+ Impact Evaluations and Measurement and Verification First we will focus on ‘Gross Savings’ Determination - savings determined irrespective of why 1 Kentucky.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

4 basic approaches to determining energy efficiency benefits (savings) 1.Stipulated or deemed savings 2.Individual Building Metering – Measurement and.
Using computer simulations to assess energy and carbon reductions in building CDM projects Joe Huang March 14, 2011.
New Paradigms for Measuring Savings
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Model Energy Efficiency Program Impact Evaluation Guide - Basics of EM&V Steve Schiller. Schiller Consulting NARUC.
Energy Performance Analysis with RETScreen
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
MEASUREMENT & VERIFICATION
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
Franco Barnard M&V Project Engineer Baseline Service Level Adjustments of ECM on Compressed Air Systems 16 August 2012.
Chapter 15 Application of Computer Simulation and Modeling.
Overview Lesson 10,11 - Software Quality Assurance
Software Quality Control Methods. Introduction Quality control methods have received a world wide surge of interest within the past couple of decades.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
INDUSTRIAL, AGRICULTURAL AND LARGE COMMERCIAL (IALC) ROADMAP CUSTOM IMPACT EVALUATION WEBINAR TO PRESENT RESEARCH PLAN Presentation July 28, 2014.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
Financial Assessment and
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
Practical Experiences in Applying Savings M&V
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
M&V Part 2: Risk Assessment & Responsibility Allocation.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
1 Improving Data Quality. COURSE DESCRIPTION Introduction to Data Quality- Course Outline.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
Forecasting and Verifying Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
CHAPTER 12 Descriptive, Program Evaluation, and Advanced Methods.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
+ Websites California Measurement Advisory Council Collaborative for Energy Efficiency 1 Kentucky PSC 9/11/09 Schiller Consulting, Inc.
2010 Massachusetts Energy Efficiency Programs July 1, 2010.
National Action Plan for Energy Efficiency eeactionplan The Role of Energy Efficiency in Utility Energy Planning Snuller Price Partner Energy.
1 Limestone County School District Energy Update Year Eleven Report September 2008 – August 2009.
Deemed Savings Methodologies Reid Hart, PE Associate Director, Technical Research July 2009 – Regional Technical Forum.
Chap. 5 Building Valid, Credible, and Appropriately Detailed Simulation Models.
Chapter 10 Verification and Validation of Simulation Models
Guidelines Revisions Defining What RTF Means by “Savings” December 17,
New Construction Studies Performed by: MAESTRO/CALMAC Evaluation Showcase ● Pacific Energy Center ● July 26-27, 2006 EM&V of the Statewide Savings By Design.
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
Energy Project M&V: Reports that Add Value October 27, 2015.
What is Building Commissioning, M&V and Energy Performance Contracting? New Occupations in Sustainability.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
1 Summary of Reviews: Workpapers Approved by the California Technical Forum Part 2 Meeting: California Technical Forum January 28, 2016 Jeff Hirsch/Kevin.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Cost-Effectiveness Analysis of BGE’s DSM Programs Marshall Keneipp, PE Summit Blue Consulting, LLC Prepared for: Energy Efficiency and Conservation Stakeholders.
Metering and Measuring of Multi-Family Pool Pumps, Phase 1 March 10, 2016 Presented by Dan Mort & Sasha Baroiant ADM Associates, Inc.
Presented to The Raymore Peculiar Schools Board of Education Van McLain Energy Educator/Manager February 26 th, 2007Energy Management Conservation Program.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
Seminar On Energy Audit Submitted To: Submitted By:
Chapter 10 Verification and Validation of Simulation Models
Behavior Modification Report with Peak Reduction Component
MECH 3550 : Simulation & Visualization
EM&V Planning and EM&V Issues
Presentation transcript:

+ Impact Evaluations and Measurement and Verification First we will focus on ‘Gross Savings’ Determination - savings determined irrespective of why 1 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Impact Evaluation Concepts Impact evaluations are used for determining directly achieved program benefits (e.g., energy and demand savings, co-benefits) Savings cannot be directly measured, only indirectly determined by comparing energy use after a program is implemented to what would have been consumed had the program not been implemented (i.e., the baseline) Evaluation attempts to measure “what did not happen.” Impact = Actual post – Projected pre ± Adjustments It is an estimate, with uncertainty, thus fundamental questions are: How good is good enough? As compared to what? 2 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Determining Savings Comparison of energy use before and after a program is implemented 3 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Impact Evaluation Results Reported Estimates of Gross Savings: Gross energy savings are the change in energy consumption and/or demand that results directly from program-promoted actions taken by program participants regardless of the extent or nature of program influence on their actions. Estimates of Net Savings : Net energy savings refer to the portion of gross savings that is attributable to the program. This involves separating out the impacts that are a result of other influences, such as consumer self-motivation. Given the range of influences on consumers’ energy consumption, attributing changes to one cause (i.e., a particular program) or another can be quite complex. Estimates of Co-Benefits : A co-benefit commonly documented and reported is avoided air emissions: the air pollution or greenhouse gases that would have been emitted if more energy had been consumed in the absence of the energy efficiency program. 