LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.

Slides:



Advertisements
Similar presentations
LAPD Run 2 Results and Notes Terry Tope
Advertisements

Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNF Test Cryostat Requirements David Montanari / Jack Fowler Jan 29, 2015 Rev. 11.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cryogenic discussion and update 30 October 2014Neutrino platform.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Comments about Extrapolation to LBN(E) Barry Norris September 25, 2014 Barry Norris, Cryogenic Meeting at CERN September 2014.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Observations on possible factors affecting LAr purity on the 50kton TPC from the viewpoint of the internal walls Alejandro S. Díaz Chemical Engineering.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Neutrino Cryogenics Requirements Meeting Overall Summary of Our Discussions Barry Norris (Fermilab) / Johan Bremer (CERN) Neutrino Short Baseline Meeting.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
LAr1-ND Cryostat proposal David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Single Phase Test at CERN Cryostat/Cryogenics Update
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
Questions and challenges of an underground multi-kton LAr TPC detector Outline Introductory Remarks Detector Optimization Vessel construction and integration.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
Concept Design for LBNF Far detector (LAr single phase)
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
35ton and LAPD cryostats and future DUNE detector development.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Second run with the Copper filter WA104 technical meeting – 23/03/2016.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
In-Vessel Electronics Infrastructure Craig Thorn LAr40 Cold Electronics Far Site Review, December 6-9, 2011.
Installation of the T600 at Fermilab Fermilab, February 15,
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Installation of the T600 at Fermilab
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
Proximity Cryogenics P&IDs meeting
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Warm structure requirements :
CRYOGENICS OPERATIONS 2008 Organized by CERN
Test box for ProtoDUNE SP – Integration Test
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Presentation transcript:

LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014

Outline Introduction Requirements Location Cryostat Cryogenic system Open issues Q&A Summary 2 LAr1-ND Meeting – Feb 16, 2014 – CERN

Introduction The design of LAr1-ND builds on many years of LAr TPC detector R&D and experience from design and construction of ICARUS T600, ArgoNeut, MicroBooNE and LBNE 35 ton. Membrane cryostat technology with passive insulation (Polyurethane foam). See previous talk for details. Where: Fermilab Location: SciBooNE enclosure, on-axis at 100m from the Booster Neutrino Beam target. 3 LAr1-ND Meeting – Feb 16, 2014 – CERN

Requirements Purity: 10 ms electron lifetime (< 30 ppt O2 equivalent contamination). High reliability of the LN2 cooling system (value??). Avoid, if possible, purification of the bulk of the liquid. See purity requirement. 4 LAr1-ND Meeting – Feb 16, 2014 – CERN

Cryostat LAr1-ND Meeting – Feb 16, 2014 – CERN 5

Current Design Parameters 6 ParameterValue Type of structureMembrane cryostat inside an existing concrete pit (already capable of withstanding the hydrostatic pressure) Cryostat Volume108 m^3 Liquid Argon total mass150 ton Inner dimensions of cryostat4.4 m (L) x 5.1 m (W) x 4.8 m (H) Depth of liquid argon4.8m (no ullage, but expansion tank on the top) Insulation0.25 m (bottom), 0.40 m (top) 0.45 m (beam left/right), 0.20 m (beam upstream/downstream) Primary membrane1.2 mm SS 304L (if GTT) or 2.0 mm SS 304 (if IHI) Outside reinforcementExisting concrete pit Operating gas pressure1.0 psig (~70 mbar) VacuumNo vacuum Design pressure3.0 psig (~207 mbar) Heal Leak (reduced by LN2 cooling plates attached to the membrane). ~2.5 kW (Cryostat) + ~0.5 (Electronics) + ~0.5 (feedthrus) Total: ~3.6 kW Duration10 years Thermal cycles10 complete cycles (cool down and total warm up) LAr1-ND Meeting – Feb 16, 2014 – CERN

Location: SciBooNE detector hall 7 LAr1-ND Meeting – Feb 16, 2014 – CERN Beam 8,534 mm 3,048 mm 4,900 mm

Side Views 8 LAr1-ND Meeting – Feb 16, 2014 – CERN Beam 2,130 mm 4,800 mm Insulation 250 mm Expansion Tank Insulation 250 mm Expansion Tank Installation Hatch HV Feedthrough Signal Feedthrough Insulation 400 mm Insulation 200 mm Insulation 450 mm

Top view 9 Insulation 450 mm 4,900 mm4,400 mm 5,100 mm 1,000 mm Insulation 200 mm LAr1-ND Meeting – Feb 16, 2014 – CERN

