Draft Lighting Policy Ted Swansegar 502-564-3020 Cell: 502-330-5653.

Slides:



Advertisements
Similar presentations
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Regulatory Signs.
Advertisements

Office of Traffic, Safety, and Operations Application Guidelines Regulatory Signs Signing Plan Design (At-Grade) June 20, 2012.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Guide Signing.
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Installation of Loops on resurfacing projects through maintenance Ted Swansegar
Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
February 26, 2015 | Fredericksburg, VA Work Zone Safety
SCHOOL BUS TRAFFIC CONTROL DEVICES
SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
“ Pavement markings can enhance safety since centerlines have been shown to cut crash frequency by 29% compared to roads without them ” Wisconsin Transportation.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Florida Department of Transportation, November 2009
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
Freeway Signing Plan Design April 29, 2008
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
Lec 25, Ch.7, pp : Intersection types and design principles (Objectives) Become familiar with the typical intersection types (See figures 7-1 thorugh.
Incorporating Safety into the Highway Design Process.
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Chapter 2 Signs, Signals, and Roadway Markings
Module 13: Highway-Rail Grade Crossings (HRGC)
I n t e g r a t I n g C S S Practitioner Module 5 1 Module 5: CSS and Livability in Project Development.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
2002 AASHTO ROADSIDE DESIGN GUIDE A CONCISE OVERVIEW.
Rules and Regulations for Safe Driving
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
October 1, 2014 David Rush Work Zone Safety Program Manager, Traffic Engineering Division 2014 Work Zone Safety Team Reviews.
Old Policy – which no one ever seem to have heard of.
“ROUNDABOUTS FIRST” POLICY IN NEW YORK STATE What is it and how did it get developed?
Interchange Design Wes Mayberry Transportation Engineering Intern
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Vegetation Control For Safety Russ Johnson – Maintenance Supervisor - WSDOT Don Petersen – Safety/Design Engineer - FHWA.
Roadway Lighting on TxDOT Right of Way Greg Jones, EIT Master Electrician, State of Texas TxDOT, Traffic Operations Division, Illumination Branch.
Roundabout Study and Design EDSM Revisions
Traffic Control Devices, Traffic Laws, Signs, Signals and Markings.
Traffic Barrier Guidelines Section 3.0 Potential Roadside Obstacles Hands-On Workshop III July
1 At-Grade Intersection Design. 2 Objectives Define general intersection design objectives Describe factors that influence curb return design For a nice.
Access Management: South Carolina’s Experience Rick Werts Director of Traffic Engineering South Carolina Department of Transportation.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
By Tanya Bankston.  Current Version of the manual was prepared by Neel-Schaffer in 2002  The Traffic Signal Manual is currently being updated by DOTD.
SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.
Unsignalized Intersections Safety at Unsignalized Intersections.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Office of Traffic, Safety, and Operations 1 Signing by Type of Interchange –Figures 2E-25 through 2E-30 show applications of guide signs for common types.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Safety Concerns on Low Volume Roads Towns & Township Meeting December 2015 By Cliff Reuer Technical Assistance Provider SDLTAP.
REVIEW OF THE PROPOSED SIGNIFICENT REVISIONS TO THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL Fall 2014 Virginia ATSSA Chapter Meeting October 1, 2014.
Office of Traffic, Safety, and Operations Warning Signs Freeway Signing Plan Design April 29, 2008.
Entrances (PE – 300) PRIVATE ENTRANCE - An entrance that serves a single-family residence, farm or other noncommercial or non-industrial property as determined.
MnDOT Intelligent Transportation Systems Project Management Design Course Section 6: Discussion.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
At-Grade Intersection Design
Chapter 6: Intersections
1 Intersection Design CE 453 Lecture Intersections More complicated area for drivers Main function is to provide for change of direction Source.
Work Zone Safety Virginia Work Area Protection Manual International Municipal Signal Association March 8, 2016 Paul Kelley & Ginger Quinn WZ Safety Coordinators.
MISSOULA SCHOOL ZONE SPEED LIMITS PUBLIC WORKS COMMITTEE NOVEMBER, 9, 2011.
PROJECT DEATH Stephanie Rich. Corrective Work Punch List Punch List Work Complete Date Work Complete Date Request Final(s) Request Final(s) Comprehensive.
Intersections.
MD 30 (Hanover Pike) at Mt. Gilead Road
Technical Committee on Geometric Design
Example of cones and signs as traffic control at a roadway incident.
Presentation transcript:

Draft Lighting Policy Ted Swansegar Cell:

Lighting- General Section (TO-701-1) Most of the Lighting Guidance comes from the following References: AASHTO Roadway Lighting Design Guide “American Association of State Highway and Transportation Officials” IESNA Recommended Practice for Roadway Lighting Publication RP-8 ALL Lighting layouts for Construction should follow the recommendations in the manuals stated above!!!!!

