Quantifying risk through a rigorous analytical approach to the real world challenge of offshore wind construction – downtime, constraints and sequencing.

Slides:



Advertisements
Similar presentations
Interfacing Risk and Systems Engineering – Left Shift Risk Management
Advertisements

Forth Estuary Forum 28th Nov 2013
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
Optimising Site Investigations for Offshore Wind Farm Projects Mark Finch Geotechnical Engineering Manager Hydrosearch Associates, Aberdeen UK Offshore.
Rampion Offshore Wind Farm Onshore Construction Elements.
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
Scroby Sands Offshore Wind Farm Update 18 April 2002 Anne-marie Coyle.
UK’s First Commercial Scale Offshore Wind Farm 26th March 2003 NWP Offshore Ltd.
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Walney Extension offshore wind farm Meeting with the Planning Inspectorate Bristol 1 st March 2013.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
TECHNOLOGY AND INNOVATION Substructure design, manufacturing and new concepts Stockholm, 2009 September 15 th INNOVATIONS IN DESIGN AND INSTALLATION.
No Offshore Wind Farm Without Certification European Offshore Wind Conference Dipl.-Ing. Matthias Laatsch Dieser Platz ist für Ihr Bild vorgesehen.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
Towards Quantification of Condition Monitoring Benefit for Wind Turbine Generators Mr. David McMillan (Presenting) and Dr. Graham W. Ault Evaluate and.
Case 1: Optimum inspection and maintenance rates (wind turbine is available during inspection) Case 2: Optimum inspection and maintenance rates (wind turbine.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Virginia : Offshore Wind Feasibility Analysis Trevor S. Daubenspeck.
|Date Sustainable service logistics for offshore wind farms NWO Call ‘Duurzame logistiek’ Startbijeenkomst, Utrecht, January Prof.
Accuracy of calculation procedures for offshore wind turbine support structures Pauline de Valk – 27 th of August 2013.
Frank Coenen For InControl SA CEO Northwind NV
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
Wind Farm Design and Engineering Mark Legerton Head of Engineering and Supply Chain April 2010.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
Commercial Opportunities
Offshore wind resource assessment Colin Morgan and Graham Gow Garrad Hassan and Partners
MARCH 1 Risk Management Why carry out Risk Assessment? l Is the project too risky? l Threat intensity? l Improve decision making l Clarification of terms.
Lessons Learnt from European Offshore Wind: 1999 to 2011 – a broad brush perspective Sebastian Chivers, Senior Vice President June 22, 2011 – Virginia.
AquaRET 2 LEONARDO DA VINCI - Transfer of Innovation AquaRET 2 Online Survey results Bilbao, 05/10/2010 E. Mavrou Environmental Scientist, MSc CRES - Greece.
Simulation Based Production Planning, Scheduling, and Control Johannes Krauth Sim-Serv.
OC 3 : Benchmark Exercise of Aero-elastic Offshore Wind Turbine Codes J A Nichols and T R Camp, Garrad Hassan and Partners Ltd. J Jonkman and S Butterfield,
Assessment of Large-Scale Marine Energy Deployment 1/17 Economic Assessment of Large- Scale Wave Energy Deployment.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
FP7 /1 EUROPEAN COMMISSION - Research DG - December 2006 Building a Europe of Knowledge Towards the Seventh Framework Programme Marta Moren Abat,
EWEC 2006, Athens1Jan Rispens Wind Energy Agency Bremerhaven/Bremen (Bild: Enron Wind) The WAB Industry Network in Northwest-Germany Profile and R&D-Activities.
Dan Finch Moray Offshore Renewables Ltd. DELIVERING ROUND 3 Inverness 2nd February 2010 MORAY FIRTH OFFSHORE RENEWABLES Ltd.
Collaboration | commercialisation | diversification | internationalisation Subsea UK Planned Events Shaping the Events for 06 and 07 Patrick O’Brien Director.
NAVITUS BAY UPDATE Sean Matthews Project Engineer 20 March 2013.
- EADS Astrium Proprietary & Confidential EADS Astrium Proprietary & Confidential - 05/07/2006, Rhodes Rural Wings Ariane Muller & Laurent Thomasson.
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
© Shepherd and Wedderburn LLP Oil & Gas v Offshore Renewables: Regulatory Framework & Contractual Landscape Lynne Scott 26 January 2015.
BARD Engineering OFFSHORE WIND INSTALLATION SOLUTIONS - INSPIRED BY OFFSHORE OIL AND GAS European Offshore Wind conference Berlin, December 2007.
Alastair Dutton Crown Estate. Offshore Wind Energy UK Supply Chain Events Alastair Dutton Round 3 Development Manager 2 February 2010.
Rampion Wind Farm Supply Chain Project MEET THE BUYER EVENT 11 FEB 2015.
E-ON RAMPION OFFSHORE WIND FARM
1 Win-Win solutions combining Security and Logistics Dr. Nils Meyer-Larsen Institute of Shipping Economics and Logistics Bremerhaven October 2009.
Building Offshore Wind in England: Centres of Offshore Renewable Engineering (C.O.R.E) British Embassy, Lisbon, 25th October 2012.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Euromed October 2010 A Flexible Desalination Solution.
1 EUROGIA+ Success Story – A project, “WIFI”. 2 WIFI – Wind Farm Installation Vessel New concept of barge for the installation of offshore in-one-piece.
H2020 Proposals LIFES 50 PLUS James Battensby – Technical Bid Manager 23 rd June 2015.
Planning and Realisation of Wind Farms
Offshore Wind ENERGY – SUSTAINABLE, ECONOMICAL, sAFE
Manufacturing in Denmark
Breaking waves on the offshore wind turbine monopiles and the effects of boundary layer
Renewables: Moy Wind Farm
Eidesvik Offshore ASA – General Meeting
East Hall under construction
VirMan: Virtual Manufacturing Plant
What digitization will mean for the industry in a few years time
Closed Loop Wind Farm Control
Operation & Maintenance
DG MARE Study to support Impact Assessment on the Marine Knowledge 2020 Interim report Michael Munk Sørensen 11 december 2012 COWI POWERPOINT PRESENTATION.
LEANWIND Project - Introduction
The supply chain’s role in the journey to ‘subsidy free’
Funder Preferred Risk Allocation
Presentation transcript:

Quantifying risk through a rigorous analytical approach to the real world challenge of offshore wind construction – downtime, constraints and sequencing. Nick Baldock Garrad Hassan and Partners Ltd

Contents  Problems Facing Offshore Wind Farm Construction  Garrad Hassan Approach  Validation Case Study  Conclusions  Summary

Risk Marginal economics Complex & costly Few EPC offerings Contractual interface risks Offshore Wind Farm Construction

Questions? Managing Contractors Capturing Project Restrictions Assessing Weather Delay Supply Chain Risks Optimal Vessel Strategies Time & Budget Contingency

Garrad Hassan Approach O 2 C (Optimise Offshore Construction) Model - Structure DEFINE OPERATIONS LONG-TERM WEATHER DATA TIME DOMAIN SIMULATIONS OPERATION DURATION DISTRIBUTIONS DEFINE SEQUENCE RULES DEFINE PROJECT DEFINE OTHER CONSTRAINTS DEFINE BUILD SEQUENCE MONTE CARLO ENGINE PERTURB SEQUENCE OPTIMAL SEQUENCE TOTAL DURATION DISTRIBUTION STAGE 1 STAGE 2

Stage 1 – Time Domain Simulations - Operation Duration Distribution - For each defined offshore operation - Monthly basis DEFINE OPERATIONS LONG-TERM WEATHER DATA TIME DOMAIN SIMULATIONS OPERATION DURATION DISTRIBUTIONS Monopile & Transition Piece Installation Ideal Duration 50hrs

