Pioneer Renewable Energy Project Overview June 2009.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Aspen Power, LLC Danny Vines, President October 7, 2010.
Combining Electric Power Generation and Water Quality Enhancement to Grow the Southwest Missouri Economy Agriculture as a Producer and Consumer of Energy.
ENVALOR LIMITADE Project: Ethanol / Electricity Co-generation Plant Mozambique, Manica Province November 5, 2009.
G LASGOW R EGIONAL L ANDFILL M ETHANE R ECOVERY TO E LECTRIFICATION P ROJECT GOVERNOR’S ENERGY CONFERENCE By Mayor Rhonda Riherd Trautman.
1 Northwest Florida Renewable Energy Center (NWFREC) Port St. Joe, Florida A presentation for The Coastal Community Association by Peter Chanin, Biomass.
VT Department of Forests, Parks & Recreation Wood Energy in Vermont January 2005 VT Department of Forests, Parks & Recreation.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
Northern Wood Power Boiler Re-Powering: Coal to Biomass William Smagula Director of Generation EBC- NH Chapter Meeting June 19, 2007 A Positive Step Toward.
South Boston Energy Project South Boston, VA
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
Marketing of MicroCHP MicroCHeaP meeting Copenhagen 29 September 2005.
Steven Jay Mueller, President International WoodFuels
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Potential Impacts of an Advanced Energy Portfolio Standard in Pennsylvania Ryan Pletka, P.E. Black & Veatch April 12, 2004 Supported by: Heinz Endowments.
Combined Heat and Power in the Ethanol Industry Tom Kerr Energy Supply and Industry Branch U.S. Environmental Protection Agency Governors’ Ethanol Coalition.
GREEN BUILDING.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
BIOMASS Leann Baer Brooke Edwards Nisarg Joshi Josh Olzinski.
Biomass to Energy Projects in Indonesia CDM & Sustainable Development January 25 –26, 2006 Shangri-la Hotel, Jakarta -Indonesia Iwan Sutanto, PT. LUNTO.
Engineering Technology Division
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Fremont County – Green Spring 2012 Research Team: Jacob Tolman, Justin Andersen, Thresia Mouritsen, Joseph Huckbody, John Beck Feasibility Study.
Small Farm Profitability: Is Wind Energy the Answer? 1
Fourth Meeting June 26, 2012 "The Cleaner Greener Lincoln initiative will make the City of Lincoln an active leader in the area of sustainability, building.
Current Integrated Use of Biomass from Forest Treatment Plummer Forest Products.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
A+ for Energy ® Energy Educator Training Conferences Sponsored by BP, Presented in Partnership with The NEED Project and NREL Texas Energy Story.
Western NC Wind Capacity ASU Energy Center after all exclusion zones: 3,150 MW in west (8% of NC electricity from 2100 turbines) ASU Energy center identified.
Air Emission Benefits of CHP Air Innovations Conference August 10, 2004 Joel Bluestein Energy and Environmental Analysis, Inc. Prepared under contract.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
1 Transport Coal or Transmit Electricity? Comparative Hybrid LCA Joule Bergerson, Lester Lave, Chris Hendrickson, Scott Matthews, Alex Farrell Carnegie.
Laura Wood. Definition Biomass is all plant and animal matter on the Earth's surface. Harvesting biomass such as crops, trees or dung and using it to.
Capital District Regional GHG Inventory CDTC Planning Committee Meeting 10/1/2014 GHG emissions (MTCDE)
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
CLEANER ENERGY for a Greener future CLEANER ENERGY for a Greener future Laidlaw Energy Group, Inc. 90 John St 4 th Fl New York, NY
No energy wasted Example of an energy strategy in urban areas Brussels, 22nd June 2006.
Creating A Greener Energy Future For the Commonwealth Renewable Energy in Massachusetts Dwayne Breger Division Director Renewable Energy Development The.
Demonstrating Sustainable Energy Technologies Michael J. Kelleher Executive Director Energy and Sustainability SUNY College Of Environmental Science and.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
Investing in America’s Electric Future Morry Markowitz Group Director, External Affairs New Mexico Utility Shareholders Alliance October 7, 2009.
Introducing the Atlantic City Alternative Energy Authority ACAEA A Municipal Utilities Authority Pursuant to NJSA 40:62-12.
Potential for Biomass Energy Development in South Carolina Tim Adams Resource Development Director South Carolina Forestry Commission.
February 28, 2015 Generating Electricity from Sustainably Harvested Biomass Material NYS Science Teachers and Master Teachers.
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
Exploring Solutions Activity 2: Clearing the Air.
Discussion Forum 2004 APPA National Conference June 19 – 23, 2004 Seattle, Washington Issues for Green Power Programs Designing Marketing and Pricing.
Vienna's Sustainable Energy Policy Climate Protection and Energy Efficiency Climate Protection and Energy Efficiency Dipl.-Ing. Dr. Edgar Hauer City of.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
By Kai Evans and Andrew Duran
Biomass Cogeneration Facility Savannah River Site Aiken, SC
In 2014, the average levelized price of signed wind power purchase agreements was about 2.35 cents per kilowatt-hour. This price is cost competitive with.
Presented to: Wisconsin Industrial Energy Group Board of Directors May 8, 2008 Alliant Energy Generation Update.
The Case for IGCC Kay Pashos President, Duke Energy Indiana MARC 2006 Annual Meeting June 20, 2006.
Chapter 4 An Enduring Energy Future. Cont. キ Central electric generating stations will continue to be part of the electricity supply system in order.
Plainfield Renewable Energy
Irvine Ranch Water District Distributed Energy Storage Case Study
First in Service First in Value
FUEL CELLS.
Division of Energy Resources
Energy Conservation CERD /12/2017
About Dominion: One of America’s Leading Energy Companies
Chesterfield Neighborhood Coal Ash Update January 9th, 2019
Senator Dance Town Hall Coal Ash Update December 5, 2018
Anna Garcia Air Innovations Conference August 2004
Wholesale Electricity Costs
Presentation transcript:

