ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.

Slides:



Advertisements
Similar presentations
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Advertisements

North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
Capacity Project – C1 Interconnection points Blaregnies / Taisnières Medelsheim / Obergailbach Gas Regional Initiative – North West Region Capacity Day.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Welcome to the Workshop on Interconnection Points: Welcome to the Workshop on Interconnection Points: Taisnières / Blarégnies / Quévy Oude Statenzijl /
Gas Regional Initiative – North West Region Pierre-Marie Cussaguet (CRE) Dr. Stefanie Neveling (BNetzA) Bonn Workshops 8 and 9 Feb Workshop: Interconnections.
Gas Regional Initiative North-West Gas Balancing Dublin Workshop 24 th April 2007 Steve Pownall.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
1 Day Ahead Auctions Making progress, Jour Fixe Day Ahead Auctions pilot 14 th of September 2007 Jour Fixe The Hague Conclusions and homework Chair DTe.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Workshop on transportation routes Region South-South East 24th November 2006, Vienna.
Gas Regional Initiative – North West Region RCC meeting The Hague – 5 th July, 2010 Secondary capacity markets Project update.
1 Capacity and Congestion Management Duties of TSOs - Availability of infrastructure and capacities for shippers to fulfil their supply obligations - Guarantee.
Congestion Management
GRI North-West Meeting
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Gas Regional Initiative North-West
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
2009 TSO Transparency Gas Regional Initiative North-West
GRI NW TRANSPARENCY PROJECT
GRI North-West Meeting
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
GRI North-West Meeting
EUROPEAN TRANSPARENCY UPDATE
EURELECTRIC transparency requirements
DAILY CAPACITY PUBLICATION
Presentation transcript:

ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting BEB, E.ON GT, GTS and WINGAS TRANSPORT Paris,

Paris, 11 May Status quo TSOs answers/proposals Contents

Paris, 11 May Situation Bunde/Oude Statenzijl (H-Gas) Direction Netherlands-Germany GTS Netherlands BEB E.ON GT WINGAS TR. Germany Direction from Netherlands is the historical flow direction The upstream capacity on the Dutch side can be allocated in different ways to the exits Joint scrubber leads to cross- influences of exit capacities to E.ON GT and Wingas Transport

Paris, 11 May Situation Bunde/Oude Statenzijl (H-Gas) Direction Germany - Netherlands GTS Netherlands BEB E.ON GT WINGAS TR. Germany Demand of capacity in the East- West direction developed long after demand for capacities in the West-East direction Expansion projects were initiated by TSOs Because of the specific physical grid situations, capacity increases were accomplished earlier on the German side

Paris, 11 May Status quo: Answers 5.1 and 5.2 1) Maximum implementation lead time: 10 days 2) More than 3 months and less one year: 3 months 3) New cooperation agreement IssueGTSBEBE.ON GT WINGAS TRANSPORT Applied booking procedure (5.1) ProcedureOnline Booking Legally required?Yes Timing of booking (5.2) Yearly contractsNo restriction 1) Monthly contractsNo restriction 1) Earliest 20 days 1) 2) / Resp. earliest 3 months 3) Daily contractsEarliest 3 months 1) Earliest 20 days 1) Inline with Dutch / German network code? Yes

Paris, 11 May IssueGTSBEBE.ON GT WINGAS TRANSPORT Can shippers book Entry and Exit capacities to each TSO separately? (5.3) Shippers book Entry and Exit capacities separately to each TSO Yes Are booking procedures coordinated between neighbouring TSO, so that shippers are in contact with only one party? (5.4) Shippers can book Entry and Exit capacities from only one TSO No Shippers can book Entry and Exit capacities via a third party (e.g. agent, train ticket) NoYes Status quo: Answers 5.3 and 5.4

