Workshop 16 - 17 September 2004 Sandilands, United Kingdom COMRISK Subproject 8 “Risk Assessment Lincolnshire, Pilot Studies” (SP8)

Slides:



Advertisements
Similar presentations
BAS I C BASIC Vulnerability and Adaptation in Coastal Zones of India Lessons from Indias NATCOM D.Parthasarathy, K.Narayanan, and A.Patwardhan Indian Institute.
Advertisements

Risk-Based Coastal Asset Management
Concepts and Science for Coastal Erosion Management Coastal State Indicators for Coastal Erosion James Sutherland HR Wallingford.
International workshop to discuss the science of asset management, 9 th December 2011 Long term investment planning Developing practical strategic investment.
US Department of Energy Smart Grid Computational Tool (SGCT) Overview Note: View presentation in Slide Show mode for best results
Real Options, Optimisation Methods and Flood Risk Management Michelle Woodward - HR Wallingford and Exeter University Ben Gouldby – HR Wallingford Zoran.
Before Katrina, you had a 1% chance every year of flooding this deep from Hurricanes Notes: The depth map tool is a relative indicator of progress, over.
Platzhalter für Bild, Bild auf Titelfolie hinter das Logo einsetzen Leichtweiß-Institute for Hydraulic Engineering and Water Resources Department of Hydromechanics.
Kystdirektoratet Gr Nr.1 Risk Assessment for the Wadden Sea Pilot study Ribe Dike Progress report of sub-project SP7 Workshop May 2004,
Foresight Flood and Coastal Defence Project Government Office for Science Department for Innovation, Universities and Skills Overview by: Colin Thorne.
AIACC Regional Study AS07 Southeast Asia Regional Vulnerability to Changing Water Resources and Extreme Hydrological due to Climate Change.
DEVELOPMENT PLANNING FOR COASTAL HAZARDS JUNE 30, 2006 BY ENGINEERING SECTION COASTAL ZONE MANAGEMENT UNIT COASTAL ENGINEERING FOR NATURAL HAZARDS.
National Centre for Risk Analysis and Options Appraisal Risk Assessment, RASP and IMPACT Ian Meadowcroft.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
“Research in dam breaching" Sílvia Amaral PhD Student (1 st year) December, 14 th 2009.
Technologies for adaptation to climate change: How to make them work?
Toronto, May 6-8, 2008Flood Defence1 Risk assessment in trans-boundary cooperation between the Netherlands and Germany Jan Stijnen.
COASTAL DEFENCES. There are many techniques used for reducing the power of waves before they erode a coastline. The photos illustrate some methods used.
Integrated Methods and Models for Assessing Coastal Impacts and Adaptation to Climate Change in Fiji and the Cook Islands (AIACC Project SIS09) Conducted.
Changes to FEMA Mapping John Grace, CFM Coastal Engineer - FEMA Region 1 - Boston March 14, 2014 – The Soil and Water Conservation Society – Winter Conference.
Broad Scale Modeling Dr Jon Wicks – Halcrow
TECHNOLOGY FOR ADAPTATION TO CLIMATE CHANGE IN COASTAL ZONES Richard J.T. Klein 1,2 1. Potsdam Institute for Climate Impact Research, Germany 2. Stockholm.
Eurosion and Conscience projects - brief overview Tom Bucx (Deltares) 9 June 2011 EEA Expert meeting Methods and tools for assessing.
COMRISK meeting – March 2003 EUROSION Coastal Erosion - Assessing the needs for actions Project funded by the European Commission.
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
ECLAC Disaster Assessment ECLAC Disaster Assessment Training Manual Section V (ii) Coastal Engineering: Reconstruction – Management and Mitigation.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
Adaptation and Resilience of Coastal Energy: ARCoES.
Concepts and Science for Coastal Erosion Management Data, Information and Tools for Effective Coastal Erosion Management James Sutherland HR Wallingford.
Flood risk assessment Arjen Markus Deltares (previous name: WL | delft hydraulics)
BREACH FORMATION A Review of State-of-the-Art Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 16/17 May 2002.
Modeling coastal flooding in urbanized lowlands: a multi- dimensional high-resolution approach Brett F. Sanders, Professor Timu Gallien, Ph.D. Student.
Sea-level changes and their impacts on critical infrastructure in South Tarawa Doug Ramsay, Scott Stephens & Rob Bell, NIWA Kabure Yeeting, Mike Foon,
Flood risk assessment Arjen Markus Deltares (previous name: WL | delft hydraulics)
Formulation of a New Breach Model for Embankments IMPACT Project Workshop, Wallingford 2002 Breach Formation Theme.
Impact of Global Change on the Coastal Areas of the Rio de la Plata: Sea Level Rise and Meteorological Effects AIACC – LA26 Argentina.
IMPACT-ADD proposal 1 st IMPACT Workshop HR Wallingford, UK th May 2002 Investigation of Extreme Flood Processes and Uncertainty - Additional Partners.
Xplorah: support for integrated spatial planning in Puerto Rico Xplorah is developed for the Graduate School for Planning of the University of Puerto Rico.
National-scale quantified analysis of future flood risk in the UK Paul Sayers Head of Floods and Water Management HR Wallingford, UK Jim Hall Professor.
How can coasts be protected from the effects of natural resources?
Nearshore Waves and Erosion Model Quantifying the Coastal Protection Benefits Provided by Natural Habitats.
Determination of initial conditions for dam erosion due to overtopping and possible integration into a probabilistic design concept Dr.-Ing. K. Broich.
Second National Communication of the Argentine Republic to the Conference of the Parties to the UNFCC. 2.
COMRISK Sub-Project 8 Lincshore: Risk Management Options Pete Floyd, Risk & Policy Analysts Ltd., working with Halcrow and the Environment Agency.
Strategic Regional Coastal Monitoring Programme in England
Coasts : Coastal Management / Shoreline Management Plans Key Terms : Shoreline Management Plan Sediment Cell No Active Intervention Hold the Line Advance.
COMRISK Workshop Norden 12./13. May 2004 Failure probability of the Ribe sea defence Andreas Kortenhaus Leichtweiß-Institut for Hydraulics (LWI) Dept.
IMPACT 4 November 20044th IMPACT Workshop - Zaragoza1 Investigation of extreme flood Processes and uncertainty Model uncertainty How uncertain are your.
International Levee Handbook Overview of the handbook Chapter 3 Functions, Forms and Failure of Levees.
VIEWING SURVEY DATA IN CONTEXT: CRITICAL, MAINTENANCE AND DESIGN TRIGGER LEVELS Jonathan Clarke Canterbury City Council.
11 October 2011 JANE MOON IMPACT OF THE TERMINAL GROYNE ON SEDIMENT TRANSPORT IN MINEHEAD BAY SENIOR GEOMORPHOLOGIST.
International Levee Handbook Overview of the handbook Chapter 8 Physical processes and tools for levee assessment and design.
RASP - Risk Assessment of flood and coastal defence for Strategic Planning A High Level Methodology Project partners and co-authors Paul Sayers / Corina.
Hightown Dune Restoration Scheme and the River Alt Update – September 2013 Graham Lymbery Sefton Council.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Specific Modelling Tools & Techniques.
OVERVIEW OF CLARA MODEL IMPROVEMENT TESTING Kenneth Kuhn – RAND Corporation Jordan Fischbach – RAND Corporation David Johnson – Purdue University.
Effects of Waves: Beach Erosion
Shaping the coast.
Xplorah: support for integrated spatial planning in Puerto Rico
Data for Beach Management (Plans) Magellan Day (1520) Dr Uwe Dornbusch Strategic & Development Planning Title highlights that management could be carried.
Responses Drivers Residential properties Damage to buildings
Effects of Waves: Beach Erosion
COASTS and SHORELINE NOTES
Adam Hosking and Rachel Fowler (Halcrow)
SPR – Middelkerke pilot area
Effects of Waves: Beach Erosion
Coastal Geology Erosional Shore Features.
Xplorah: support for integrated spatial planning in Puerto Rico
Jenny Watts Coastal Process Scientist, Plymouth Coastal Observatory
Presentation transcript:

Workshop September 2004 Sandilands, United Kingdom COMRISK Subproject 8 “Risk Assessment Lincolnshire, Pilot Studies” (SP8)

Location and Issues 23km coastline between Mablethorpe and Skegness Assets located within risk area include densely populated areas and many smaller towns and villages

Existing standard of defence and Tidal Flood extents for present defence conditions

4.5mODN Design berm width 1:15 beach slope Existing and proposed defences at Ingoldmells (not to scale) Scale of Shortfall

Location and volume of beach recharge between 1999 and 2004

Aim To provide an operational tool to assess the value (in terms of risk reduction) of various beach management scenarios. Input variables to be: beach profile and available budget.

1.Divide study frontage into section. 2.Identify a range of permutations for beach volume change across each identified zone. 3.Determine mode of defence failure (overtopping and breach) for the range of beach volumes within each zone. 4.Run flood propagation model for scenarios. 5.Develop a user system to enable input information on beach volumes within each zone, as determined by annual surveys, to access a series of look-up tables identifying associated risk. Outline Method

1.Divide study frontage into sections Wave Zones Coastal Cells Existing Seawall Structure and Beach Profile

2. Identify existing defence standard and beach volume change across each identified zone

3. Determine mode of defence failure (overtopping and breach) for the range of beach volumes within each zone. Failure modes Face Erosion Toe Erosion Overturning Reduction in bearing capacity Piping Extreme Overtopping Most prevalent structural failure mechanism for the Lincshore seawalls is due to extreme overtopping of the structure Low beach levels

Overtopping and beach changes Overtopping = F (storm, water level, structure, beach) Crest level, Berm width, Toe level, Slope Sediment size BEACH PARAMETERS VOLUME Overtopping = F (storm, water level, structure, beach volume)

Overtopping property crest back Face Dune OT1OT3 OT2 OT1 Overtopping Face/Crest Overtopping Face/Crest is the actual overtopping rate over 1st return wall OT3 Overtopping Back/Property The Overtopping Back/Property is the actual overtopping over the final line of defence onto the property OT2 Overtopping Crest/Back Overtopping Crest/Back is the (effective) overtopping rate over the splash wall onto dunes. Please note that it might be less than the actual overtopping rate but the effective overtopping determines the erosive force which cause structural damage

Next Steps Run flood propagation model for overtopping volumes. Mapping of risks/damages as a result of flooding and overtopping. Compare results with findings from other studies (RASP, Foresight etc)

Key lessons learnt Difficult to link overtopping with beach profile: large number of beach variables. Large number of modelling runs required to simulate scenarios in order to generate comprehensive look-up table. Flood areas and economic damages are primarily influenced by breach occurrences. Very sensitive to overtopping limit selected. Majority of economic damages concentrated in limited number of flood reservoirs. Assumes the sediment supply continues as per the existing source.