Cryogenic System LAr1-ND Meeting – Feb 16, 2014 – CERN 10

Cryogenic System – 1 If possible, the goal is to not purify the bulk of the liquid during regular operations, but only the boil off gas. The idea is to fill the membrane cryostat completely and reach the expansion tank with the liquid to minimize the outgassing to that region only. (No outgassing in the liquid). To purify the LAr during the initial filling via molecular sieve and copper beds to remove respectively water and oxygen. To purify and recondense (or vice versa) the boil off gas from the expansion tank using molecular sieve and copper beds: It may be necessary to suck the boil off gas in order to overcome the outgassing flow rate in the expansion tank. It may be possible to use the same purification system used during the LAr filling. To purify the bulk of the LAr, if needed. LAr pumps (where??). To handle the LAr/GAr and LN2/GN2 flows: Cleaning  GAr purging and venting, GAr recirculation and purification. Ops  cool down, LAr filling, GAr boil off purification and re-condensation, LAr return to the tank. 11 LAr1-ND Meeting – Feb 16, 2014 – CERN

Cryogenic System – 2 To recondense the boil off gas: LAr condenser and LN2 phase separator. Pressure control: PSV, VSV, Auto/Manual venting. To handle the LN2/GN2 flow to/from the heat exchanger panels inside the membrane cryostat. To handle the GAr purge inside the insulation. Instrumentation and diagnostics: T and P sensors, flow meters, etc., Analytical instruments to measure the contamination, in-line Purity Monitors?, etc. To develop the control system. 12 LAr1-ND Meeting – Feb 16, 2014 – CERN

Open issues – 1 Expansion tank: Is it technically possible to design a zero-ullage tank with all the gas in n expansion tank? Is feasible to reduce the contamination in the bulk of the liquid by raising the level of the liquid to the expansion tank? Should it be designed like an extension of the membrane cryostat rather than a stand-alone tank connected to the membrane cryostat? Like 35 ton chimney but taller to allow ~5% of gas region. 13 LAr1-ND Meeting – Feb 16, 2014 – CERN

Warm FT al la MicroBooNE Liquid Level Liquid Argon – TPC In Here Insulation Cables and services – routed via a small opening in the membrane LAr1-ND Meeting – Feb 16, 2014 – CERN Integrated expansion volume Open issues – 1 14

Open issues – 2 Cold Feedthrough: Are they really necessary? Is it the right technical choice? 15 LAr1-ND Meeting – Feb 16, 2014 – CERN

Open issues – 3 Purification/Filtration system(s): How many are needed? Gas recirculation: GAr purification during initial cleaning. Filling: LAr purification. Ops: GAr boil off purification and no LAr purification (idea). Liquid phase: condense and then purify before sending back to the tank? Gas phase: purify and then condense before sending back to the tank? Is it feasible to purify the LAr at the beginning during the filling and no more, just the boil off GAr? What is the outgassing rate from the “warm”/gas region? Does it match the boil off rate or do we have to pull GAr to overcome the outgassing? If so, how? Pump? Will the bulk of the liquid be pure enough if it is not continuously purified? Or will it need to be purified as well? What kind of LAr/GAr purification system? Mol sieve + Copper beds Are there more types of mol sieves? 16 LAr1-ND Meeting – Feb 16, 2014 – CERN

Open issues – 4 LAr pumps: Ideal: outside. With membrane cryostats it is not possible: all penetrations are on top of the tank. Submerged in LAr. How do we protect against failures? Submerged with retraction system and foot valve: Can be pulled out for maintenance and reinstated inside without emptying the tank nor contaminating the liquid. The foot valve closes before the extraction isolating the pump tower from the tank. Standard commercial solution for LNG tanks. If continuous LAr filtration is needed, this solution requires an additional pump for the downtime of maintenance of the first pump. More expensive. Current choice for LBNE-FD. Alternatives? 17 LAr1-ND Meeting – Feb 16, 2014 – CERN

Open issues – 4 18 LAr1-ND Meeting – Feb 16, 2014 – CERN

Open issues – 5 Installation of TPCs: How will the TPCs be installed? Do the cryostat dimensions need to be revised to account for the installation of the TPCs? Does the location of the openings (feedthroughs and installation hatch) need to be modified? 19 LAr1-ND Meeting – Feb 16, 2014 – CERN