Garrad Hassan Approach O 2 C (Optimise Offshore Construction) Model - Structure DEFINE OPERATIONS LONG-TERM WEATHER DATA TIME DOMAIN SIMULATIONS OPERATION DURATION DISTRIBUTIONS DEFINE SEQUENCE RULES DEFINE PROJECT DEFINE OTHER CONSTRAINTS DEFINE BUILD SEQUENCE MONTE CARLO ENGINE PERTURB SEQUENCE OPTIMAL SEQUENCE TOTAL DURATION DISTRIBUTION STAGE 1 STAGE 2

- Project Build Duration Distribution - For each defined activity sequence Weather Downtime Logistical Downtime Stage 2 – Programme Modelling & Optimisation DEFINE SEQUENCE RULES DEFINE PROJECT DEFINE OTHER CONSTRAINTS DEFINE BUILD SEQUENCE MONTE CARLO ENGINE PERTURB SEQUENCE OPTIMAL SEQUENCE TOTAL DURATION DISTRIBUTION Total Project Build Duration Distribution

Model Validation Case Study Egmond ann Zee Offshore Wind Farm

- Modelled Construction Operations: Monopile & TP Installation - Svanen (36 Units) Turbine Erection – A2SEA ‘Sea Energy’ (36 Units) Export Cable Installation (3 Units) Inter-Array Cable Installation (33 Units) Turbine Commissioning Wind Farm Reliability Testing Validation Case Study

Egmond ann Zee Case Study Stage 1 Results - Monopile Foundation Installation Duration Distributions (Single Unit per Trip) Duration [hrs] (March) Duration [hrs] (June) Duration [hrs] (September) Duration [hrs] (January) Iterations

Egmond ann Zee Case Study Stage 1 Results - Turbine Erection Duration Distributions (2 Turbine Units per Trip) Duration [hrs] (March) Duration [hrs] (June) Duration [hrs] (September) Duration [hrs] (December) Iterations

Egmond ann Zee Case Study Stage 2 Egmond ann Zee project definition - Segregated into 10 construction zones - Single contractor per zone at any one time - Construction sequence: 1. Foundation Installation 2. Sub-Sea Cable Installation 3. Cable Terminations 4. Wind Turbine Erection 5. Cable Testing 6. Wind Turbine Testing 7. Wind Turbine Commissioning

Egmond ann Zee Case Study Stage 2 Results - Monopile & Transition Piece Installation O2C Predicted P(50) Project Build Duration Egmond ann Zee Total Project Duration O2C Predicted P(90) Project Build Duration 4 Days P (50) P (90)

Egmond ann Zee Case Study Stage 2 Results - Wind Turbine Erection O2C Predicted P(50) Project Build Duration Egmond ann Zee Total Project Duration O2C Predicted P(90) Project Build Duration 65 Days P (50) P (90)

Egmond ann Zee Case Study Stage 2 Results - Wind Turbine Erection (without logistic downtime) O2C Predicted P(50) Project Build Duration Egmond ann Zee Total Project Duration O2C Predicted P(90) Project Build Duration 1 Day P (50) P (90)

Egmond ann Zee Case Study Stage 2 Results - Total Project Build Duration O2C Predicted P(50) Project Build Duration Egmond ann Zee Total Project Duration O2C Predicted P(90) Project Build Duration 38 Days P (50) P (90)

Egmond ann Zee Case Study Conclusions - Good level of agreement (weather downtime modelling) - Modelling of project zones results in artificial delay (Egmond) - Modelling as an EPC contract would result in a better agreement - Complete project build duration within model’s P(50) to P(90) limits

Summary The value of O 2 C Modelling - Allows resourcing sensitivity studies - Allows cost benefit analysis - Allows developer to assess & reduce contract interface risks - Importantly allows for a novel visualisation of the project build

Thank You for Your Attention Nick Baldock - Garrad Hassan Main Stand Hall 2. No Contact details: (UK) (UK) (France) References: Offshore Wind Farm Egmond ann Zee General Report,