Charles SCAWTHORN Junji KIYONO Kyoto University Earthquake Risk Reduction 3- Mitigation and ERR Program Development 1. Concepts and Terminology 2. Hazard,

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Risk Management Introduction Risk Management Fundamentals
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
Dr. James Kallman, ARM 6-1 Advanced PowerPoint Presentation ©2009 The National Underwriter Company.
Introduction to Business Continuity Planning An Introduction to the Business Continuity Planning Process Including Developing your Process and the Plans.
@TxSchoolSafety Continuity of Operations Planning Workshop Devolution & Reconstitution.
RECOVERY and RECONSTRUCTION after the PAKISTAN EARTHQUAKE CHOOSING OPTIONS THAT WILL FACILITATE LONG-TERM RECOVERY THE OCTOBER 8, 2005 DISASTER.
Update Training Meeting
SEISMIC RISK REDUCTION Stela PETRESCU MDPWH PMU General Director Ministry of Development, Public Works and Housing ICAR FORUM, Bucharest, 1-2 October 2007.
Financial Planning Financial Planning An Introduction to the Financial Planning Process Conducted by: Lawrence W Wiswall Jr. TCS Financial Services, Inc.
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Investing and Financing Decisions and the Balance Sheet Chapter 2.
Chapter 4: Insurance Company Operations
Cost Management and Decision Making Chapter 13. Decision making process  Step 1: Goal setting  Provides guidance  Goals  Tangible  Quantifiable 
Operational Risk Management
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Chapter 4 Risk Management BCN 4772 Summer Risk Management What is Risk? What is Risk? Specific types of Risk Specific types of Risk Inflation Inflation.
Economic Aspects of Information Systems Updated 2015 MIS 2000 Information Systems for Management Instructor: Bob Travica.
Syed M. Ahmed, Ph.D. Department of Construction Management Risk Management in Construction Syed M. Ahmed, Ph.D. Department of Construction Management Florida.
DISASTER PREPAREDNESS A KEY ELEMENT OF BECOMING DISASTER RESILIENT Walter Hays, Global Alliance for Disaster Reduction, University of North Carolina,
Patrick DeCorla-Souza, P3 Program Manager, FHWA
Outline: Lecture 4 Risk Assessment I.The concepts of risk and hazard II.Shaking hazard of Afghanistan III.Seismic zone maps IV.Construction practice What.
Damage and Reconstruction Needs Assessment 1 11 Prevention and mitigation: post- disaster/post-crises management Session 3 World Bank Institute Ricardo.
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Investing and Financing Decisions and the Balance Sheet Chapter 2.
Business Crisis and Continuity Management (BCCM) Class Session
1 Introduction to Security Chapter 5 Risk Management: The Foundation of Private Security.
Earthquake Insurance for California Renters & Homeowners Presented to the Bay Area Earthquake Alliance Daniel P. Marshall, III General Counsel California.
Master Policy and Unit Owner Policy June 11, 2015 Insurance.
1 PREVENTION AND MITIGATION: POST- DISASTER/POST-CRISES MANAGEMENT Ricardo Zapata Marti UN ECLAC.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Introduction Time Quality Cost Project Constraints Success Introduction.
Pacific Island Countries GIS/RS User Conference Suva, Fiji November 2010 Tools for Disaster Risk Management and Climate Change Adaptation Abigail Baca.
Mitigation can include structural and nonstructural efforts.
Real World Applications of USGS EQ Science: Stacy Bartoletti Degenkolb Engineers Structural Engineers Association of Washington Cascadia Region Earthquake.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
VULNERABILITY OF BUILDINGS TO EARTHQUAKE GROUND SHAKING GENERALIZED VULNERABILITY ASSESSMENTS BASED ON CHANGES IN A BUILDING’S ELEVATION AND FLOOR PLAN.
Investing and Financing Decisions and the Balance Sheet Chapter 2 McGraw-Hill/Irwin © 2009 The McGraw-Hill Companies, Inc.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Fire and Emergency Services Company Officer — Lesson 27 Fire and Emergency Services Company Officer, 4 th Edition Chapter 27 — Administrative Programs.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
Financial Planning Financial Planning An Introduction to the Financial Planning Process An Introduction to the Financial Planning Process Presented by:
Chapter 20 THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition Chapter Managing the Firm’s Finances.
Liability Issues for TRIO Programs Managing Your Project’s Risk.
Paper Presented at World Bank Conference on Financing the Risks of Natural Disasters: A New Perspective on Country Risk Management June 2-3, 2003 Washington,
LESSONS FROM PAST NOTABLE EARTHQUAKES. Part IV Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
MANAGING BUSINESS RISKS AN OVERVIEW CSU, Northridge January, 2004 Chris Brady University Risk Manager.
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
EARTHQUAKE DISASTER RESILIENCE PART I: Informing Community Stakeholders About Disaster Resilience Dividends Walter Hays, Global Alliance for Disaster Reduction,
12-1 Chapter Twelve Financial Considerations Chapter learning objectives 12.1 Appreciate the potential benefits of accounting and financial analysis.
Risk Management CS5493. Risk Management The process of ● identifying, ● assessing, ● prioritizing, and ● mitigating risks.
Post-Georges Disaster Mitigation Post-Georges Disaster Mitigation in Antigua and Barbuda Funded by a special appropriation by the U.S. Congress to countries.
Post-Georges Disaster Mitigation Post-Georges Disaster Mitigation in St. Kitts and Nevis Funded by a special appropriation by the U.S. Congress to countries.
Certified Protection Officer Program. Chapter 1 Unit 1 Concepts and Theories of Asset Protection Pages 3-11.
THE ART AND SCIENCE OF IDENTIFYING AND ELIMINATING VULNERABILITIES TO EARTHQUAKES IN A COMMUNITY’S BUILT ENVIRONMENT Walter Hays, Global Alliance for.
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
BASICS OF DYNAMICS AND ASEISMIC DESIGN
MAGNITUDE 6.7 EARTHQUAKE STRIKES CENTRAL JAPAN Saturday, November 22, 2014 Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
Chapter 13 Risk Management. Chapter Objectives 1.Define risk and risk management 2.Outline key risk issues and types of risk 3.Identify concrete methods.
2015 Snohomish County Hazards Mitigation Plan Update Public Meeting Snohomish County Department of Emergency Management, Everett, WA October 23, :00.
Geologic Hazards Geologic Hazards are those Earth processes that are harmful to humans and/or their property. Includes: Earthquakes Volcanic eruptions.
Albania Disaster Risk Mitigation and Adaptation Project
A comprehensive approach to recognizing and managing risk in business
M7.1 RABOSA EARTHQUAKE 1:15 PM; September 19, 2017
Risk Management Definition
Air Carrier Continuing Analysis and Surveillance System (CASS)
Chapter 7: RISK ASSESSMENT, SECURITY SURVEYS, AND PLANNING
Presentation transcript:

