Renovation Update Meeting: November 11, 2011. Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.

Slides:



Advertisements
Similar presentations
Exterior Window and Door Frames
Advertisements

Bud Jacksons Sportsmans Bar & Grill 2209 Adams Avenue As purchased in 2003 Built circa 1920 Legacy restaurant and bar facility Existing service area: 3,446.
Tam Valley School Modernization - Phase 1 Summer 2011.
1 Zero Tax Increase Referendum: Community Information Session.
Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
BUILDING PATHOLOGY AND DIAGNOSTIC case study: HOTEL ALBERI via lungo lario Isonzo –LECCO- STUDENTS: Janaina Gerde Muniz Gerardo Diosdado Espinosa Marco.
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
SUNY Canton Facilities Project Update Miscellaneous.
Movable Insulation Jennifer Durham.  Usually insulation is used inside walls, ceilings, and floors to trap heat and create a thermal envelope.  Windows.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Johanna Mikitka AE-390 October 13, 2004
State of Wyoming Capitol Upgrades and Renovation projects Photos of the skylight and lighting project will be shown in chronological order, followed by.
Infrared Thermography and The Building Envelope Regardless of the building type involved, infrared thermography can provide remarkable, nondestructive.
Skinner Building, Seattle Team:BenBruceCarriePegRichardRobert.
Elevations.
Expo Rail Operations and Maintenance Facility Expo Line Community Meeting Maintenance Facility Design Workshop January 23, 2012.
FOR SALE: 122 North Jefferson St Historic Newtown District Staunton VA $250,000.
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Energy Performance and Moisture Control of Ceilings and Roofs 1.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Finishing the Building
School Opening Readiness Highlights Report of the Superintendent August 20, 2015 Superintendent Evaluation Rubric Standard I, Indicator I-B,
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
DER – Before, During and After: A Homeowner’s Perspective.
Building Plans.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Winchester Medical Center Campus Expansion June 21, 2011.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
ID 320 – LIGHTING\ACOUSTIC\HVAC Done by: Amjad AlFawaz
POV Renovations November 14,2014. Repairing the East Wall.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
ASSIGNMENT. Luanda, Angola Latitude: 8° 50' 18 S Longitude: 13° 14' 4 E.
Learning, Health, and Safety Capital Project Alternates and Change Order
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Windows and doors Why do we have windows? – Light – Ventilation – Beauty – Energy (heat and cold, in and out) – View, etc.
Building Renovation Updated Plans. Welcome History Original structure was built during Civil War Past renovations – 1961 – 1978 – 2001.
Windows & Doors Chapter 8. Windows Provide natural light, air circulation, and a view for the home and members living in the home Also serve as a point.
White Pigeon Community Schools
Energy Codes and the Building Envelope
Signage Upgrade Project 2016
Fun Facts: James M. Bennett High School
The photo is showing the south side of the building and configuration of the exterior side of the windows. Page 1, 2, and 3 of the Pella Window Elevation.
Arch205 building construction Windows- glazed curtain wall, skylights
The photo is showing the south side of the building and configuration of the exterior side of the windows. Elevation designs describe the materials and.
Lehigh Valley Heritage Center
New White Lake Township Library
Wall and Ceiling Construction
Capital Outlay Workshop
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Mandeville Center Upper Level West: Interior Inaccessible Element
Stoughton Public Library
Question 1. Question 1 What is 10 x 40? A 40 B 400 C 4000 D 4.0.
Presentation transcript:

Renovation Update Meeting: November 11, 2011

Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace

Renovation Update Meeting: November 11, 2011 River Pavilion exterior with new glass & metal panels Vestibules to be renovated during Fall 2012

Renovation Update Meeting: November 11, 2011 River Pavilion interior, with new lighting, painted space frame, rebuilt walls, new floor, revised HVAC system.

Renovation Update Meeting: November 11, 2011 Completed Galleria North wall: New glass, lighting, paint, air duct & duct enclosures, plenum boxes, wall boxes for power, telecom & data.

Renovation Update Meeting: November 11, 2011 New metal panel wall (Façade 6) at 34th St. & West Side Highway

Renovation Update Meeting: November 11, 2011 New Administration Entrance Vestibule

Renovation Update Meeting: November 11, 2011 Interior of Administration Entrance – Suspended ceiling, recessed lights, perimeter linear diffusers, sliding glass doors, new security cameras

Renovation Update Meeting: November 11, 2011 Northeast faces of Crystal Palace nearing completion

Renovation Update Meeting: November 11, 2011 Southeast faces of Crystal Palace – Curtainwall removal and replacement

Renovation Update Meeting: November 11, 2011 New North Concourse Entrance Vestibule between column lines 800 & 900 under construction

Renovation Update Meeting: November 11, 2011 New Skylight at top of Crystal Palace

Renovation Update Meeting: November 11, 2011 New Skylight Gutters at NN Cube of Crystal Palace – Looking East

Renovation Update Meeting: November 11, 2011 Moving Phases in Level 3 Expo Hall – Phase 4 teardown

Renovation Update Meeting: November 11, 2011 Northwest face of Crystal Palace and North Galleria complete; New RTUs through Phase 4 visible. Lightweight Concrete on top of insulating foam.

Renovation Update Meeting: November 11, 2011 Lightweight Concrete completed through Phase 3, surrounding new RTUs & duct. Second layer of waterproofing material applied above concrete in Phases 1 & 2

Renovation Update Meeting: November 11, 2011 MTA construction east of 11th avenue, Adjacent to Javits level 1 construction

Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

Renovation Update Meeting: November 11, 2011 JAVITS CENTER NORTH EXTERIOR BANNER SYSTEM

Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

Renovation Update Meeting: November 11, 2011 M34 Select Bus Service and New Stops

Renovation Update Meeting: November 11, 2011 M34 Select Bus Service and New Stops