Traffic Flow Analysis Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.

Slides:



Advertisements
Similar presentations
Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Advertisements

Introduction to Transportation Systems. PART II: FREIGHT TRANSPORTATION.
How can you stay safe? At the bus stop At the bus stop Travelling on the bus Travelling on the bus How can you help the driver? How can you help the.
Try and arrive at the bus stop 5 minutes before your bus is due to arrive. Wait sensibly at the bus stop. Have your bus pass ready to show the driver.
Card Order Basics. Card Order Basics What is It? –An advanced scheme for operating a model railroad –Allows for a realistic means of determining what.
School Bus Safety.
Transportation Tuesday TRANSPORTATION TUESDAY Not everyone has their own vehicle. Many of us (and many of our children and parents) rely on public transport.
Model RailRoad Manager Simulate Prototype Operations on your Railroad.
Model Railroading Operations 101: Part 4 – Advanced Topics Seminar - Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher,
Operations on the BDMRR Dispatching for the Birmingham District Model RR.
TELE202 Lecture 8 Congestion control 1 Lecturer Dr Z. Huang Overview ¥Last Lecture »X.25 »Source: chapter 10 ¥This Lecture »Congestion control »Source:
Or Stop that train going round and round It’s making me giddy!! This presentation will run itself – no batteries required. If you are using Internet Explorer.
Honda Shadow Owners UK 2nd Person Drop Off Bike Convoy
0 SCO90 What it is? What it Does? How does it affect Car Hire? Lisa Gering November 10, 2010.
Local Switching Operations Steve Prevette PNR Vice President Burnt Hills and Big Flats RR
Freight Car Forwarding Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.
SHARING THE ROAD WITH HEAVY VEHICLES You don’t have to be told there are a lot of trucks on the road. But do you always drive or ride with trucks in mind?
Model RailRoad Manager Quick Start: Automated Traffic Generation.
Realistic Operations for Model Railroaders by R. B. Trombley, MMR PSR – NMRA Rev May, 2011.
But fines vary depending upon location. WHY ARE THOSE CHAIRS THERE?
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 13 MATERIAL HANDLING SYSTEMS E. Gutierrez-Miravete Spring 2001.
TRAIN OPERATIONS IN THE GARDEN
CE 515 Railroad Engineering Armstrong Chapter 8: Railroad Operation – Moving From Here to There “Transportation exists to conquer space and time -”
Lesson 4: Percentage of Amounts.
Using Model Railroad Switch List Software
Model RailRoad Manager Inventory Management. Inventory: Rolling Stock and Everything Else l Locomotive, Freight Cars, Passenger Cars, Caboose, MOW l Trackage.
OPERATIONS – A Starter Kit
B&O CAR CARD AND WAY BILL OPERATIONS. INTRODUCTION To date, the B&O model railroad has directly written switch-lists for movement of cars. By moving to.
COPYRIGHT © AREMA : 1 of 21 Module 2: Train Operations.
1/33 Team NCKU lead by I-Lin Wang INFORMS RAS 2014 Problem Solving Competition Team NCKU (National Cheng Kung  I-Lin Wang (Associate.
Model Railroading Operations 101: Part 4 – Advanced Topics Seminar Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher,
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Model Railroad Operations Prepared by Dick Roberts, MMR My thoughts on the subject, presented with the assistance of all those operators who have gone.
Solving Equations. A quadratic equation is an equation equivalent to one of the form Where a, b, and c are real numbers and a  0 To solve a quadratic.
Physics 4 Force and Motion. C/WForces13-Oct-15 Aims:-4 know what forces do 5 explain where forces are balanced 6 apply rules to new situations Starter.
Andy Stobie’s Indoor G scale layout -Original configuration - Reconfigured Design.
Title 5 Emissions Quantification © Dr. B. C. Paul.
School Bus Safety Policy for Podar Jumbo Kids BUS STUDENT TRAINING.
Cushing ISD Police Department Chief of Police Shane Johnson Presents School Bus Safety.
We came up with the general rule for expanding binomials, in particular squaring the sum and difference of two terms:- (a + b)²= a²+ 2ab + b² and (a –
Director Rules and Field Support October 30, 2006.
City and Parking Strategies / Rules of Road Hill Parking.
District 200 High frequency words
Measures of variability: understanding the complexity of natural phenomena.
1 Introduction to Transportation Systems. 2 PART II: FREIGHT TRANSPORTATION.
Chapter # 10 Data Transfer Prepared by :Sir Mazhar Javed.
Representing Motion Investigation 4. Part 1 – Complex Motion.
Intersections.
ACACSO Workshop Car Hire Rule 22 November Memphis, Tennessee J. D. Pavek The Greenbrier Companies.
Residential – part B RAILROAD SITUATIONS What must you do at all railroad crossings? Slow down and check both ways. However, you must stop when the.
May 2015Sorting NetworksSlide 1 Sorting Networks A Lecture in CE Freshman Seminar Series: Ten Puzzling Problems in Computer Engineering.
Please CLOSE YOUR LAPTOPS, and turn off and put away your cell phones, and get out your note- taking materials.
1 BLUE SIGNAL PROTECTION Blue Signal Protection of Workmen This rule outlines the requirements for protecting railroad workmen who are inspecting,
Algebra Tiles How to sort, making the equation smaller and easier: 2x+1x+3 to 3x+3 How to make zero pairs, 1x+-1x=0, then take them away from the equation.
Operations on the Pennsylvania Southern Railroad Presented by Bob Weinheimer 2009 Version.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
HOW TO REVISE Use all your brain’s skills and as many senses as possible. This will be ‘active revision’.
CE2303 Railway Engineering
Ozoblockly Lesson 03 Beginner Programs
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Burnt Hills and Big Flats Railroad Employee Training
Presented by: JoAnne Miner Director
Jackie Singer CN System Manager – Business Process Optimization
Operations on the Pennsylvania Southern Railroad Presented by Bob Weinheimer MMR National Model Railroad Association Cleveland 2014 July, 2014.
Title: Mr. Santoro Gets Delayed
Sorting Networks A Lecture in CE Freshman Seminar Series:
Andy Stobie’s Indoor G scale layout
* What good manners look like at home
I believe the reason students have difficulty learning algebra and that most people have trouble doing math word problems is that although children are.
Presentation transcript:

Traffic Flow Analysis Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University

Have you ever operated on a layout where: Every town is a switching puzzle? Sat in siding for two (real) hours waiting for traffic to clear to do switching? When you are cleared you have five (fast) minutes to work? Five trains are stacked up trying to get into the yard?

Operations is Fun But just as lack of good trackwork, bad equipment, lots of derailments can reduce the fun So can bad traffic flow

Old Ideals, New Ideas Paired Industries No more than one of something Point-to-Point (with yards at each end) Complete, self contained world On-line to Off-line Multiple copies (or big!) Might not even have a classification yard Interchanges Staging Tracks

Queues Not “Q”, but waiting lines Especially on a model railroad, “rolling stock” spends most of its time, well, not rolling! Distances are compressed, running times shortened.

What does our rolling stock do? waiting at an industry to be unloaded / loaded waiting at an interchange waiting in a train on a staging track waiting in the classification yard for the next train waiting on empty car tracks (home road cars) enroute on a train.

Staging!

Suggested Capacities 1.Industrial Trackage - 40 to 60% loading. 2.Interchange - 80 to 90% loading 3.Staging 80 to 90% loading 4.Classification Yard - 30 to 60% loading 5.Empty Car Storage - 80% loading 6.Enroute trains at end of session - 80% loading

Basis for Siding Capacities Personal Experience When you have to do a lot of puzzle switching, it gets very difficult above 60% If you are just dropping a cut of cars in a siding, then 90% is no problem, the only issue is will you overflow the siding

Classification Yards On the average, 50% of the cars for any given train will be waiting in the yard The Yard is the most likely choke point on a model railroad Do everything you can to make the yard crew’s life easier

Train Lengths The standard deviation is the square root of the average number of cars for the train For a 16 car train, the standard deviation is 4. (for 100 cars, 10) 90% of the time this train will be 10 to 22 cars long. (plus or minus 1.64 s.d.) Note – for model railroad train lengths, there is high variability compared to prototype

What Trains To Run Make a schematic Record car capacities Apply suggested capacity rates Determine local train lengths (I like 8) Group sidings/towns into groups twice the size of the local train length (for me, 16)

Locals Once you have a group of sidings to service, operate train from staging or classification yard Return to origination (turn) or continue on to staging or another yard Consider leaving blocks of cars for pickup by through trains You may want the local to block cars prior to return to yard

Through Trains If you like long through trains, consider only dropping off and picking up blocks of cars along the way between staging yards rather than classifying the whole train. You can make it easier on the yard by having a strategy (connections) for the through trains

Classification Yards Remember, the yard is NOT a destination, only a waiting room Check expected capacity needed based upon the 50% rule 90% of the time there will be less than X times the square root of X cars in the yard if X is the average loading of the yard.

Methodology Draw your schematic Tabulate all track capacities Apply the ratios to determine how many cars the layout will support Determine which trains will be run (locals and through) Balance the classification yard

Sample Calculations

Crew Instructions 10:50 AM NE ‑ 84 Washington DC ‑ Portland ME (Thanks to Lee Nicholas for concept) "The Alphabeter" Engine: ___________ Max Train Length: ___________ Origination: LV Sibley Main 1. Leave LV Coxton Yard northbound. 2. At Mayfield Main Yard, setout all non ‑ BLUE cars. Pickup BLUE cars. 3. Proceed northbound to Sidney. Run around train, push train through GX Tower. 4. Proceed forward (Eastbound) on D&H (Track 5).

Appendix – Unclog the Yard Operating philosophy – don’t make up trains. Break down trains. Hunting for cars from various tracks to make a train is very inefficient. Pull a track (or incoming train) and completely classify it. Have through trains bypass the yard, or only pause to setout and pickup a limited number of cars. Make sure engine movements and caboose movements are efficient

Rule of Thumb – if trains are running randomly, on the average, one half of all of the cars for every train will be in the yard. If you need to save yard capacity, don’t run trains randomly – set up the sequence of trains such that if a train drops off cars, they are intended for the next couple of trains. Pickups should also be planned so that they pickup from a recent arrival. Run multiple “copies” of the same train. This will reduce the number of cars waiting for the train. Run unit trains Pass blocks of cars from one train to another that do not require sorting

Station a second crew to handle local industries, hostle, or even secondary classification Double-end yard tracks Have crews block cars before they arrive at the yard. Pre-block trains that start in staging Give road crews a place to pickup and setout blocks to locals away from the main yard. Start the session with the yard well organized Give locals a place to organize their trains away from the main yard.