Charles SCAWTHORN Junji KIYONO Kyoto University Earthquake Risk Reduction 3- Mitigation and ERR Program Development 1. Concepts and Terminology 2. Hazard, Vulnerability & Risk Assessment 3. Mitigation and ERR Program Development

 Mitigation  Risk Mitigation Alternatives  Operational  Risk Transfer  Develop the Program  Benefit-cost ratio  Acceptable risk  Implement the Program  Funding  Seismic retrofit  Emergency planning  Maintain the Program Key Terms

Mitigation Four basic methods for Mitigation:  Structural  Locational  Operational  Risk Transfer

Structural (using buildings as an example) (a) moment frame (d) base isolation Bracing Types “K” “V” Chevron eccentric “X” diagonal (b) braced frame (c) shear wall (e) damped frame CPU (f) active control system: ground motion sensor, processor, and controlled mass

Seismic Retrofits

Locational California Alquist-Priolo fault map, showing location of fault, and zone within which geologic investigation is required AP Zone Fault Actual fault Shaking intensity map

Operational EOC Director (Management) Finance/ Administration Logistics Planning/ Intelligence Operations EOC Director (Management) Finance/ Administration Logistics Planning/ Intelligence Operations Operational Area EOC Local Government EOC

Single buildings Insurance company Single buildings Insurance company Single buildings Insurance company Reinsurance company Risk Transfer

Mitigation of damage and loss is possible at each step of earthquake loss process; earthquake occurs, primary hazards, primary damage, secondary hazard/damage, primary loss, and secondary loss. Risk Mitigation Alternatives EARTHQUAKE OCCURS PRIMARY HAZARDS: Faulting, Shaking, Liquefaction, Landsliding, Tsunami… SECONDARY LOSS: Business / Operations Interruption Market Share, Reputation… PRIMARY LOSS: Life / Injury, Repair Costs, Function, Communications/Control… SECONDARY HAZARD / DAMAGE: Fire, Hazmat, Flooding… PRIMARY DAMAGE: Building / Structural Nonstructural / Equipment MITIGATION Improved emergency planning and response; insurance… Hazard mapping; ground remediation; tsunami walls… Bracing and strengthening, reduction of mass, base isolation, structural control… Improved storage/infrastructure, better emergency response… RESULT Demand (hazard) eliminated or reduced Capacity (strength…) increased Loss avoided or shared Secondary demands eliminated or reduced

