Proposed Redevelopment of

Slides:



Advertisements
Similar presentations
NextGen Bus Coaches© for Asian Markets
Advertisements

Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Petroleum, Chemicals and Petrochemicals Investment region (PCPIRs) Specialty Chemicals Conclave
HB1438 Update & Statewide Capital Planning Initiative Office of State Finance Department of Central Services November 8, 2011.
Prepared by: Webmentors Applicable from Financial Year onwards.
Hyde Park Overview A well-designed township comes with the best of design, aesthetics and urban planning confirming fully amenable with all the quality.
Joint Development Paula L. Schwach, Regional Counsel.
INCLUSIVE FLEXIBLE REMUNERATION PACKAGE SYSTEM (DISPENSATION) FOR MEMBERS OF THE SENIOR MANAGEMENT SERVICE(SMS) ON LEVELS 13 TO 15 Presenter’s Name : D.
Land being acquired and developed by 2 3 Location N.
WELCOME.
City of Scottsdale Senior Center at Granite Reef
VETERAN DEFENCE FORCES GROUP PRESENTS Highlights of dda Land Pooling Policy Delhi L- Zone (Dwarka Project) Under FinaliSation by DDA VETERAN DEFENCE FORCES.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
Presenting an exquisite boutique town home community, designed with the finest of craft to mirror the person you are… A personality pronounced in every.
Flow of Presentation About the Developers Their Completed Projects Why Neemrana !! Location and Elevation of the Project Key Features of the Project Layout.
Apton Day Centre Options in relation to Community use and other matters James Parker 10 th July 2014 © Bishop’s Stortford Town Council.
Expand West Kowloon Cultural District to Victoria Harbour District Concept for Integrated Harbour Planning Business Environment Council 13 January 2005.
Osborn MIT A proposal to redevelop the Osborn Triangle
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
Implementing State Density Bonus Law in Berkeley November 13, 2014 City of Berkeley Planning & Development Department.
Document 51 1 Lansdowne Partnership Plan Business Model Document 5.
Central-Wan Chai Reclamation
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
Christopher Kost October 2013 Park it right! Lessons in parking management from European cities.
Municipal Tax Increment Financing
Luxury Homes FROM separate entry exits D L F B A Y V I E W.
" Ensuring Services, Empowering People “ Bihar Right To Public Services Act, Sandip Shekhar Priadarshi Admimistrative Officer BPSM General Administrative.
Community Development Department GRAHAM SWAMP AREA FUTURE LAND USE & ZONING MAP AMENDMENT APPLICATION #2623 & 2624.
Presentation Template Creating Sustainable Places Planning Tools for Creating Sustainable Places.
PREPARATION OF PERSPECTIVE PLAN FOR
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Downtown Berkeley Development Feasibility StudyCity of Berkeley City Council Meeting Downtown Berkeley Development Feasibility Study City of Berkeley City.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
Projectsunder JnNURM Scheme Construction of traffic transit management centres Procurement of buses.
The Fully Networked Car Geneva, 3-4 March 2010 Electrical mobility and Climate Change Ziva Patir VP Standards,Regulations and Compliance Better Place Mass.
Investment Project Century Tower, Larnaca, Cyprus.
WE ARE MOVING! MOVING DATE: NEW OFFICE: COMPANY NAME.
Mid Day Meal Scheme PAB-MDM Meeting-National Informatics Centre (NIC) 2 nd May, 2014 Ministry of HRD, Govt. of India.
1 Re Kgabisa Tshwane Programme. 2 Background October 1997 Cabinet decision that Departments headquarters must locate in the inner city of Tshwane June.
Regional Recycling Solutions, LLC.   County purchased 103 acres in July of 1993 from Greene Land Company  Elchin Inc purchases 40 acres in April 1998.
University Public Private Partnerships for skills, research, innovation and economic development: examples from the UK Presentation to FICCI Higher Education.
RATAN PEARLS Ratan Housing is coming with a new project Ratan Pearls in Noida Extension.
Chapter 13: Site Valuation. Approaches to Site Valuation  Direct sales comparison approach  Extraction method  Development approach  Capitalization.
WHITE FLINT SECTOR PLAN Financial Analysis, Infrastructure Financing & Economic Benefits.
Park & Ride Plaza Liberty Market, Lahore Presenters: Planner Aqeel Suliman Planner Kiran Shahzadi.
Greetings from Spa Eco City & the creators of Frangipani Country Estates!! Greetings from Spa Eco City & the creators of Frangipani Country Estates!! 1.
Dr. Mohamed Riyazh Khan DoMS
DEPARTMENT OF PUBLIC WORKS Presentation to Portfolio Committee on SAPS PROVISION OF INFRASTRUCTURE AT LEBOMBO LAND PORT OF ENTRY 17 June
Social cost benefit analysis of Delhi Metro
Commercial and Investment Real Estate Opportunities Types of Properties Diversity of Clients ® Dearborn Real Estate Education, 2002.
Sector 90, Noida For Best Deal and Discount Call
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
 Overriding Principles  Asset allocation  Cost allocation.
Know More : DNR Reflection - 4 BHK apartments in Whitefield Bangalore.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
Ministry of Roads and Urban Development Urban Development & Revitalization Corporation of Iran (Holding) December
Leveraging Funding and Outcomes through Partnerships Domenica McClintock, Cuyahoga County Board of Health Jan Bayne, Cuyahoga County Department of Development.
OPERATIONS MANAGEMENT STRATEGY 1. PRODUCT CHOICE 2. PROCESS CHOICE 3. FACILITIES CHOICE 4. QUALITY CHOICE.
Update on Oak Cliff Municipal Center Addition Economic Development Committee June 6, 2016.
Budget management March 20th 2017
Review: Implementation of Smart Cities Mission Haryana
L Zone Delhi.
Valley & Third Streets Redevelopment
Implementation of NIC E-procurement System (GepNIC)
Multi-storeyed Car Parking-cum- Commercial Complex at Nehru Place, New Delhi PROJECT DETAILS : This multistoreyed car parking and centrally airconditioned.
ART OF PREPARATION AND PRESENTATION OF PROJECT FEASIBILITY REPORTS
Air pollution reduction program in the Ulaanbaatar city’s Ger area
Surrey County Council – Development of the Asset and Place Strategy
Presentation transcript:

Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station & Vikas Bhawan

Table of Contents Salient Project Features Implementation plan Present - Proposed Facilities Financials Deliverables - Project Benefits

Project Features

Project Features Project Sites

THERE IS ADMITTED SHORTAGE OF GOVT OFFICE SPACE IN THIS AREA Project Background Govt has decided to decommission IP Power Station & has earmarked 15 acres from this to the DTC – but the land with Power Dept as of now. DTC will continue to have 3 acres of land on the western side of the Ring Road, ie the DTC Depot site, even after the East West Corridor. Vikas Bhavan complex (with PWD) of 6 acres was developed in 1970s and is worn out from insides. THERE IS ADMITTED SHORTAGE OF GOVT OFFICE SPACE IN THIS AREA The concept is to redevelop all these sites in manageable sequence. Avail the entire FAR. At no cost to Govt.

Project Proposal Developing an integrated office complex at the existing DTC Depot on the left over land of around 3 acres out of the 6 acres. Providing office space within the outer envelope of the existing IP Power Plant by making suitable modifications and providing facilities for bus parking in the low lying area used for coal storage for the Power Plant. Re-developing the Vikas Bhavan land to construct an integrated office complex.

Project Parameters The project to be implemented by DSIIDC on a Self-Sustaining Mode at no cost to the Delhi Government The facilities and infrastructure development as per norms of MPD 2021 DSIIDC to provide the residual value of Vikas Bhawan Complex to PWD (almost Rs 5 cr). Residual value calculated @ 100% of the original cost of the buildings. The resultant infrastructure will be state of the art and serve the needs of Depts in the immediate foreseeable future. DSIIDC can generate resources for this project out of long-term/short-term leasing out of the facilities to Governmental and non-Governmental Organizations/ Corporations etc. in accordance with the land use and Master Plan stipulations.

Demand for Office Space in Central Business District, Delhi MCD at the time of construction of Civic Centre assessed demand for office space from Govt. agencies. The following Govt. agencies requested space from MCD which could not be accommodated by MCD: Ministry of Finance Central Excise & Customs Life Insurance Corporation Ministry of Information Technology Ministry of Home Affairs Ministry of Agriculture Oriental Insurance Delhi Tourism Delhi Finance Commission Public Grievance Commission As may be seen from the above that there is huge demand for office space and the current project of DSIIDC could cater to a portion of the demand.