Pioneer Renewable Energy Project Overview June 2009

Project Overview Madera Energy, Inc. is developing a biomass power plant, called Pioneer Renewable Energy (PRE). PRE will be located on ~65 acres in Greenfield, MA. Capacity of the project is 47 megawatt (“MW”), which will generate nearly 400,000 MWh of renewable electricity per year for sale into the wholesale market. This is equivalent of powering more than 45,000 homes (or >150% of the households in Franklin County). Project cost is expected to total approximately $250M. It is expected that development will take ~18-24 months and construction will take ~30-36 months. The project will result in hundreds of jobs for Greenfield and the surrounding community, as well as millions of dollars in additional economic activity.

What is Biomass Power Biomass power is the conversion of organic material (trees, plants, or other sources) into electricity. Biomass is a renewable source of energy. In utility- scale applications, the electricity is sold to the wholesale market (also known as the “grid”). Biomass power is CO 2 neutral (or a “low carbon alternative”) and therefore an important tool in combating climate change. Biomass Material Wood Chips Power Plant Transmission Lines (“the grid”) Consumers

Why Greenfield The Greenfield site is located close to major roads, would have little to no impact on residential areas, has sufficient water and other utilities, has three transmission lines that pass through the site, is located in an excellent wood resource area, and has sufficient land.

Why Biomass High Energy Prices (and Rising) Economic Development Climate Change Concerns Energy Security Environmental Stewardship Resource Availability

Why Biomass – Economic Development According to a study conducted by UMASS Amherst, the MA DOER, and the MA DCR, the development of biomass energy “holds substantial economic promise”. Study shows that 165 MW of new biomass results in thousands of jobs and billions of dollars in economic output. Source: Massachusetts Sustainable Forest Bioenergy Initiative Economic Impact of 165 MW of New Biomass Power Generation by 2015 On-Going Annual Impact Western Massachusetts OnlyStateTotal Economic Output$57 million$22 million$79 million Jobs Construction Related Impact (Total for 5 Years) Western Massachusetts OnlyStateTotal Economic Output$1.07 billion$280 million$1.35 billion Jobs9,4901,73011,220