4 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Two Components to M&V 5 Verify potential to generate savings Determine savings Example: Lighting Retrofit - Potential to Generate Savings: Before 100 Watts/fixture After 23 Watts/fixture Savings: Savings determined using a variety of approaches how many fixtures and operating hours Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Approaches for Determining Gross Energy Savings Deemed savings that are based on historical and verified data, are applied to conventional energy efficiency measures implemented in the program. Statistical analyses of large volumes of metered energy usage data are conducted. One or more measurement and verification (M&V) options (A, B, C and/or D) from the IPMVP are used to determine the savings from a sample of projects. These savings are then applied to all of the projects in the program. 6 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Gross Savings: Deemed Savings Approach Deemed savings are used to define savings values for projects with well- known and documented savings values. Deemed Measures values: For simple efficiency measures whose performance characteristics and use conditions are well known and consistent, a deemed savings approach may be appropriate Deemed Calculated Measures. A slightly more complex approach to estimating savings is to use simplified, pre-defined calculations that employ a combination of deemed or “default” input assumptions with some site-specific inputs. The use of deemed values in a savings calculation is an agreement to accept a pre-determined value, irrespective of what actually “happens”. Deemed values and deemed calculation approaches are often documented in a “Technical Reference Manual” 7 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Deemed Savings, Sources Deemed values, if used, should be based on reliable, traceable, and documented sources of information, such as: Standard tables, from recognized sources, indicating the power consumption (wattage) of certain pieces of equipment that are being replaced or are being installed as part of a project (e.g., lighting fixture wattage tables) Manufacturer’s specifications Building occupancy schedules Maintenance logs When using deemed values, it is important to realize that technologies alone do not save energy; it is how they are used that saves energy 8 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ When to Use Deemed Savings Assessing a few key aspects of the project can drive decisions about whether to use stipulations and how to use them effectively in an evaluation plan: Availability of reliable information The project’s likelihood of success in achieving savings Uncertainty of the stipulated parameter and its contribution to overall project uncertainty The cost of measurement Several “rules of thumb” are: The most certain, predictable parameters can be estimated and stipulated without significantly reducing the quality of the evaluation results. Stipulating parameters that represent a small degree of uncertainty in the predicted result and a small amount of savings will not produce significant uncertainty concerns. Parameters should be measured when savings and prediction uncertainty are both large. Even if savings are high, but uncertainty of predicted savings is low, full measurement may not be necessary for M&V purposes. 9 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Gross Savings: Large-Scale Data Analysis Approach Large-scale data analysis applies a variety of statistical methods to measured facility energy consumption meter data (almost always whole-facility utility meter billing data) and independent variable data to estimate gross energy and demand impacts. Unlike the M&V whole-facility analysis option (IPMVP Option C) the meter analysis approach usually involves analysis of a census of project sites, versus a sample Types: Time series comparison Use of comparison group Comparison group/time-series Most large-scale data analyses involve the use of comparison groups 10 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Large-Scale Data Analysis Equations Time Series Savings = Q pre-installation – Q post-installation Comparison Group Savings = Q non-participants – Q participants Comparison Group – Time Series Savings = (Q pre-installation – Q post-installation ) participants – (Q pre-installation – Q post-installation ) non-participants 11 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Measurement and Verification Approach The M&V approach involves determining gross energy and/or demand savings by: Selecting a representative sample of projects Determining the savings of each project in the sample, using one or more of the M&V Options defined in the IPMVP Applying the sample projects’ savings to the entire population, i.e., the program 12 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

13 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Summary Today, IPMVP is the leading international energy efficiency M&V protocol: Still primarily operated as a volunteer organization - with document drafting and peer review technical committees IPMVP has been translated into 10 languages and is used in more than 40 countries Since going online, there have been more than 20,000 downloads of the IPMVP More information can be found at 14 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ What is in the IPMVP The IPMVP Is a framework of definitions and methods for assessing energy savings Was designed to allow users to develop a M&V plan for specific projects using the framework of definitions Was written to allow maximum flexibility in creating M&V plans that meet the needs of individual projects, but also adhere to the principles of accuracy, transparency and repeatability Is policy neutral Does not cover Program evaluation (M&V is about project evaluation - which can be part of a program evaluation) Operations and maintenance or demand response Determining net savings Sample (site) selection for impact evaluation Design of meter and instrumentation systems Cost estimating of M&V activities 15 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ IPMVP Contents Introduction Definition and Principles of M&V M&V Framework and Options M&V Planning and Reporting Adherence with IPMVP Discussion of Common Issues References Definitions Appendix A: Examples Appendix B: Addressing Uncertainty 16 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ IPMVP Summary of Options The IPMVP has four M&V options: Options A, B, C, and D The options are generic M&V approaches for determining energy savings from projects Four options provide a range of approaches to