Internals.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Regulations (Standards - 29 CFR) Flammable and Combustible liquids
ACTIVE LEARNING PROCESS
East Carolina University Compressed Gas Safety Training Program
Refrigerators.
Installation Procedures
Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
Installation. Indoor Unit Installation Typical Installation.
Copyright  Progressive Business Publications Blue Ridge Safety Association Safety Presentations Compressed Gasses.
ATLIER FRANCOIS (COMPRESSOR). MAINTENANCE AND CHECKS DAILY CHECKS DAILY CHECKS INSPECT AND NOTE THE OIL LEVEL AND ALL THE PRESSURE AND TEMPERATURE LEVELS(FILLL.
Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
1926 Subpart J Establishes the requirements for welding and cutting in the construction industry Establishes requirements for equipment, fire protection,
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Container Stuffing and Stripping
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
Tire Servicing Program. Agenda WorkSafeBC Requirements Definitions Responsibilities General safety.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
Concrete Pre Cast Panel By Peter Spence ID:
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 4 General Safety Practices.
Filling, purging and air removal
Multistage Distillation
Standard 29 CFR Part Welding, Cutting and Brazing Training.
Climbing the Ladder to Safety
LADDER SAFETY.
Gas Transmission Pipelines
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
Installation. Indoor Unit Installation Typical Installation.
STEAM CONDENSERS.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Patrick Thornton, SNS/FPE June 9, 2008
INTRODUCTION Definition:
NFPA 31 Standard for the installation of Oil- Burning Equipment
Installation. Indoor Unit Installation Typical Installation.
DRYING Dr. Basavaraj K. Nanjwade M. Pharm., Ph. D
Air Conditioning International Mechanical Code
Georgia Tech Safety and Health Consultation Program
FIRE PREVENTION. Fire Of the many hazards on site or at work, fires are the worst kind. They do a great deal of damage every year.  All fires, however.
- Overview about Malaysia oil and gas - level of realism to traditional drawing (2D dwg) - Be able to store huge amount of data referring. - Single source.
Unit 4: General Safety Practices
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
CHEMICAL HANDLING Standard Operating Procedures and Personal Protective Equipment For REACT-OX® Program Applications.
Manual Density Business Today
Fabrication of Fishtank Reservoir ENGR 121 living with the lab.
Welding, Cutting, and Brazing
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
1 Product Presentation January Normal BinROXELL Bin Old feed Normal bin: ‘centerflow’ feed flows first in center  bridging ‘mass flow’ feed.
Refrigeration Systems
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
Flammable Liquids Directorate of Training and Education
UNIT-5. ELECTRICAL SAFETY, WIRING & INTRODUCTION TO POWER SYSTEM
Chapter No-5 STEAM CONDENSERS AND COOLING TOWERS Marks-16
GOVERNMENT ENGINEERING COLLEGE, BHAVNAGAR TOPIC : INTRODUCTION TO PRESSURE VESSELS Prepared By :- 1.Aal Akash Ansari Aarif.
INTRODUCTION TO PRESSURE VESSELS
Flammable and Combustible Liquids
Personal Protective Equipment
East Carolina University Compressed Gas Safety Training Program
STEAM CONDENSERS AND COOLING TOWERS Marks-16
TRENTON Casing Filler Presentation
1 INTERNATIONAL MARITIME COLLEGE OMAN PROCESS TECHNOLOGY & SYSTEMS (TPTS & PT-TPTS) PE (TPTS & PT-TPTS) (Chapter-3) Chapter - 3 Distillation Systems Textbook.
Parker domnick hunter. Safety of Electrical and
Pneumatic System Conditioning
Presentation transcript:

internals

scope

Definition Internals : Any part used to achieve the most efficient separation of liquid and gas mixture in side the column either in separation process or in organizing it. -Columns include two major categories, trays and packing. - the following columns: Distillation Absorption Stripping Extraction

Type of internals Trays Packing Packing additions collectors

Trays Trays force the liquid to flow back and forth horizontally while the vapor bubbles up through holes in the trays. The purpose of trays is to increase the amount of contact area between the liquid and vapor phases.

Type of trays Bubble cap tray Sieve tray Valve tray

Bubble cap Bubble-cap trays are one of the types of physical devices which are used to provide good contact between the up flowing vapor and the down flowing liquid inside a separation column. A bubble cap tray has a riser or chimney fitted over each hole, and a cap that covers the riser.

