06/06/07 – 07/11/07 BIM Building Information Modeling.

Slides:



Advertisements
Similar presentations
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100%? How do you perform quantity.
Advertisements

BIM EXECUTION PLANNING PROCESS
Eric M. Wetzel Carollo Engineers, Inc. Bentley Be Inspired Awards November 13, 2012.
Project Engineering & Construction Management Solution Project Access BOQ Component 1 Model WBS BudgetSchedule PlanRequisition AdministerProcure StockVendor.
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
© 2012 Autodesk Beyond Design with Autodesk Revit 2013 and Autodesk 360 Cloud Services Kal HouhouJohn Harriman BIM ImplementerPrincipal.
© 2009 Bentley Systems, Incorporated Presented by Chuck Lawson, PE Civil Product Engineering Using ProjectWise Navigator in the Civil Environment.
BIM Me Up, Scottie! The Next Generation in Construction Technology.
Integrating LCA into Building Design and Retrofit Processes Sarah Russell-Smith Research Group Meeting August 25, 2010.
Integrating Steel Presented By: Hala Ali Nabil Mohamed Ali By: John Jurewicz Web Address: articles/tools_ articles.html Topic.
The BIM Concept Drawings, building views, visualizations, calculations and quantity take-offs are automatically derived from the 3D model. BIM= Building.
Towering with ArchiCAD Presented By: Hesham Mohamed Hassan El-Shahawy By: Elizabeth Bollinger Web Address:
SCADA PRO PRESENTATION Budapest, 21/2/2009 Dennis Ioakim Civil Engineer Managing Director ACE HELLAS SA.
January 2013 BIM the cost of sustainability BIM And the cost of sustainability Delivering sustainability.
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Integrated Design and Delivery Systems By Dr Zeeshan Aziz – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
The BIM Project Execution Planning Procedure
Introduction to BIM BIM Curriculum 01.
Emerging Trends in Electronic Design and Construction April 2013.
Course Number Course Name Faculty Name University Logo T. Sulbaran & M. Shiratuddin - BIM for Construction Using ArchiCAD – Thomas Delmar Learning – ASC.
Developing Health Geographic Information Systems (HGIS) for Khorasan Province in Iran (Technical Report) S.H. Sanaei-Nejad, (MSc, PhD) Ferdowsi University.
Effective Methods for Software and Systems Integration
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
Construction Project Management: Technology driven answers for schedule and budget savings.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Improving Design Workflow in Architectural Design Applications Presentation Doctoral Seminar 16/06/2006 Leuven (Belgium)
 Virtual construction CE 6016  Project 2013 Second Skin Facade to Civil And Environmental Engineering Building UCC The objectives of the project were.
Project Execution Planning for Building Information Modeling Progress Meeting #2 – July 29 th, 2008 A buildingSMART Alliance project sponsored by: The.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks 3-D Parametric Modeling of Buildings.
A State Perspective Mentoring Conference New Orleans, LA 2/28/2005 RCRAInfo Network Exchange.
© 2012 Autodesk Autodesk Structural Curriculum 2013 Unit 5: Advanced Structural Analysis & Coordination Advanced Structural Analysis & Coordination.
PRJ566 Project Planning & Management Software Architecture.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
The Benefits of Using BIM Software in Building Design and Construction By Jared Heber.
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100%? How do you perform quantity.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Lesson 3-Multimedia Skills. Overview Members of a multimedia team. Roles and responsibilities in a multimedia team.
1.) Building Information Modeling The creation and use of coordinated, internally consistent, computable information about a building project in design.
COA 8903 Strategies for IT Adoption in the Building Industry Amol Kane Construction Engg & Management Georgia Institute of Technology ELEVATORS.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
EastCoast CAD/CAM IFC COBie Plus (via Fabrication for AutoCAD MEP) David E. Quigley, Chief Operating Officer Keith Brown, MEP Consulting Engineer 2013.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Copyright 2008, Open Geospatial Consortium Making Location Count The Quantity Take-off Thread Early Design Quantity Take-off.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
OGC Copyright 2008, Open Geospatial Consortium Making Location Count Building Performance and Energy Analysis (BPEA) Thread 1.Definition of Early Design.
BIM & FM in Hong Kong Public Rental Housing Projects.
6 DIMENSIONAL APPROACH TO CONSTRUCTION 2nd floor, S&R Building, Soonora Church 1st Cross Road, Elamkulam, Kochi 20, Kerala, India
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Page 1 / DI Martin Moesl, M.A. Univ. Prof. DI Dr. Arnold Tautschnig Determining and controlling of the Life-Cycle-Yield in an early planning.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Chapter 7 Computer-Aided Design and Drafting in Architecture.
What is VisualARQ? Architectural software that adds Flexible BIM features to Rhino.
Building Information Modelling
Parameters in Revit Family Creation
BIM EXECUTION PLANNING PROCESS
EXTRA SLIDES.
Parameters in Revit Family Creation
Computer Aided Software Engineering (CASE)
Eleanor Roosevelt High School
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
BIM EXECUTION PLANNING PROCESS
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
2019 NRRA Workshop May21, 2019 AASHTO Perspective on Electronic Data Michael J. Kennerly PE Director of The Design Bureau Iowa Department of.
Presentation transcript:

06/06/07 – 07/11/07 BIM Building Information Modeling

Research Subject:

Review of Literature:  BIM Concept Image Courtesy: OWNER CONTRACTORARCHITECT

Review of Literature:  Multiple Analysis from same Model Image Courtesy:

Review of Literature:  Trends in BIM  Frank Gehry According to a survey by the joint BIM committee of the American Institute of Architects and Associated General Contractors of America, 74% of the 1,266 respondents said they're using 3-D digital modeling at some level. The Merry Road to BIM By Jeff Yoders, August 11, 2006,Building Design and Construction His work includes the Experience Music Project (Seattle), the Guggenheim Museum Bilbao (Spain), and the Walt Disney Concert Hall (Los Angeles); Constructed by Mortenson Construction.  GSA: US General Services of Administration The GSA has even taken the extreme step of mandating the use of IFC-based BIM and believes that BIM adoption should not be driven by cost savings alone, but for its many other benefits such as the ability to explore different engineering systems, perform energy analysis for LEED certification, derive specifications automatically, and eventually eliminate the use of paper and paper-based processes

Review of Literature:  Trends in BIM  Freedom Tower : SOM  Eureka Tower: Fender Katsalidis Australia Image Courtesy: Image Courtesy:

Research Case:  Case Study  SHSU Academic Building Huntsville, Texas:  Designed by WHR Architects  Constructed by SpawGlass Construction  Project Start Date: 15 May 2007  Project End Date: 26 September 2008  Project Duration: 16 Months The project is a 4 story high building with a basement and penthouse level

Case Study: SHSU Academic Building 5  SpawGlass Construction  Integrate Time schedule: 4D  Detect Design Conflicts  Update the 4D model as the project progresses  A need for dynamically integrated 4D model  Sub-Contractor Co-ordination.  Expected Benefits from BIM  Parts of BIM not tested  Quantity take-offs  Resource allocation: Man-hours, methods and materials  Cost allocation across project duration  Facility Management

Case Study: SHSU Academic Building 5  Constructor 2007 Modeling Interface Estimating Interface Scheduling and Generating reports Plays a 5D real time- space file. Cost reports

Case Study: SHSU Academic Building 5  Model Transfer  Convert Revit file to IFC file  Open IFC file in Constructor 2007  Add schedule in constructor  Create the sequencing file in Presenter 2007  Expected Transfer using IFC extension file  Issues encountered  IFC Conversion is a time-consuming process  Unexpected scaling of elements in Constructor

Case Study: SHSU Academic Building 5  Challenges  Creation of second BIM model with necessary details to integrate all scheduling activities.

Case Study: SHSU Academic Building 5  Challenges  Creation of second BIM model with necessary details to integrate all scheduling activities.

Case Study: SHSU Academic Building 5  Challenges  Creation of second BIM model with necessary details to integrate all scheduling activities.

Case Study: SHSU Academic Building 5  Challenges  Scheduling to reflect updated schedule No option for predecessor / successors relationship logic  Linear Scheduling using Construction Simulation File

Case Study: SHSU Academic Building 5  Challenges  Scheduling to reflect updated schedule  STEPS INVOLVED 1.Start project in Estimator: Establish Project Database 2.Assign Recipes to Building elements in Constructor 3.Define the Work Breakdown Structure 4.Assign Construction Zones 5.Add Task Durations in preferred scheduling software 6.Export the 4D model to Presenter  Dynamic Schedule using Recipe Menu Result: A dynamic scheduling file made from scratch using Constructor 2007 Disadvantage: No scope to dynamically connect an already existing schedule using Constructor

Case Study: SHSU Academic Building 5  Navisworks – (Currently under tests)  Scheduling to reflect updated schedule  STEPS INVOLVED 1.Convert Constructor/Revit file to Navisworks file format 2.Link an already existing schedule to Navisworks 3.Assign building elements to task components 4.Play real time-space interactive animation file  Dynamic Schedule using Recipe Menu Result: A dynamic scheduling file made from existing schedule. Contractor need not change traditional ways of conducting business Disadvantage: Navisworks does not let the user draw additional components. One needs to use Revit+Navisworks OR Constructor+Navisworks.

Case Study: SHSU Academic Building 5  BIM issues identified so far.

MISSING END BEARING FOR BEAM.

BEAM LOCATION INCORRECT

Clarify detail A6 on A 301. Is there a concrete section behind the MS beam ? DRAWING INFORMATION CONFLICTS

Additional Details are required to construct the glass canopy East canopy DIMENSIONS MISSING

Case Study: SHSU Academic Building 5  Work to be done 1.Phase 1: Modeling of Architectural/ Structural Elements 2.Phase 2: Test Scheduling Connectivity using Constructor/ Revit 3.Phase 3: Test Scheduling Connectivity using Navisworks 4.Phase 4: Modeling and scheduling of MEP elements 5.Phase 5: Final Reports

 THANK- YOU ! Thanks to: CIAC Dr Julian Kang: T.A.M.U Mr. Micheal Emmons, Mr. Brandon Meyers & Mr. Richard Evans: SpawGlass Construction WHR Construction