determining energy cost avoidance, depending on the characteristics of the energy efficiency projects being implemented, and balancing accuracy in reporting with the cost of conducting M&V. 17 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ IPMVP Retrofit Isolation and Whole Facility 18 The Whole Facility Options: Option C or D Addresses all effects in the facility - Retrofits AND other changes (intended and unintended) Often uses the utility meter The Retrofit Isolation Options: Option A or B Addresses only the retrofitted system - Ignores interactive effects beyond the boundary (although these may be independently addressed) Usually needs a new meter Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ IPMVP Options 19 Whole Facility Measurement Boundary Motors + VSDs Retrofit Isolation Boundary Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ IPMVP Options A-D Option A - Retrofit Isolation: Key Parameter Measurement Savings are determined by field measurement of the key performance parameter(s). Parameters(s) which are not measured are estimated. Estimated parameter(s) are based on engineering judgment, analysis of historical data, or manufacturer's data. Option B – Retrofit Isolation: All Parameter Measurement Builds upon Option A through the use of short-term or continuous metering of all major parameters. Option C -- Whole Facility Determine savings by examining overall energy use in a facility and identifying the impact of measures on total building or facility energy use. Requires comparison of facility-wide meters (typically utility meter) data before and after project installation. Option D – Calibrated Simulation Involves the use of software to create a model of a facility and its components and can be used to examine individual measures or entire facility savings. In order to assure accuracy the model is calibrated through comparing it with facility energy consumption or end-use monitored data. 20 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Option AOption B Baseline measurement400 kW210,000 kWh Post Retrofit measurement300 kW155,000 kWh Estimated operating hours500 hrs Avoided Energy100 kW x 500 hours = 50,000 kWh 55,000 kWh Lighting Retrofit Example 21 Retrofit Isolation Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Whole Facility Base Year Electricity Bill July ,000 kWh Post-retrofit Electricity Bill July ,000 kWh Raw difference Raw difference 200,000 kWh Adjustment for meter reading period length and weather + 25,000 kWh Corrected Avoided Energy 225,000 kWh Corrected Avoided Energy 225,000 kWh Lighting Retrofit Example 22 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Calibrated Simulation Simulated Base Year Electricity Use August ,000 kWh Simulated and Calibrated Base Year Electricity Use August ,000 kWh Post-retrofit Electricity Bill August ,000 kWh Avoided Energy,000 kWh Avoided Energy 79,000 kWh Lighting Retrofit Example 23 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Option A - Typical Application Lighting retrofit where power draw is the key performance parameter that is measured periodically. Estimate operating hours of the lights based on building schedules and occupant behavior. 24 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Option B - Typical Application Variable-speed drive and controls installed on a motor to adjust pump flow Measure electric power with a kW meter installed on the electrical supply to the motor, which reads the power every minute. In the baseline period this meter is in place for a week to verify constant loading. The meter is in place throughout the reporting period to track variations in power use. 25 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Option C - Typical Application Multifaceted energy management program affecting many systems in a facility. Measure energy use with the gas and electric utility meters for a twelve month baseline period and throughout the reporting period. 26 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Option D - Typical Applications Multifaceted energy management program affecting many systems in a facility but where no meter existed in the baseline period - new construction Energy use measurements, after installation of gas and electric meters, are used to calibrate a simulation. Baseline energy use, determined using the calibrated simulation, is compared to either: a simulation of reporting period energy use, or actual meter data. 27 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Applying IPMVP Regardless of the Option followed, similar steps are taken to determine savings: Step 1: Develop a Project Specific M&V Plan Step 2: Gather the baseline data (energy, demand and operating conditions) Step 3: Verify the proper equipment/systems were installed and are performing to specification - potential to perform Step 4: Gather post-retrofit measured data and compute energy and demand savings (and cost avoidance) as defined in the M&V Plan - actual performance 28 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ A “Typical” Combination for Determining Gross Savings Set of prescriptive programs use deemed savings values (e.g., residential CFLs and refrigerators) Set of prescriptive programs use deemed calculated approach with pre-defined equations, some deemed parameters, and ex- post site inspections for other parameters. (e.g., commercial ventilation fan measures) Another set of custom programs use M&V savings analyses (Options A, B, C and/or D) on a census of projects (e.g., industrial process measures) Residential weatherization/comprehensive retrofit program uses large scale billing data analyses 29 Kentucky PSC 9/11/09 Schiller Consulting, Inc.

+ Verification Not all of the evaluation approaches require field inspections, but it is recommended that there be some physical assessment of at least a sample of the individual projects This is to ensure that the measures installed are to specification and thus the projects included in a program have the potential to generate savings. This potential to generate savings can be verified through observation, inspections, and spot or short-term metering conducted immediately before and after installation. Utilities will need to do this for their programs, irrespective of the role of the Independent Program Evaluator Two parts to EM&V: (1) determining potential for savings and (2) estimating actual savings 30Kentucky PSC 9/11/09 Schiller Consulting, Inc.