 Earthquakes are a problem, in the most general sense, solving a problem has three basic phases.  Phase 1: Understanding the problem  Phase 2: Finding the solution  Phase 3: Putting the solution into effect Outline of Risk Reduction Program Pre-program Assess the Risk Develop the Program N Acceptable? Y Stop Acceptable? Y N Implement the Program Maintain the Program Factors - Seismic environment? - Organization / decision- making - Responsibility / liability Data - Seismic hazard - Exposure - life - property - business / function - revenue - data - market share - reputation / image - Vulnerability - Assessment Mitigation Options - Locational - Redundancy / backup - Move - Structural - Strengthen structures - Brace equpment / furnishings - Operational - Emerency Plan - Backup data - Transfer - Insurance - Contracts

Measuring Benefits Internal Rate of Return is the discount rate that “sets the net present value of the stream of net benefits [and costs] equal to zero”- effectively a measure of the return on investment Benefit Cost Ratio Life Cycle Cost Cost Damage $ Design Level Tot Cost Constr. Cost

 Identify the assets (people, property, function) at risk.  The corresponding losses for people, property and function are death and injury, financial loss, and business interruption, revenue, market share.  Establishing (i.e. quantifying) the seismic hazard  It is a representation of how strongly the ground will shake and how often it is likely to do so.  Developing performance objectives  No loss of life (no significant collapse hazard), limited property loss, no loss of essential equipment, and restoration of operation onsite or backup site within the time appropriate for the organization.  Performing first a risk screening and then, for selected structures, a more detailed review Assess the Risk

 Developing the program, which consists of determining the acceptable risk, the opinions that exist for reducing the current risk to an acceptable level, the costs of doing that, and how it should be accomplished.  Having performed risk screening, facilities may be usefully grouped into several categories, such as  I.Probable high risk  II.Possible high risk  III. Probable low risk  The category I and category II facilities should be subjected to a more detailed analysis.  All the category I and II facilities can be ranked according to their risk, mitigation costs, or other criteria. The ranking is based on a benefit-cost ratio.  The final decision as to what facilities to mitigate will depend on available budget and is the final expression of the organization’s acceptable risk. Develop the Program

 Retaining seismic retrofit design professionals:  Initial investigation and screening  Detailed investigation and conceptual retrofit design  Construction documents and construction support  Funding the program; the following sources should generally considered when planning programs of seismic mitigation.  General operating and maintenance funds  Bond issues  Special use fee  Hazard mitigation grants  Tax preferences and credits  Coordinating with other parts of the organization; it is very important to include earthquake risk mitigation measures with other facets of an organization’s asset management program. Implement the Program

 Organizations are dynamic and facilities, operations, and personnel are constantly changing. Thus documentation of the step taken, including the process and criteria, is an important step to complete.  As new facilities or operations are developed, the same or enhanced criteria can be applied to them, thus retaining the overall balance of earthquake mitigation program.  As new personnel join the organization, they can review the earthquake mitigation program documentation and maintain the overall goals. Maintain the Program

Summary An Earthquake Risk Reduction Program involves the following steps: 1.ASSETS: Identify and map the assets at risk – the people, property, business and cultural treasures. Where are they, how many are they, what is their value? 2.HAZARDS: Map the earthquake hazards that threaten these assets. Hazards include faulting, shaking, liquefaction, tsunami, landslide, fire. 3.VULNERABILITY: Assess the vulnerability of each asset to the hazards – is an highly vulnerable, moderately, or just low? 4.ANALYZE: Combine the information on Assets, Hazards and Vulnerability into a Risk Analysis. Map the areas of High Risk. 5.MITIGATION: Based on the assets, hazards and vulnerabilities, identify various ways in which the risk can be lowered. Select the mitigation method that makes the most sense – ie, is most effective for the least cost. 6.DEVELOP THE PROGRAM: Having a mitigation package, gather community support and find ways to pay for the mitigation. Develop a Plan for doing the mitigation over a several year timeframe. 7.IMPLEMENT THE PROGRAM: Do it. Don’t stop. Earthquakes won’t wait.