Paris, 11 May IssueGTSBEBE.ON GT WINGAS TRANSPORT What is/are the applied capacity allocation mechanism(s) for existing capacities? (6.2.2) First-Come-First- Served… Yes 1) Legally required?Yes Is/Are allocation mechanism(s) applied for existing capacity coordinated between adjacent TSOs? (6.2.3) No Status quo: Answers 6.2 1) First committed first served is offered in combination with online booking

Paris, 11 May IssueGTSBEBE.ON GT WINGAS TRANSPORT Are there planned increases in capacities? Planned capacity increases (6.3.1) YesNoYesNo New capacity already allocated (6.3.2) Yes for the first years ---Yes--- Status quo: Answers 6.3

Paris, 11 May Status quo TSOs answers/proposals Contents

Paris, 11 May Implementation Goal 1: BNetzA / DTe Proposals Submit missing data on technical capacity, subscription, flows for (2004), 2005, 2006 Data ProvidedGTSBEBE.ON GT WINGAS TRANSPORT Capacities in 2005 (4.3)Yes 1) Yes Yes 1) Utilization rates in 2005 (6.1) Yes 1) Yes 2) Yes 3) Yes 1) Rates of subscription in 2007 (7.1) Yes 1) YesYes 4) Yes UIOLI (7.4.2)Yes Contractual congestion in 2005 and in 2006 (12.1) Yes 1) Yes 1)Except for confidential data in some months 2)Data only available from 10/2005 3)Percentages refer to net flow 4)Except for months Oct-Dec 2007 because of change of calculation model

Paris, 11 May Implementation Goal 1: BNetzA / DTe Proposals Explain low utilisation and temporal over-utilisation Interpretion of question was different between TSOs, e.g. some took net flow and some took contractual allocated flow High utilisation rates in BEB answer because of netting effects and usage of allocated capacities Wingas Transport utilisation rates are within range Low utilisation rates from E.ON GT grid to GTS grid because of lower GTS entry capacity compared to E.ON GT exit capacity Temporarily higher gas flows possible on operational level dependend on actual flow situation in the GTS grid

Paris, 11 May Implementation Goal 1: BNetzA / DTe Proposals Identify possible ways to maximise capacity UIOLI mechanisms are in place Further facilitation of secondary market via day ahead capacity platform under development Operators are open for discussion of new proposals

Paris, 11 May Implementation Goal 1: BNetzA / DTe Proposals Strictly enforce UIOLI Buy-back capacities Detailed legal requirements on long term UIOLI in Germany and in the Netherlands Such UIOLI mechanisms have been implemented in the respective network codes Buy-back mechanisms better to be solved via secondary capacity market

Paris, 11 May Implementation Goal 1: BNetzA / DTe Proposals Ensure that capacity trading platforms are running and interlinked Capacity trading platforms are running in the Netherlands and in Germany Relation to day ahead capacity pilot ?

Paris, 11 May Implementation Goal 2: BNetzA / DTe Proposals Comply with all transparency requirements TSOs would like to be informed about any perceived non-compliance with existing transparency obligations In case of non-compliance with existing transparency obligations, TSOs will endeavour to comply as soon as possible Additional transparency requirements should be discussed and if agreed upon aligned with other work streams, i.e. in the day ahead capacity pilot

Paris, 11 May Implementation Goal 3: BNetzA / DTe Proposals Planned capacity increase E.ON GT exit capacity increase to 1.5 Mio m³/h in 2007 GTS entry capacity increase by 3 Mio m³/h in 2010 CAM for new capacities The capacity allocation methods currently applied by TSOs are in line with the applicable national legal obligations Possible change requirements to be discussed

Paris, 11 May Implementation Goal 4: BNetzA / DTe Proposals Identify scope and limits for establishing a harmonised/bundled framework GTE is currently conducting a study on harmonisation of capacity products, input from regional market is welcome Bundled entry and exit capacities will be treated in day ahead capacity pilot

Paris, 11 May Implementation Goal 4: BNetzA / DTe Proposals Coordinate with the goal of facilitating booking procedures, especially with respect to spot markets Learn from coordinated day ahead capacity pilot ?