Bubble cap

Sieve tray Sieve trays are simple metal plates with holes in them. Vapor passes straight upward through the liquid on the plate.

Valve tray In moving valve trays, holes are covered by lift able caps. Vapor flows lift the caps, thus self-creating a flow area for the passage of vapor.

Tray Configuration Vapor flows up the column and is forced to pass through the liquid, via the openings on each tray. The area allowed for the passage of vapor on each tray is called the active area.

Mechanics of Trays A weir on the tray ensures that there is always some liquid (holdup) on the tray and is designed such that the holdup is at a suitable height, e.g. such that the bubble caps are covered by liquid.

Types of Down comer Types of Down comer based on the shape Types of Down comer based on the number

packing Packing are passive devices that are designed to increase the interfacial area for vapor-liquid contact, without causing excessive pressure drop across a packed section . Liquids tend to wet the surface of the packing and the vapors pass across this wet surface, where mass transfer takes place. Liquid Vapor

Types of packing Random packing Structural packing

Packing versus Trays A tray column that is facing throughput problems may be de-bottlenecked by replacing a section of trays with packing. This is because: packing provide extra inter-facial area for liquid- vapor contact efficiency of separation is increased for the same column height packed columns are shorter than trayed columns

Packing additions Liquid Distributor Bed limiter Support plate

Liquid Distributor - If the liquid and vapor are not evenly distributed across the superficial tower area as it enters the packed bed, the liquid to vapor ratio will not be correct in the packed bed and the required separation will not be achieved. The packing will appear not to be working properly.

Type of liquid distributor Orifice Type Spray Nozzle Trough Type Pipe Ladder

Bed Limiter A bed-limiter is positioned inside the tower, directly above a randomly packed bed to confine any upward movement of packing. - Grating type For large packing, the bed limiter, in its simplest form, consists of a grid of flat bars welded to a ring - Grating with Mesh type For small packing, the bed limiter consists of grating and mesh.

Support Plate A randomly packed bed is held on a packing support plate, whose essential attributes are to have a high percentage of open area so as not to inhibit the capacity of the tower and to allow the unrestricted counter-current flow of both liquid and vapor through it. This is achieved by providing separate passageways for the gas and the liquid.

Collector Liquid collector's main functions are liquid collection and gas redistribution. Chimney trays must be installed to function as a collector device either for feeding to a liquid distributor or for a liquid draw off. When installed below the bottom packed bed, chimney trays perform a useful function as a vapor distributor. This is especially important where high vapor rates are encountered due to the low pressure drop across most packed beds. Chevron Vane Chimney type

SAFETY All the safety guidelines for the confined space entry will be followed. In general workers shall enter the tower only verifying the proper oxygen level and confirming non-existence of any toxic gas and flammable gases and completing a confined space entry permit. For better ventilation in the tower, all manholes at the bottom and top shall be fully opened. Additional ventilation shall be provided if internal welding is required. Person in- charge for tray work is required to have awareness of safety regulation.  The temperature inside of vessels shall not be beyond 500C during installation or Inspection. Shift safety officer and supervisor should check the working condition i.e., obstruction, scaffolding (if required), proper tools & tackles, PPE etc., prior to commence any activity.

TOOLS AND EQUIPMENTS In general all tools and equipments should be in good working order in compliance with all safety requirements and testing requirements.   Calibration for all special tools and instruments shall be ensured as per specification procedure prior to start any activity. All fasteners should be kept in canvas bucket or small boxes. The Torque value for the bolts tighten should be according to the vendor recommendation.

MATERIAL STORAGE & HANDLING Material receiving, handling, storage, preservation and issuance of material should be as per applicable procedures. Extra care shall be taken to prevent damage and corrosion during installation All Wooden boxes that contains column internals materials shall be shifted to predetermined location in order to segregate the internal as per the installation sequences. The boxes top cover shall be opened carefully and ensured no damage on internal material during removing the top cover and the tray material shall be taken out carefully. Tray parts and hardware shall be stored in such a way that no damage or loss to occurs. Small items i.e. bolts nuts and washers should be secured properly until ready for Installation.

