BCRUA Deep Water Intake Alternative Site Study November 15, 2007.

Slides:



Advertisements
Similar presentations
Public Scoping Meeting December 3, 2012
Advertisements

Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Stave Lake Water Supply & Treatment Project. Existing Water Supply System Norrish Creek Cannell Lake 19 Groundwater Wells.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Energy Efficiency and Renewable Energy
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Bruce Moore, Manager Colorado River Division Southern Nevada Water Authority July 28, 2010.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
Geothermal Energy 2000 Geothermal Education Office.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
City of New Braunfels Edwards Aquifer and the Habitat Conservation Plan HCP Implementing Committee May 29,
Wareham Fire District Water Department Glen Charlie Road Water Storage Tank Special District Meeting June 23, 2009.
Other Environmental Issues U.S. Department of Housing and Urban Development Noise Endangered and Threatened Species Explosive/Flammable Hazards and Underground.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Water System Planning Study
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
Monterey Peninsula Water Supply Project April 23, 2012.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
ENVIRONMENTAL OPPORTUNITIES AND CONSTRAINTS ARCHAEOLOGICAL - HISTORICAL INVESTIGATIONS PERMITTING FOR UNAVOIDABLE ENVIRONMENTAL IMPACT AREA ENDANGERED.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
CHAPTER EIGHT LOCATION PLANNING AND ANALYSIS Chapter 8 Location Planning and Analysis.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
September 25, Who is Brushy Creek Regional Utility Authority? Local government corporation formed by Cedar Park, Leander and Round Rock to access,
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
1 Completing the CEQA Checklist Terry Rivasplata.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
Foxfire Village Water Service from Moore County Foxfire Village Council Meeting April 11, 2013.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
Storm Water Management at MSU Ruth Kline-Robach Michigan State University Institute of Water Research Dept. of CARRS.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
Multnomah County Central Courthouse Site Due Diligence Update April 9, 2015 JD Deschamps Mike Pullen Mike Day.
Highland Park Country Club
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
Anniston PCB Site Review of Risk Assessments for OU-1/OU-2
INTRODUCTION TO TRENCHLESS TECHNOLOGY
Wind power Windmade want to build a wind farm.
Little Rapids Habitat Restoration St
Water Reclamation Plant Feasibility Study Update May 28, 2014
Potholes Supplemental Feed Route Project
Joshua Basin Water District Draft Findings & Rate Scenarios
Overview What is the CEQA environmental review process?
Water Reclamation Plant Feasibility Study Update
Capital Area Council of Governments
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Brackish Water Desalination Project Draft EIR
City of Sunrise Wastewater Reuse Program
Presentation transcript:

BCRUA Deep Water Intake Alternative Site Study November 15, 2007

Project timeline Phase 1 – 30 mgd (summer 2010) – Floating intake – 78-inch raw water pipeline – Regional water treatment plant – Treated water pipelines to Leander, Cedar Park, Round Rock Phase 2 – 70 mgd (2016) – Deep water intake (may be accelerated depending on lake levels) – 84-inch raw water pipeline from intake to Phase 1 pipeline – Water treatment plant expansion

Phase 1 Intake Floating intake will utilize existing “Twin Creeks” barge Barge will be expanded with eight new pumps Expected to operate until deep water intake is constructed

Phase 1 Intake (cont’d) Twin Creeks Intake Cedar Park Intake View looking west from shoreline

Need for Deep Water Intake LCRA manages Lake Travis LCRA’s management plan predicts Travis may drop below elevation 576 in a severe drought An intake below 576 is required to ensure water is available in such a drought

Need for Deep Water Intake (cont’d) Deep water is only accessible near the original river channel The Volente area offers access to deep water and is in closest proximity to the BCRUA, Cedar Park, & Leander/LCRA plant site

Site Alternatives Study To determine which site is the most suitable for an intake structure Seven sites in the Volente area under study Four types of intakes under study

Site Alternatives Study (cont’d) Selection will be based on multiple criteria: – Minimizing cost – Compliance with regulatory requirements – Minimizing social impacts – Minimizing environmental impacts Elimination of all impacts is an unattainable goal

Site Alternatives Study (cont’d) Social impacts include: – Construction impacts (noise, dust, traffic disruption, etc.) – Aesthetics (visibility, architecture, lighting, noise, traffic, etc.) – Recreation impacts (restricted area, navigation hazards, etc.)

Site Alternatives Study (cont’d) Environmental impacts include: – Construction impacts (noise, dust, etc.) – Geologic impacts (groundwater, karst) – Habitat impacts (endangered species, particularly birds and karst invertebrates) – Water quality

Alternative Sites

Alternative Intakes Four types of intakes to be evaluated at each site: – Microtunnelled lake tap – Microtunnelled lake tap with remote pump station – Tower – Inclined pump

Microtunnelled Lake Tap

Microtunnelled Lake Tap (cont’d) Advantages: – No structure in lake – Maximum opportunity for aesthetic/architectural compatability with surroundings Disadvantages: – Second most expensive to construct – Cannot be located in flood plain – Must be within 1,200 feet of deep water

Microtunnelled Lake Tap with Remote Pump Station Similar to Microtunnelled Lake Tap, but a smaller gate shaft near the lake feeds water through a deep tunnel to a pump station further away from the lake A smaller building is located at the lake The larger pump station is located elsewhere

Microtunnelled Lake Tap with Remote Pump Station (cont’d) Advantages: – No structure in lake – Maximum opportunity for aesthetic/architectural compatability with surroundings – Gate shaft might be in flood plain with suitable design Disadvantages: – Most expensive to construct – Gate shaft must be within 1,200 feet of deep water

Tower Intake

Tower Intake (cont’d) Advantages: – Moderate construction cost – Can be constructed in flood plain Disadvantages: – Large structure in lake – Increased visibility

Inclined Pump Intake

Inclined Pump Intake (cont’d) Advantages: – Lowest construction cost – Pump station can be constructed in flood plain Disadvantages: – Inclined pumps have increased maintenance problems, and 2,000 HP installations are unproven – Pump barrels are exposed on lake shore

Site Selection Process Study Initiation – Public meeting to solicit comments and future participation Technical/Feasibility Review - Evaluate 28 alternatives for feasibility, cost, pipeline routing (approx 2 months) – Working meeting to discuss findings and review selection criteria and weighting factors Environmental/Social Impacts Review - Evaluate selection criteria (approx 2 months) – Working meeting to present preliminary selection and solicit input Finalize Selection - Evaluate comments and update selection matrix (approx 1 month) – Working meeting to present final selection

Questions & Comments  Please - Provide comments regarding: Selection criteria Alternative sites, any other potential sites within the study area Intake alternatives - Hold all questions relating to water rights, alternative sources, and participation in the City of Austin’s project