materials Needed: - Fitting for Thermocouple 5/17/2015 Detailed Design Review 28

Combined Outlet Coolant Temperature 5/17/2015 Detailed Design Review 29 Measuring the temperature of the cooling pipes at various locations

Coolant Temperature Before and After Chiller How? Insert T-Piece between flex hose and Chiller inlet Why? Easy to add piping at this place Materials Needed: -T-Piece (x2) -Adapter (x2) -Thermocouple fitting (x2) 5/17/2015 Detailed Design Review 30

Crankcase Oil Temperature How? Attach fitting with thermocouple in plugged hole in crankcase Why? No modification of existing structure Materials Needed: -Adapter -Thermocouple fitting 5/17/2015 Detailed Design Review 31

Crankshaft Bearing Temperature 5/17/2015 Detailed Design Review 32

Crankshaft Bearing Temperature How? Drill into crankcase until just before bearing journal Insert thermocouple to measure temperature of crankcase at that point Assistance from Dresser-Rand Why? Does not alter bearing function Will show trends of bearing temperature accurately Materials Needed: - Thermocouple fitting (x2) 5/17/2015 Detailed Design Review 33

Bill of Materials 5/17/2015 Detailed Design Review 34

Cost Breakdown BUDGET$3000 Sensors$1089 Wiring$88 Hardware$243 TOTAL COST$1420 5/17/2015 Detailed Design Review 35

LabView Interface Goals: Clearly display compressor data Time domain and Frequency domain P-v diagram for forward stroke and backstroke 5/17/2015 Detailed Design Review 36

5/17/2015 Detailed Design Review 37

PRELIMINARY TEST PLANS 5/17/2015 Detailed Design Review 38

Sensor Tests Means of testing sensor functionality SigLab Existing USB DAQ RIT DAQ 5/17/2015 Detailed Design Review 39

RIT DAQ Cross referencing sensor outputs with existing DAQs and Signal Analyzers Use USB DAQ to validate signals Use SigLab to validate signals Reference expected values to ensure proper sensor readings 5/17/2015 Detailed Design Review 40

Envision System Utilize the functionality of the RIT DAQ Use the functioning RIT DAQ to ensure the Envision System is displaying proper outputs RIT DAQ will already be cross referenced with alternative Signal Processors and validated 5/17/2015 Detailed Design Review 41

Preliminary MSD II Schedule 5/17/2015 Detailed Design Review 42

Questions? 5/17/2015 Detailed Design Review 43