Z. Martí, U. Iriso Accelerator Division, CELLS May 2014 Beam Energy Measurements through Spin Depolarization at ALBA.

Slides:



Advertisements
Similar presentations
DEELS workshop, ESRF, 12.– 13. May 2014 Friederike Ewald Difficulties to measure the absolute electron beam energy using spin depolarisation at the ESRF.
Advertisements

Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
Development of a Chromaticity measurement application using Head-Tail phase shift technique.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
U. Iriso, A. Nosich, and L. Torino Accelerator Division, CELLS May 2014 Beam Size Measurements at ALBA.
Status of the LHC optics T. Persson on behalf of the OMC-team.
Elias Métral, 1st ICE meeting, 14/07/2010 /191 STATUS OF THE LHC INSTABILITIES E. Métral, N. Mounet and B. Salvant E. Métral, N. Mounet and B. Salvant.
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Witness Bunch Experimental Studies at CESR-TA Robert Holtzapple Alfred University/Cal Poly San Luis Obispo.
3 He Polarization Tests at UIUC Danielle Chandler David Howell UIUC.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
1 Muon acceleration - amplitude effects in non-scaling FFAG - Shinji Machida CCLRC/RAL/ASTeC 26 April, ffag/machida_ ppt.
Part III Commissioning. Proof of Principle FFAG (POP) study The world first proton FFAG –Commissioned in March –From 50 keV to 500 keV in 1ms. –Proof.
Plots from RCNP UCN Run (April 20-25, 2010). EDM Set-up Schematic H0H0 (RF) H 1 Spin Flipper RF Coil Spherical Coil Cell Valve EDM Cell Magnetized Foil.
RHIC pp 500 GeV development M. Bai C-A Department.
RREPS'11, Egham (UK) Status of Beam Loss Detector Tests and Developments at PETRA III & ESRF Gero Kube DESY (Hamburg) Introduction: PETRA III Extension.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Experience Laurent S. Nadolski Accelerator Physics Group On behalf of the Sources and Accelerator Division.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Simulation of Spin Interference and Echo Effect Abstract Successively jumping across a depolarization resonance twice produces interesting spin dynamics.
Isabell-A. Melzer-Pellmann LET Beam Dynamics Workshop, Lumi scans with wakefields in Merlin Lumi scans with wakefields in Merlin Isabell-A.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
What is the time estimated to change the energy and re-establish stable operation by steps of ~1% (threshold scan), a few%, or more than 10%? Comments.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
1 Error study of non-scaling FFAG 10 to 20 GeV muon ring Shinji Machida CCLRC/RAL/ASTeC 26 July, ffag/machida_ ppt.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
ApEx needs for CeC PoP Experiment December 11, 2015.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
U. Iriso ESLS XXIII Nov Commissioning of the Bunch By Bunch Feedback System U. Iriso, J. Moldes, A. Olmos (ALBA – CELLS) M. Abbot, G. Rehm (Diamond)
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Click to edit Master subtitle style 37th ICFA Advanced Beam Dynamics Workshop on Future Light Sources Status of Beam Loss Detector Tests and Developments.
SESAME TL2 and SR Diagnostics
Failure analysis at BEPCII
-9:00: Test IP transverse adjustment (CMS) and optics verification.
MD2036: UFO dynamics studies and UFO fast detection
Energy calibration issues for FCC-ee I. Koop, BINP, Novosibirsk
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Tuesday 22nd January - morning
Overview Multi Bunch Beam Dynamics at XFEL
Global aperture measurements at 450 GeV with 170 mrad crossing angle
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Commissioning Issues of BEPCII
RHIC Spin Flipper M. Bai, T. Roser Collider Accelerator Department
Thursday 30th September De-bunching test
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
31/3/2010 Difficult day… but at the end stable beams.
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Z. Martí, U. Iriso Accelerator Division, CELLS May 2014 Beam Energy Measurements through Spin Depolarization at ALBA

Introduction: the recipe Inject a fresh beam up to a beam current whose lifetime is limited by Touscheck Wait until beam gets polarized (anti-parallel to the dipole Bfield), noticeable because lifetime increases Scan a vertical excitation at a frequency around expected energy resonant tune. When the vertical excitation is in resonance with the spin tune, and beam gets depolarised When the beam is depolarised, the beam gets a sudden loss, producing:  lifetime drops  beam losses increase  Product (DCCT * lifetime) decays

Excitation Hardware Arbitrary Function Generator - AFG W Amplifiers Fast Feedback Kickers: Zsh = 45 kOhms Kick: 0.67urad (7 uT·m) ALBASoleilSLSDiamond 7uT m4.8uT m3.5uT m45uT m Kick numbers comparison with other labs (numbers for IPAC references)

Ubaldo Iriso Measurement Hardware Lifetime (or product) DCCT Lifetime (or product) using BPMs Sum signal 1 Scintillator based loss monitor (Beam Loss Detector – BLD) 120 PinDiodes Bergoz Beam Loss Monitors (BLM) Keees BLD BLD Location in the Ring: Downstream Hor and Ver Scraper Both are slightly closed to increase losses at this location

Ubaldo Iriso Results: Polarization First, polarization build up is confirmed. For this case, BPMs fans and gains shall be fixed.

Ubaldo Iriso Scaning the excitation frequency with steps up to 5Hz/s, no lifetime drop is observed. Instead some strange peaks appear in the lifetime. Suspected Qy-Qx, but moving the tunes the peaks do not move consistenty. First Results: frequency scans

Peaks study – changin WP

Full scan: [0 – 0.5] The result is that we are full of peaks!! Even if we change the WP, we still get peaks here and there Ver beam size evolution (blue) during the freq scan

Ubaldo Iriso Zoom on peaks Example: Feb 2014 Qscan=[0.168 – 0.28] Qspeed: 1.24e-5/sec (rate at which exc. Tune is changed) WP=(0.1486, ) ; Qs= e-3 2.2e-3 6e-4 So, we are a bit lost about the reason for these peaks. Suggestions are welcome Nevertheless, let’s try to see if we can see some lifetime drop between this forest of peaks

Moving frf by -2kHz ; E=2.994GeV Nominal RF frequency ; E=2.984GeV Two tests at different f rf There seems to be a valley in the lifetime product, which moves consistently with the f rf. But it is very difficult to distinguish it among the peaks, where the lifetime increases

Ubaldo Iriso Looking at DCCT and BLD DCCT Lifetime BLD counts Rather than a sudden drop, we are looking a slow decay

Energy Determination Raw Data BLD Evolution removing data when  y>1.10*  y According to these peaks in BLD, energy is /-5e4 GeV (only presentable in a DEELS workshop) Data manipulation based on the beam size evolution

Ubaldo Iriso Summary and Questions The energy scans at ALBA have been limited by the presence of non understandable resonances These resonances produce vertical beam size increase, which make the lifetime to increase To detect the resonances, best monitor is the beam size To detect losses, best monitor is the scintillator based BLD All in all, the drops in lifetime or sudden increases in BLD seems to indicate a beam energy of GeV Precision cannot be fully determined due to the presence of these peaks.