Implementation Plan

Project Implementation Plan The Power Department to vacate the Power Plant area within a year A detailed report will be got prepared by DSIIDC for the entire project (in 3 months). In next 3 months, DSIIDC to finalise agencies for modifying the interiors of the Power Plant that will provide modern office space and develop a semi-basement and open to sky bus parking for almost 600 buses. The redeveloped power plant complex will accommodate DTC Headquarters, other Govt Corporations and Bus Depot State of the Art Office Complex to be constructed at the current DTC location Government Departments currently functioning at Vikas Bhawan to be temporarily accommodated at the redeveloped current DTC depot (or at Metcalf house). Thereafter redevelopment of Vikas Bhawan Project to be taken up The entire project to be completed within five years from the date of possession of power plant site.

Present vs. Proposed Facilities

Present Facilities Site 1:DTC Current Status Picture showing the entrance to the bus depot Picture showing the administrative building

Proposed Facilities Site 1 Proposed Facility

Present Facilities Site 2:Power Plant Current Status View of the power station structure

Proposed Facilities Site 2:New DTC HQ & IP Bus Depot Proposed Facility

Present Facilities Site 3:Vikas Bhawan Current Status View of office buildings at Vikas Bhawan

Proposed Facilities Site 3: Vikas Bhawan 2015 Proposed Facility

Project Financials

Total Built-up Area- Site 1: Western Side/DTC Complex Project Financials Total Built-up Area- Site 1: Western Side/DTC Complex Total area 3 Acres 12,141 SMT FSI 2 # Basement area (double basement – for cars only) 14,000 Total Built Up Area 24,281 Usable area Area leasable 50 %

Total Built-up Area- Site 2: Eastern Side/Power Plant Complex Project Financials Total Built-up Area- Site 2: Eastern Side/Power Plant Complex Total area 15 Acres 60,703 SMT FSI -- Ground floor area (for car parking) 7,284 Total Built up area (internal modification) Leasable area ~8,000 Bus parking (semi basement + open to sky) 51,598 ~16,000

Total Built-up Area- Site 3: Vikas Bhavan Project Financials Total Built-up Area- Site 3: Vikas Bhavan Vikas complex existing Built Up Area ~20,500 SMT Total area 5.95 Acres Total area 24,059 SMT FSI 2 # Basement area 24,000 SMT Total Built up area 48,117 SMT Area to be returned to depts ~20,000 SMT Area for commercial exploitation ~28,117 SMT

Proposed Financial Structure Project Financials Cost Assumptions Particulars Data Cost of construction of building structure INR 25,000 per SMT Cost of construction of Vikas Bhawan INR 30,000 per SMT Cost of construction of basement INR 18,000 per SMT Cost of construction of bus depot INR 20,000 per SMT Cost escalation 6% p.a. Cost of making the building structure environmental friendly 6% of construction cost Construction period 2 years Contingency 25% of construction cost Payment to PWD as residual value for Vikas Bhawan INR 5 crore Proposed Financial Structure Particulars Data Equity 25% Debt 75%

Project Financials Project Cost Particulars Built up area (SMT) Cost of Construction (INR / SMT) Total Cost (In INR Crore) Site A (Western side) 24,281 25,000 62.52 Site B (Eastern side) 16,000 20,000 32.00 Site C (Vikas Bhawan) 48,117 30,000 181.97 Bus depot 51,598 106.29 Basement 45,284 18,000 81.51 Contingency cost 25% 116.07 Green Building Cost 6% 27.86 Total construction cost 608.22

Project Deliverables and Benefits

Project Deliverables Deliverables DTC to get developed bus parking for over 600 buses (covered parking for 300 and open parking for another 300 buses) free of cost, at IP Power Plant site. DTC to get around 8,000 sq. mtr. of built up office at, DTC IP Depot site free of cost. DTC to get around 4,000 sq mtr of built up office space at IP Power station site free of cost. Any increase in the DTC, IP Depot area may be adjusted on pro rata basis between DTC and DSIIDC. All Deptts at Vikas Bhavan will get modern office with area upto existing usage free (almost 2,00,000 sft) Remaining area will be leased out to Delhi Govt PSUs, GoI PSUs and other users at Market price. DSIIDC will maintain the complexes for 30 yrs and charge the users at actuals. Note: The requirements of the Transport Department/DTC will be accommodated subject to the techno- economic feasibility to be ascertained at the time of completion of Detailed Project Report.

Project Benefits Optimal utilization of land / asset Green building A time bound effort by DSIIDC Access to state of art commercial office facilities Construction of bus parking ~ 600 buses Reduction in pollution levels with decommissioning of the power plant No financial impact on Govt Deptts