Kick Off Meeting City of Pensacola April 18, 2011.

Slides:



Advertisements
Similar presentations
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Advertisements

DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.
Louisiana Safe Routes To School Program
NEPA and Property Acquisition May 19, 2014 Elizabeth Patel Environmental Protection Specialist FTA Office of Planning and Environment.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
CONNECT COBB Northwest Transit Corridor Alternatives Analysis Town Center Area Community Improvement District Update March 27, 2012.
Northwest Florida Transportation Corridor Authority.
Environmental Assessment Public Meeting
PUBLIC HEARING | JUNE 10, Pensacola Bay Bridge Replacement Project Development & Environment Study Escambia & Santa Rosa Counties State Project.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
Multi-Modal Transit Center at Taylor Street: Project Overview and Uses for the Upper Floors Public Forum October 16, 2013.
Longmeadow Parkway Fox River Bridge Corridor
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
Andrew Winga, P.E. – WisDOT Project Manager.  Background on numerous Transportation Studies  What is a Planning & Environment Linkage Study  Problem.
Community Context Audits And Public Involvement Plans Rickie Clark, INDOT Joyce Newland, FHWA Presenter Title, INDOT Event Date.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Study Advisory Meeting June 11, Study Advisory Meeting June 11, 2008 Project Development Process Planning Study (Recommendations) Environmental.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
1 Bridging the Gap ( Ensuring Seamless Integration ) Mike Hines, FAA John van Woensel, PB Aviation Bill Willkie, RS&H December 16, 2015 Crystal City, Virginia.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
Visit Our Website at: Click to edit Master title style.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Multnomah County Central Courthouse Site Due Diligence Update April 9, 2015 JD Deschamps Mike Pullen Mike Day.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Willow Meadows Civic Club Meeting September 13, 2011
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
Bill Good Chief Operations Officer
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Rail Program Management Services
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
White Flint North Entrance Feasibility Study
I Street Bridge Replacement Project
Presentation transcript:

Kick Off Meeting City of Pensacola April 18, 2011

Study Purpose Determine the best solution for replacement of the existing bridges and secure FHWA approval of the location and concept design Basis for performing the replacement bridge study Lack of modern safety provisions No facilities for bikes and pedestrians Does not meet current navigation requirements Deteriorating conditions indicate that bridges are structurally obsolete Determine the requirements to meet increasing traffic demands

Project Development & Environment Study Planning Preliminary Design Final Design Right-of-Way/ Acquisition Construction Candidate Projects Based on Preliminary Analysis and determination of need Prioritize Projects Funding Options/Availability Reviewed/Programming Develop Preliminary Alternatives Assessment of Potential Environmental & Community Impacts Substantial Public Involvement Initiatives Preferred Alternative(s) advance to Preliminary Engineering Develop up to 30% Design Plans Additional Public Outreach Agency Coordination Proceed through Design, 60, 90 % plans Permitting Process Final Cost Estimates Proceed with acquisition of necessary property

Project Development & Environment Study Evaluate Current Conditions – Data Collection Environmental, Social, Engineering Forecast Future Needs – Traffic Evaluate Alternative Corridors & Select One Develop Alternatives Within Selected Corridor Perform Assessments of Potential Environmental & Community Impacts Select an Alternative to advance into Preliminary Engineering

One – On – One Meetings Website pensacolabaybridge.com Newsletters Community Stakeholders Neighborhood Associations Informal Public Meetings Special Interest Groups Project Advisory Group (PAG) Local, State & Federal Officials Local Government Throughout the study conduct a comprehensive and continuous Public Involvement Program

Contact US!! J. Brandon Bruner, PE Project Development Engineer FDOT, District Highway 90 Chipley, FL Dan Kristoff, PE Project Manager RS&H Deerwood Park Blvd South Jacksonville, FL Phone: Nick Arnio, PE, PTOE Deputy Project Manager RS&H 1701 Hermitage Blvd., Suite 101 Tallahassee, FL Phone:

Kick Off Meeting City of Pensacola April 18, 2011