Consultant en énergie éolienne au service du monde Wind energy consultant for the world Wartenbe Wind Energy Project by Dokie Wind Energy Environmental.

Slides:



Advertisements
Similar presentations
Acton Quarry – Proposed Extension Natural Environment Pre-Submission Liaison Committee Information Session January 22, 2009.
Advertisements

1 Siting, Real Estate and Interconnection Issues for Wind Projects Tim Conboy IPED Financing Windpower May 8, 2008.
Proposed Quintette Mine Re-opening February 2011.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
LEGG PARK DOG PARK PROJECT DESIGN Prepared for: Meridian Township Parks Commission Board August 9, 2011.
The Natural Values of the Kimberley. Introduction This section of the eNGO presentation will talk briefly regarding the natural values of the Kimberley.
Lenape Lenape Energy sources: Geothermal- 4,000 MW Hydroelectric- 10,000 MW Nuclear- 6,000 MW Wind- 3,000 MW Tidal – 2,000 - MW (Import from Paradise)
SkyPower Corp. PRESENTATION.
Draft Policy Overview Utilities & Renewable Energy Planning Study Presentation By: Tim Cane, The Jones Consulting Group Ltd. November 12, 2008 Township.
Environmental Impact Assessment: A Land Use Planning Tool Diane Sherman, Ben Purdy, and Sara Felker Department of Resource Development Introduction Environmental.
Balancing renewable energy and the need to preserve biologically significant landscapes Photo courtesy of
Integrated Assessment of Off-shore Wind A Research Partnership between: Grand Valley State University Michigan Alternative and Renewable Energy Center.
OVERVIEW – SUNDANCE WIND PROJECT PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND Ron Percival Avro Wind Energy Inc. October, 2014.
Calvin College Wind Energy Project Engineering 333, Fall 2006 Calvin College Wind Energy Project Engineering 333, Fall 2006 To demonstrate Calvin’s interest.
Patrick Kearon The Bristol Port Company
Applying First Nations Traditional Knowledge to Reclamation in the Oil and Gas Industry West Moberly First Nations Traditional Knowledge Project Oil and.
The Wind Energy Center at UMASS University of Massachusetts Patrick Quinlan Associate Director UMass Wind Energy Center Amherst, Massachusetts Site Considerations:
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
Centrica – An Energy Utility Perspective Gearόid Lane Director, British Gas New Energy 29 th April 2009.
Land Use Plan Pilot Overview Land Use Planning Meeting Bingwi Neyaashi Anishinaabek First Nation August 11, 2011.
First Nations-Focused Scientific Reviews of Environmental Assessments MSESMSES Prepared by Sarah Hechtenthal, M.Sc., P. Biol.
MAFMC 5-Year Strategic Plan Public Comments August 14, 2013.
St. Johns River Water Management District Surplus Property Proposal Jones Avenue Parcel March 12, 2013 Community, Environmental, Development Services Department.
Public Information CentrePartners in Powerful Communities Welcome to our Public Information Centre.
Institutions and Processes for Scaling Up Renewables: Run-of-River Hydropower in British Columbia Mark Jaccard, Noel Melton and John Nyboer Energy & Materials.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
Confidential Project Update: District of Chetwynd Bruce Wells, Vice President, Project Development February 02, 2015.
North Slope Rapid Ecoregional Assessment Intermediary results on human footprint and social and economic MQs Update to the AMT and Techteam October 20,
Sustainability Overview Laura McCann, on behalf of Alison Goss Eng U.S. Department of Energy Office of Biomass Program February 23, 2010.
Project Presentation to City of Bethlehem Environmental Advisory Council February 2, 2011 Call Mountain Wind LLC A Joint Venture Between Citizens Energy.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
 Part 2: Community Design: Respect and Care for the Natural Environment Joe Duggan 1.
Atlin/Taku Land Use Planning Forestry Chapter Presentation to Multiparty Workshop #4 June 19, 2009.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level I.S.393:2005 Technical Guideline.
W IND E NERGY C HALLENGES. W IND ENERGY HAS MANY BENEFITS Oil independence Locally produced (jobs) No air pollution (or CO2) Uses no water Renewable Lower.
Wind Power Jennifer Malaga Mister Diaz Leidy Colon.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Wind Energy Developed and presented by Ed Shoener To Wilkes University FYF 101J 19 November 2007.
City of Fort Collins Wind Power Program March 24, 2004 John Phelan, PE Energy Services Engineer.
1 Managing Cumulative Impacts SCEK Forum June 10, 2004 Fort St. John.
Town of Orleans Wind Energy Project Berkshire Renewable Energy Summit June, 2005 Kevin Galligan
Consultant en énergie éolienne au service du monde Wind energy consultant for the world Dokie Wind Energy Project by Dokie Wind Energy Environmental Assessment.
Author name here for Edited books chapter 5 Facility Site and Design 5 chapter.
Welcome to Xeneca’s Final Public Information Centre for the Ivanhoe River: The Chutes Project Today’s PIC will give you the opportunity to learn more about.
I NTRODUCTION TO W IND E NERGY. Outline How is wind created? Where is the wind? How do we measure the wind? How does a wind turbine work? What are the.
EIA in Pakistan Brief background and History of the National EIA system. It started with the promulgation of Pakistan Environmental Protection Ordinance.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
CONCLUSION AND SUMMARY. How has (NLCA) been met? a) whether the project would enhance and protect the existing and future well-being of the residents.
Wind Power Renewable energy.
Whistler Nordic Center: A systems perspective of the Callaghan Valley EIA Process Dan Kellar Wilfrid Laurier University October 20 th 2007.
Waterbody Classification Project A project of the Lakes and Watershed Commission, Dane County Department of Planning and Development, and the Dane County.
Planning Scotland’s Seas consultation Seas Consultation 2013.
Every state in the nation benefits from wind energy.
Parc des Chutes- de-la-Chaudière Mini Hydro Project: Enhancement Through Development Lessons from a success story by Jean–Pierre Fau and Guy Dufort.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Nunavut Water Board Public Hearing
Range Management in the Face of Climate Change
Sylvia Barova Unit B.3-Nature, DG ENV Habitats Committee
SEQRA as a Tool to Review Energy Projects
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
EU Raptor Conservation Strategy Memorandum of Understanding on the Conservation of Migratory Birds of Prey in Africa and Eurasia.
Mary River Project Phase 2 Proposal Cumulative Effects
Environmental Priorities Environmental Impact Assessment
MINI -HYDROPOWER Climate friendly but not devoid of environmental and social risk.
Presentation transcript:

Consultant en énergie éolienne au service du monde Wind energy consultant for the world Wartenbe Wind Energy Project by Dokie Wind Energy Environmental Assessment Application An Overview Working Group Meeting Fort St. John, British Columbia, Feb

Hélimax Presentation Outline Overview of the Project Constraints Analysis and Layout Environmental Assessment –Public consultation –First Nations consultation –Summary of effects –Overview of cumulative effects

Hélimax The Project Maximum build-out of 47 turbines, 70.5 MW capacity GE 1.5 MW turbine, 80-m hub height, 77-m rotor diameter Located on Mount Wartenbe, between Highway 97 and the Lone Prairie community Supply for estimated 20,000 households Submission to BC Hydro CFT this summer Proposed commissioning date: 2008

Hélimax Location of Project

Hélimax Constraints Analysis and Project Layout Layout has considered a set of constraints –Sensitive ecosystems/areas – 200-m buffer –Traditional land use sites – m buffer –Watercourses, waterbodies – 50-m buffer –Slopes - > 15% slopes avoided –Existing access roads – 50-m buffer –Dwellings – 500-m buffer –Transmission lines – 150-m buffer –Pipelines – 150-m buffer Minimise impact

Hélimax Layout/Footprint Map

Hélimax

Public Consultation Issues scoping/terms of reference –Open house in Chetwynd June 13, 2005 –Approx. 40 attendees –Positive feedback from the community and few issues raised Public Comment Period: to March 31st 2006 –Open houses in Chetwynd, Hudson’s Hope and Fort St. John (Feb 20-22) –Additional meetings with the Lone Prairie grazers and the community; a number of concerns expressed –Support from Chetwynd municipality

Hélimax First Nations Consultation First Nations Consulted West Moberly First Nations Saulteau First Nations McLeod Lake Indian Band Halfway River First Nations Various meetings/discussions since Spring 2005 Issues identification Involvement in field work Letters of support and MoU signed Review of Application Benefits package under discussion

Hélimax Summary of the Environmental Assessment Effects on the « Biophysical » Environment –Air and Climate –Terrain and soils –Hydrology, water quality and aquatic resources –Vegetation –Avifauna –Bats –Terrestrial Fauna –Archaeology All baseline/field work undertaken in Spring, Summer and Fall of 2005

Hélimax Effects on the « Socio-Economic » Environment –Land use (mostly grazing) –Economics and community settings –Landscapes –Acoustic environment –Communication systems –Public health –First Nations communities

Hélimax Summary of Effects Considered a low-impact project Project-specific effects on the biophysical and socio-economic environments are of minimal, low or moderate concern, and not significant –Application of setbacks for project configuration –Small footprint –Access management –Land use compatibility –Commitment to apply several component-specific mitigation measures –Benefits package to Lone Prairie community and grazers –Benefits package to First Nations –Overall visual impacts are not significant, but visual impacts on the Lone Prairie area is considered of « medium concern »

Hélimax Overview of Cumulative Effects Cumulative effects are considered of minimal to low concern and not significant for most components Cumulative effects considered significant for rare ecosystems, breeding birds and wintering birds –Contribution of Project is however considered not significant