Q&A – 1 1) Heating power that has to be adsorbed (including feedthroughs, etc.)? Feedthroughs and digital electronics  0.6 kW. (BY/CT). Membrane cryostat  ~2.5 kW. (BY/CT). Assuming for feedthroughs and plumbing: 0.5 kW (assumption BY/CT). Total: ~3.6 kW. 2) At which temperature will the "warm" gas arrive in the cooling system and at which temperature shall the "liquefied" gas leave the cooling system? Gas will be at ~100 K. (BY/CT). Return liquid at ~89K. (BY/CT). 3) Shall a purification system be foreseen for the installation: purification in gaseous phase (=warm), or purification in liquid phase (cold)? See Open Issue n LAr1-ND Meeting – Feb 16, 2014 – CERN

Q&A – 2 4)Since the re-condensation probably has to happen outside the cryostat: would a liquid argon circulator be acceptable to circulate the argon in liquid phase through a purifier? We propose to use heat-exchange panels in the cryostat, on the surfaces, cooled with pressurized LN2, to remove the bulk of the heat; the remainder will evaporate sufficient liquid to ensure adequate purification of the gas to maintain the required purity. (BY/CT). After an initial gas cool down to ~90K, liquid would be introduced through the purifier and recirculated through the purifier until the cryostat is filled. (BY/CT). There should be condensation of the boil off gas in a condenser outside the cryostat. (DM). 5)How shall the re-condensed liquid be returned to the cryostat (eventual movements in the argon bath)? It can be returned to the bulk of the cryostat few inch from the floor via vacuum insulated pipe. (DM). 6)What will be the estimated running time of the experiment (in years)? At least 1 is contemplated to overlap the MicroBooNE program, and hopefully 2-3 if construction is completed well before the end of MicroBooNE operations, but probably 10 if LAr1-FD or equivalent is constructed. (BY/CT). For design purpose 10 years suggested. The membrane manufacturer needs this information. (DM). 21 LAr1-ND Meeting – Feb 16, 2014 – CERN

Q&A – 3 7)What are the limits for the cool down and the warm-up of the system to be cooled? The cool down rate should be slow enough to ensure <20K difference between the TPC sense wires and APA frame. The warm up rate is much less restricted. (BY/CT). The manufacturer of the membrane cryostat has lower limits on the cool down: IHI’s max cool down rate for the membrane is 20K/hr (same). (DM). Suggested 15K/hr between room and 190K and 10K/hr from 190K to LAr temperature. (DM). 8)Q: How often shall a cool-down / warm-up of the system be foreseen: Once or twice in the presently conceived operating plan; more if other plans for the system are developed. (BY/CT). There are at present no plans to store the LAr, although if several cycles of filling are contemplated, a storage vessel might be economic. (BY/CT). A LAr pump is incorporated in the cryogenic system to empty the vessel. There is the desire to put the LAr pump outside, but that will not be possible, as no side penetrations are allowed through the membrane. The LAr pump will have to be submerged. (DM). 9)Will the system be installed in an area where there could be an oxygen shortage problem for personnel? Yes, probably ODH 0 (free access) or ODH 1 (restricted access, but no protective equipment). (BY/CT). 22 LAr1-ND Meeting – Feb 16, 2014 – CERN

Q&A – 4 10)What should be the level of reliability of the cryogenic system (defines the eventual back-up systems)? The LN2 cooling system should be very reliable to avoid loss of Ar. The purification system is less constrained. (BY/CT). 23 LAr1-ND Meeting – Feb 16, 2014 – CERN

Potential synergies 24 Fermilab has technical and business expertise in Membrane Cryostat technology (35 ton prototype). Fermilab and CERN have technical expertise in Cryogenic Systems. Engineering, Construction, Commissioning of Cryogenic System Sharing expertise and collaborate on Cryogenics for LAr experiments (LAr-1-ND, LBNE-FD, WA-104, WA-105, etc.) LAr1-ND Meeting – Feb 16, 2014 – CERN

Summary 25 LAr1-ND proposes to use the membrane cryostat technology for a new on- axis Near Detector using the R&D and experience from the design and construction of similar LAr-TPC detectors. It presents several innovative aspects: – The absence of the ullage and the use of an expansion tank on top. – The use of cold feedthroughs. – The idea of purifying only the boil off GAr form the expansion tank during operations and not the bulk of the liquid. – The use of LN2 cooled heat exchange panels inside the tank to cool-down the LAr trying to minimize boil-off. Fermilab and CERN have great expertise in cryogenic systems. It would be very valuable to share expertise and collaborate on the development, design and construction of cryogenic systems for liquid Argon detectors, starting from LAr1-ND where CERN could provide a significant contribution. LAr1-ND Meeting – Feb 16, 2014 – CERN

Thanks LAr1-ND Meeting – Feb 16, 2014 – CERN