SEGREGATION & TRAIL ASSEMBLY Once the boxes are opened and ensured that all the material there in good condition and the quantity are correct against packing list. The segregation of the tray shall start with seal pan tray which is coming just below the tray number 1. Prior to installation, the entire tray shall be pre-assembled on the ground to familiarize workmen with the general layouts of the trays.  All the dimensions that are required to meet the vessel check and the material receiving shall be carried out with the respect to the vendor drawing and the specific hardware location to be witnessed by QC and must be documented. Each piece of tray which is marked will be arranged as per sequences.

GENERAL PRECAUTIONS AND INSTRUCTION When any person enters the tower inside, he shall remove dust completely from his shoes, to keep a clean environment. No food drinks and smoking allowed within the vessel. All manholes should be open for ventilation at the time installation. The lifting of parts into the tray should be carefully performed so that the parts or the containers do not fall or get damaged. All bolts, nuts and washer at every tray should be checked for correct length, type and sizes.

1 BED : 1 point 2 BED : 4 point 3 BED :2 point 4BED : 4 POINT

Lighting and Ventilation Sufficient lighting and ventilation should be provided at all working level prior to commence any activity inside the column. Sufficient air movers should be provided to cool down top level of column.  Lighting and air mover’s connection should be positioned in such a manner that it would not cause tripping hazard.

INSTALLATION OF TRAYS PRIOR TO INSTALLATION The Tray installation shall be as per tray manufactures certified drawings and installation procedure or as project specification and procedures. All man ways opening and serration area should be covered and protected to avoid scratch/damage. The tray assembly work shall be started from bottom stage to top stage. However, in case of small diameter tower, it may be easy to make partition platform at middle and another group can proceed with installation from middle to top, so the work progress will be very fast. A minimum of 1 tray for each type shall be pre-assembled on the ground to familiarize workmen with general layout of trays and the specific hardware location to be witnessed by Quality control.  Tray support ring should be inspected for horizontal levelness and shall be accepted if the high to low point measurement are within the tolerance as per ARAMCO STANDARD. Levelness checking by manometer (Transparent PVC tube with water and steel scale. Sign off ring levelness or review the levelness inspection report conducted at vendor shop. Rings and walls should be cleaned prior to installation of tray. Use vacuum cleaner to clean tray prior inspection Erect the scaffold inside column to install the bottom trays of each group.

INSTALLATION OF TRAYS TRAY INSTALLATION Determine the correct orientation of the first layer from the vessel arrangement drawings. It is normal to start from lower side of the tower and built upward. The down comers shall be installed first followed by inlet panels and active panels. The bottom tray in section can act as a platform provided adequate load spreading Metallic boards, wooden blocks are in place. Install all the Panels as per the vendor installation drawing until top of column. Cleaning and keeping in order shall be done for each tray stage successively and final inspection should be carried out. The following shall be confirmed after tray assembling work Tightness of bolt is sufficient. There is no other disorder Direction of clamp is correct. Flow direction of tray panel The manholes should be closed immediately after final inspection

QUALITY CONTROL At all the levels of work execution relevant project specification, drawings, vendor instruction and applicable codes and standard will be followed. Request for inspection will be submitted after successive 3-6 layers of installation depending upon the access and the type of trays. Wherever small access, each layer shall be offered for inspection. Method of inspection and criteria of acceptance shall be as per the approved ITP in accordance to the vendor instruction but as minimum the following items to be checked. Tower inside cleanliness (non existence of scales, slag, spatter, sand, paint, oil, mist etc. Prepare or review the inspection sign-off sheet for both the ring levelness and measurements Confirm the condition of trays free from abnormalities and deformations. Match marks and identification are correct. Tray levelness is within tolerance. Clearance for down comers and tray. Height and horizontality of outlet weir is within tolerance Confirm the clamps are attached in correct direction. Confirm the correctness and tightness of fasteners by torque wrench. Tolerance for respective dimensions to be followed as mentioned in the specification, vendor manual and drawings.

Installation of packing Vapor outlet to condenser Reflux from condenser manhole Liquid distributor Bed limiter Random packing manhole Supporting plate Liquid distributor Liquid feed Bed limiter Random packing manhole Supporting plate collector Re boiler return Vapor feed Skirt Circulation to re boiler Bottom product