Why Biomass – Economic Development A 47 MW facility would make a significantly positive impact on the local economy.  permanent, direct employment opportunities  project-related jobs for local businesses, including foresters, loggers and truckers  construction jobs over the month construction period  ~$250M facility would significantly add to the local tax base  Additional revenue to the DPW (new water and sewer fees)  Create market for low-grade wood Create demand for ~500,000 tons of clean wood fuel annually  Support potential renewable energy “cluster”  Act as a “magnet” for additional industrial development  Provide region with reliable, economical, and sustainable energy

Project Overview  47 MW power generating facility (net) Generate nearly 400,000 MWh of power Enough to power the equivalent of ~45,000 homes - equivalent to powering >150% of the households in Franklin County  Low emission advanced biomass conversion technology Qualifies as renewable energy under federal and state requirements  Fuel consists of ~500,000 tons per year of clean wood NO painted or treated wood – permits/economics don’t allow it  Truck Traffic – Draft of traffic study complete Average of ~60 truck loads per day (120 truck trips) Significant truck traffic already travels thru Adams Rd/Route 2 intersection  Total project cost -~$250,000,000  Stack height of 250’(not highest structure on property)

Where the Fuel (Clean Wood) Comes From Massachusetts is the 8 th most forested state in the country, with forest-lands constituting more than 3 million acres (or >62% of the land).  Commercial Forest Operations Clean, low-grade material from commercial operations – normally remains in the forest  Timber Stand Improvements Clean, low-grade material from conservation lands managed for environmental or wildlife purposes and “cleaning cuts” on commercial forest lands.  Clean Wood Waste Clean wood waste from real estate development (land conversion), ice storms, transmission lines, municipal trimmings, etc. NO PAINTED OR TREATED MATERIAL.  Secondary Wood Manufactures Clean wood waste from sawmills, pallet recyclers, etc.

Sustainable Fuel Supply The area surrounding the proposed site has a rich supply of wood. A study performed INRS estimated that new growth of biomass exceeds harvest and mortality by >3M tons per year. Source: INRS 55-mile Radius of Greenfield, MA, with 90-minute drive time indicated in blue Greenfield, MA

Sustainable Fuel Supply There is very little current demand for low grade wood within a 55 mile radius of Greenfield, which makes the site a very attractive location for a biomass facility. Source: INRS Greenfield, MA

Project Overview – Technology Pioneer Renewable Energy will utilize advanced biomass conversion technologies, including state of the art emission control systems and an advanced stoker boiler.

Project Overview – Air Quality Pioneer Renewable Energy has performed an air modeling analysis and results show that air quality, with or without the project, will remain essentially unchanged.

Project Overview – Air Quality Pioneer Renewable Energy has performed an air modeling analysis and results show that any impacts of emissions from the stack will be below Significant Impact Levels (SILs). SILs are the EPA- defined levels under which impacts are considered insignificant. The SIL is 2 micrograms per cubic meter of air, or ug/M3 for PM 2.5.

Air Quality - Comparison to Wood Stoves Particulate emissions from PRE will be nearly 150 times lower than a typical residential wood stove.

Air Quality - Biomass vs. Coal PollutantMt. Tom Pioneer Renewable Energy lbs/MWh SO2 (pre Mt. Tom upgrade)90.33 SO2 (post Mt. Tom upgrade)30.33 NOx PM VOC CO CO Totals Total emissions minus CO2 (post - Mt. Tom upgrade) Total emissions minus CO2 (pre - Mt. Tom upgrade) Mount Tom has historically had emissions more than 5 times higher than those proposed by Pioneer Renewable Energy. After upgrades currently underway, Mount Tom will continue to have emissions nearly 3 times higher than Pioneer. Sources: Mt. Tom emissions based on discussions with plant manager, recent regulatory approvals, and standard EPA factors. PRE emissions based on proposed permit limits.

