© 2011 Underwriters Laboratories Inc. Quality and Reliability of PV Power Plants Peeyush Gupta Director – Sales & Marketing UL India Pvt Ltd.

Slides:



Advertisements
Similar presentations
PhotoVoltaic System Sizing © ARJ This is not a How-To presentation. It is a What and Why presentation.
Advertisements

KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
Dr. Bader Eddin Al-Majali
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
CPUC CSI Workshop CPUC CSI Stakeholder Workshop San Francisco, CA February 15, 2012.
Intersolar India Conference November 11 th, 2013 FROM NSM TO GRID PARITY MODELS: FEED-BACK FROM EXPERIENCE.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Solar Energy Florida Electric Cooperatives Association 2014 Finance & Accounting Conference Glenn Spurlock September 17, 2014.
Standardization in the Green Buildings field Overall energy performance of buildings Dick (H.A.L.) van Dijk, Senior Scientist at Netherlands Organisation.
The Need for an Energy Grid in the Maldives
Module 7/7: Indian Solar Market potential. Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing Solar.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Process Engineer’s Role in Project Management Dr Abdullah Malik.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Introduction Vikram Group: Founded in 1974 A diversified company with interests in Engineering, Machinery Manufacturing, Textiles, and Solar Energy Purchasing,
Photovoltaics. Agenda What is PV? System Types Mounting Options Product Options System cost & performance System sizing considerations Advantages of PV.
ORECA Director Education Conference June 2, 2015 Jeff Beaman, Member Services Director Central Electric Cooperative The Road to Community Solar.
Brian Ross, Principal, CR Planning, Inc. Local Best Practices for Solar: Planning, Zoning, Permitting 1 Solar Minnesota November 26, 2012.
Solar Project Performance Assessment
1 Rudolph/Libbe Solar. 2 Our Perspective on Solar in Ohio  Ohio has the foundation for rapid solar growth (distributed generation) – Existing electrical.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
Economy Specific Research and Introduction of Successful Results of New / Renewable Energy Technology Development and Demonstration Toru Usami International.
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan
Solar System Life Maintenance Call in number: Meeting number: * * August 3, 2009.
SMA Solar Technology AG September 2013 Technical benefits of String Inverter Technology Mark Ryder.
Diagnostics of photovoltaic power plants operation
Photovoltaic Systems – Residential Scale Part 2 April 2, 2014.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Designing Solar PV Systems ( Utility Scale). Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Photovoltaic Systems – Residential Scale Part 1 March 17, 2014.
1 Presented by: Refex Energy Limited. SWITCH ON THE SUN.
Diagnostics of photovoltaic power plants operation Vitezslav Benda, CTU Prague, Faculty of Electrical Engineering.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Reduce Your Operating Expenses, Increase Your Profits a Story of Energy Efficiency.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
EQ Conference Mumbai 22nd Feb 2017 Anjan Ghosh – Ujaas Energy
Steve Griffith February 28th, 2017
“WE EMPOWER A GRAIN OF SAND TO CAPTURE THE POWER OF SUN”
ROOFTOP SOLAR PHOTOVOLTAIC SYSTEM
Axis Renováveis November 2016 STRICTLY PRIVATE AND CONFIDENTIAL.
Uniper Energy Services
12 good reasons to buy an ABB TrafoStar™ transformer
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
Growth of Renewable Energy in India
Single Axis Tracking.
RELIABILITY EVALUATION OF GRID CONNECTED PV SYSTEM
Photovoltaic Systems Engineering Session 19
How to Design and Implement a Reliable PV System which could last 30+ years ZAKI IQBAL SENIOR R&D ENGINEER RAK RESEARCH AND INNOVATION CENTER.
PV System Quality and Performance
Photovoltaic Systems Engineering Session 26
SALES: HOW TO USE THIS PRESENTATION
ABB SACE Maintenance Preventive Maintenance Program
Development of Solar PV Projects on Brownfields
Across the entire value chain
Photovoltaic Systems Engineering Session 12
Case Studies on Field Deployment of PV Battery Storage Systems
Solar Energy Commercialization Session 16
PSS verification and validation
Detail | Customise | Optimise
Solar Energy Commercialization Utility Scale Solar Development
Photovoltaic Systems Engineering Session 22
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

© 2011 Underwriters Laboratories Inc. Quality and Reliability of PV Power Plants Peeyush Gupta Director – Sales & Marketing UL India Pvt Ltd

SPV – heralding a new future in Sustainability 2 With abundant solar cover in India, the potential of Energy Self-reliance is immense SPV is roughly 1% of India’s Installed energy capacity of 200GW – but the potential is much higher. Phase – 2 of JNNSM vital to meet RE targets With 16-18% T&D losses, insufficient Grid connectivity and high cost of land acquisition, Off Grid PV could be the answer to the energy deficit – but poses fresh challenges in safety and reliability.