Lighting- Responsibilities (TO-701-2) Changed Cabinet Responsibilities – Roundabouts (NEW) – Rest Areas and Weigh Stations (New) – The cabinet may enter into agreements with local governments or electric utility companies for any or all of these responsibilities. – Relocation of existing municipally-owned lighting for roadway projects along state-maintained roadways. Design work by Utilities or cabinet – May design and install bases, conduits, and junction boxes for future lighting by others on roadway projects. – Unwarranted lighting (excluding decorative fixtures) can be installed on a roadway project if the following: Project team supports installation Project funds are available Local officials sign an agreement to maintain(utility costs)

Lighting Responsibilities (TO-701-2) Responsibilities of others (the cabinet shall not be responsible for the design, installation, operation(utility costs), or maintenance of the following: – Aesthetic – Decorative – Delineation – Not listed in cabinet responsibilities Utility owned: relocation costs and design shall be responsibility of the Utility Company

Lighting Warrants and Approval (TO / TO-701-4) Warrants (these may influence the decision to approve) – roadway geometry, sight distance, crash rates, fog/ice/snow, and funding Lighting for the cabinet is approved by the Division Lighting for others is also approved by the Division with exception of delineation lighting (District Approval). Lighting by others shall go through the Encroachment Permit process and the permit shall serve as the approval of the lighting.

Project Development Process There are 8 steps in this process. – District Design Project Manager notifies the District/Central Office of meeting that may involve lighting – Go to Meetings (PLEASE GO TO THESE IF POSSIBLE!!!!) – Evaluation of if lighting is needed/replaced by the whole project team (make decision hopefully that is backup by comprehensive study) – If lighting recommended by Project Team, the District Traffic Engineer shall send in a written request to Central Office for approval. All data shall be submitted for this approval. If the project team wants Central Office to do the design, this shall also be requested in the written request to Central Office. – Review by Central Office and a decision will be send back the district if approved or not. – Project Manager/consultant notifies Design Services Branch as soon as possible for located poles/bases if there may be problems with utilities/right- a-way. – Completion of plans (district review if possible) – Final plans for Construction Letting!!!!!

Lighting- Plan Development (TO-701-5) Please Read!!!!!! We do not install decorative lighting

Lighting- Inspections (TO-701-6) Design Services will inspect all lighting on construction and permit projects. Inspections/letters will be completed within 90 days of notification!!!

Lighting- Permitted Installations (TO ) All lighting done by others All lighting shall be designed by Prequalified Consultant. All lighting submittal shall include Permitted Lighting Submittal Checklist (Exhibit 26). Typical Submittals may include the following: – Pole base design, poles (breakaway), luminaires, arms, banner/flag brackets, electrical disconnects All lighting shall be installed by Prequalified Contractor (except for utility installations). Central Office will inspect all permits that involve Lighting.

Lighting- Interchange Lighting (T0-702) New warrant for Partial Interchange Lighting – Average Daily Mainline (Urban- 25,000 rural- 10,000) – Average Daily crossroads- 1,000 Design Layout for Partial Interchange includes: – Within limits of the intersection with ramps and crossroads. – If intersections are less then 1000 feet, there shall be continuous lighting between the intersections. – May include end of lane taper where the on-ramp and mainline merge.

Lighting- Intersection (TO-703) Coverage Area: – Full Intersection (Signalized)- Both approach and limits of intersection. – Partial Intersection (Unsignalized)- limits of the intersection. – If two lighted intersection is less than 1000 feet, continuous lighting is warranted. Illuminance Levels (NEW) : – Limits of intersection- includes area within all stop bars in the intersection. – Average maintained illuminance (AMI) for both mainline and crossroad (limits of intersection will be greater of the two and then multiply by a factor of 1.3 to get AMI). – Approach lighting- AMI for each approach – Approach should be about 400 feet in advance of the limits of the intersection. – Approach lighting is only for roadway that is approaching the limits of the intersection.

Lighting- Delineation (TO-704) Only through a encroachment permit!!! Shall not be installed on Existing Traffic Signal Poles. Design: – Existing Utility poles in clear zone – Breakaway supports within the clear zone – Supports outside of the clear zone – Luminaire should be mounted at least five feet from the shoulder of the mainline approach, intersection radius, and side street approach. – Luminaire should be mounted no further 15 feet from the shoulder of the mainline/approach. – luminaire wattage shall be 200/250 and be mounted a minimum of 35 feet above the roadway. – Luminaire shall be mounted either parallel to the mainline or diagonal to the intersection.

Lighting- Roundabout (TO-705) All roundabouts shall have lighting!!!! Coverage area- full intersection lighting Illuminance levels: – Same as full intersection lighting – Limits of the roundabout is defined as the area encompassed by the circular roadway within the yield lines on each approach.

Lighting- Bridge (TO-707) Minimize Vibration- minimize arm lengths and incorporate a dampening device. All poles of bridges shall have a grounding system installed.

Lighting- tunnel (TO-707) Warrants – Nighttime- If luminaires positioned adjacent to tunnel cannot provide adequate lighting. – Daytime- if user visibility requirements are not satisfied by the sunlight.

Lighting- Underpass (TO-707) Warrants: – Frequent nighttime pedestrian traffic – Unusual or critical roadway geometry

Lighting- Navigation/Aviation (TO- 708/709) Maintenance- conduct periodic inspections and keep records of inspections in KEPT. Example navigation inspections: exhibit 27

Lighting- Weigh Station/Rest Area Is warranted and should be maintained by the District.

Questions!!!!