Project Overview – Traffic A detailed traffic impact analysis conducted for the project concluded that project-generated traffic will utilize well-established truck routes and will not negatively impact area roadways and intersections.

Project Overview – Water & Utility Information  Water Wet cooling would require estimated ~700,000 gpd % for cooling, % for boiler/potable Source of cooling water will be grey water from treatment plant – located 5.1 miles away – will access via Town roads ~49,000 gpd of water needed for boiler make-up will come from an on-site well  Sewer - Water discharged into sewer system  Will provide additional ~$250,000 per year in water/sewer fees to the DPW  Will use diesel for start-up  On-site ammonia tank (for emission control)

Project Overview – Wood Ash About 2% of the wood will end up as ash. The ash can be used as an organic fertilizer and is very well suited for Pioneer Valley soils.  Will likely use a firm by the name of Resource Management, Inc.  Certified organic  Clean wood ash is cost effective and well-suited to the soils of the Pioneer Valley  High in potassium and lime  Also acts as another safeguard against using painted and treated wood as every load of ash will be tested

Project Overview – Thermal Energy PRE has incorporated the ability to generate thermal energy into the design of the facility. The type of thermal energy will depend on the needs of potential customers.  Thermal energy could constitute hot water and/or steam  Would increase the efficiency of the facility, therefore further increasing the facility’s environmental benefits and economic viability  Provide low cost heating and/or cooling to businesses in the industrial park and surrounding community Madera Energy has reached out to a number of organizations to inquire about complementary uses  Examples of businesses that can make use of thermal energy: Steam – Biotech, manufacturing, food processing Hot Water – Greenhouses, residential, office buildings, aquaculture, algae farms, District Heating

Operating Example – McNeil Generating Station McNeil Generating Station, located in Burlington, VT, is a 50 MW facility that has been in operating since John Irving helped construct the facility and has been managing its daily operations since 1985.

Burlington, VT – Accolades and Awards As Burlington, VT demonstrates, the existence of a biomass plant and a vibrant, clean, and sustainable city are not mutually exclusive.  CDC (2008) - Healthiest City  Country Home Magazine (2008) – Greenest City  Urban Environment Report (2007) - Ranked 2nd out of 72 cities (50 largest cities in the country plus largest cities in each state) nationwide  Money Magazine (2007) - "Greenest City" in the country (based on air and watershed quality, mass transit use, power use, and number of organic producers and farmers' markets)  Self Magazine (2004) - No.2 Happiest and No.4 Healthiest Place to Live in the U.S.  Delicious Living Magazine (2004) - Impressive City Award (for exceptional efforts toward sustainable living).

McNeil Generating Station – Economic Benefits Through February 2006, the McNeil Station has had a significantly positive impact on the local economy. Note that the below does not include the costs associated with construction of the $67M facility, much of which was spent locally.  Payroll$ 40,648,315  Property Taxes$ 19,896,343  Sales Taxes$ 894,972  Rail Transportation$ 24,420,031  Local Contractors$ 5,778,494  Wood Fuel Purchases$ 103,090,045 Total$ 194,728,200

McNeil Generating Station – Jobs The McNeil Station supports more than 100 LOCAL jobs.  Power Plant Jobs34  Home Office Support Jobs 4  Forest Management Jobs4  Harvesting and Processing 36  Wood Transportation35  Support Services11  Train Transportation6 Total130

Est. Timeline for Pioneer Renewable Energy Site control, title search, Phase I, initial community outreach, preliminary resource assessment Initial Due Diligence & Site Control – Complete by Fall 2008 Detailed resource assessment, community outreach, local and state permitting, design, power contracts, REC contracts, EPC and O&M agreements Project Development – Complete by Fall 2010 (~ months) Detailed Design & Construction – Complete by Summer 2013 (~30 months) Will take at least 24 months but more likely months Completed as part of the final stages of design and construction Startup & Operation – Summer 2013

Contact Information: Matthew Wolfe Principal, Madera Energy, Inc. 89 Thorndike St. Cambridge, MA (fax)