Trends and studies in the PV industry 3 Policy incentives fuelled 33GW of capacity expansion in Cost of power fast approaching Grid- parity levels. Module prices dropped by over 56% since 2011, drop continues. Maximizing cell efficiency and system yield are priority areas of technology. Safety, Quality and reliability concerns rising:  Fire and Electrical shock concerns, particularly in Roof-Top systems  Overall efficiency of PV systems.  Module performance and degradation  Bankability of PV systems : guaranteed returns over the entire lifetime of the system. Cables, connectors, and Junction Boxes highly prone to failure. Urgent need to create confidence in market on long-term viability of the technology.

Performance of PV Power Plants 4 Factors Contributing to Performance  Site Selection  Choice of Technology  Plant Design  Quality of Equipment  Installation Practices  Operation and Maintenance CUF based on plant data from Gujarat (January to April 2012) JNNSM – Phase1 Batch 1 – 20 X 5 MW = 100 MW Highest CUF – 26.67% Highest Net Exported Power – 987,731 KWh Lowest CUF – 17.88% Lowest Net Exported Power – 659,600 KWh US study on average Module degradation per year

PV System Value Chain 5 Project Proposal Financing / Equity Design of System Engineering Procurement and Construction Final Inspection, Commissio ning Operation and Maintenance Detailed Project Report Site assessment and Yield Modules Inverters BoS (Cables, structures etc..) Site Lease / purchase Financial Assessment of DPR. Return on Capital Investment Lower P&M costs System design Sourcing of components Installation and commissioning Quality checks on installation. Grid connectivity Distribution, storage Condition Monitoring Ensuring plant performance at optimum levels

Quality through Design 6 Planning and Engineering  Site Assessment  Assessment of Environmental Conditions  PV plant layout and calculation of shade  Assessment of module technology options  Review of Technology Selection Criteria  Electrical cabling  Civil structures  Control and instrumentation  Power evacuation  Review of conceptual plant design(s) and technical description / specification of components  Energy yield estimate  Monitoring & Control  Project financial model appraisal  ‘IEC62446 : Requirements for system documentation, Commissioning Tests and Inspections’ can be used as a guideline Modeling techniques used to predict plant performance Quality & Monitoring Vs. Failure Rate

Quality of System Components 7 PV Module – Fire safety and performance  Intended performance of cells and PV panels, Hot spot, performance in harsh environment conditions.  Module tests as per IEC61215, IEC 61730, UL1703, IEC61646, IEC61701, PV Inverter – Performance Issues  Efficiency, Failure of Components  Central Inverter Vs String Inverters  Inverter tests as per IEC61683, UL1741, IEC60068, IEC and EN BoS – Quality and Reliability  Flammability, corrosion and ingress protection, prevention of electrical shock and protection of faults  Combiner box as per UL 50, UL50E, IEC  Circuit Breakers type tests as per UL/IEC 60947, EN50521  Cables as per IEC60189, UL  Counterfeit products – how do we safeguard ourselves?

Commissioning and Post Commissioning Checks 8 Reliability of PV modules  Accelerated stress tests to determine MTTF in actual use.  Performance of PV modules at High Temperatures and low irradiance as per IEC  Potential Induced Degradation (PID tests)  Reliability vs. Durability vs. Failure Commissioning Checks  As per IEC62446 for Grid Connected systems  IEC62124 for Design verification of stand- alone PV power plants.  Installation checks as per local electricity codes; training of installers. Post Commissioning  Periodic Verification of Power Plant Performance Ratio (PR).  Condition Monitoring and System Checks.  On-Site PIV measurements

Performance of PV Installations 9

Major Safety Issues 10 A robust mechanism of component type testing and installer training is required to ensure operator and consumer safety Roof top systems pose an immense challenge in terms of consumer safety – primarily fire and shock.

Ensuring Quality and Reliability of PV systems Verification of Design, Sourcing  Detailed Project Report  Bid Evaluation  Review of Vendor drawing- post E P C Award  Monitoring & Supervision of activities during Erection & Commissioning  Quality Inspections Verification of Solar Installation and Performance  Energy Yield Estimation and comparison with that of E P C  Design Specification and documentation Vetting  Installation Process  Post Installation process 11 An Independent verification by a 3rd party provides higher confidence to the project developers and financial community that the PV Power Plant is designed, built and commissioned according to internationally accepted standards and meet the requirement of local electric codes.

Summary and Next steps 12 The importance of Solar Energy to meet the energy needs of India is unquestionable. The PV eco-system is a complex one with several stakeholders – its critical to involve all stakeholders to ensure Quality. At the policy level, standards / regulations are necessary to ensure Quality and Reliability and to bring confidence into this technology. Independent verification of contracts and installations can ensure quality. Failure Analysis including maintaining a central database. Adapting standards to real-time field conditions. Development of a ‘Reliability Scorecard’ for the PV systems installed. High Quality, Safe and Reliable Solar Systems… Need of the Hour

THANK YOU. energy