Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.

Slides:



Advertisements
Similar presentations
UNIT 31 HOME ELECTRICAL SYSTEM
Advertisements

Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September , 2011 | Hyatt.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
EE4503 Electrical Systems Design
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
Landon Roberts Lighting/Electrical Option 11/01/07 Medical Education Building Johns Hopkins University School of Medicine Electrical Systems Existing Conditions.
Master Examination Practice Drill # Ted “Smitty” Smith.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
DAY 4 CHAPTER 3 CONDUCTOR SIZES,TYPES, ETC.. Continuous Load. A load where the maximum current is expected to continue for 3 hours or more. Continuous.
Assumption University Thailand EE4503 Electrical Systems Design Introduction 1.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Electrical Wiring Residential
EET Survey of Electronics
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Electrical Power Systems
Distributed Power Systems ELCT 908
CONSTRUCTION BLUEPRINT READING
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
Transmission Lines …….. Conductor Material
ESS | Power System | | Frithiof Jensen ESS Power System Ion Source, Front-end.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
Residential Construction Unit 5- Energy Efficiencies and Mechanicals Mr. Todzia.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
SWEDE - April 26 th, Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.
APPLIED ELECTRICITY SS3
Electrical & High Temperature Utility Distribution Upgrade.
Two Minute Drill #9 Copyright 2005 Ted "Smitty" Smith.
COMMERCIAL ELECTRICAL (Chapter 11)
Cable Rehabilitation Program By Lee Maurer Maintenance Planning SWEDE Conference April 26, Bastrop, Tx (Second Responder Cable Treatment Program)
Objectives Finish residential electrical systems Solve some example Compare electrical systems for residential and commercial building.
Electricity By: Mr. Brock. Electrical Safety 1) Always disconnect the circuit to be worked on before anything else and lock the cover to the SEP when.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Consumer’s Main Switchroom & Main L.V. Switchboard
Utility Engineers, PC.  Generation  Transmission  Distribution.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Distribution Systems-General
SERVICE ENTRANCE EQUIPMENT
Starting Residential Wiring.  The most important element in wiring. Safety is proper grounding.  Grounding is the connection of all parts of a wiring.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
Electric Wiring Conductor A material that allows electricity to move readily and offers low resistance Example: copper, aluminum and water.
ELECTRICAL INSTRUMENTS ( service and utilization )
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
URBAN DESIGN Non-standard (Alternative) and Aesthetic Liafis A Ogboye, P.E.
Module 11 -Cost Estimation This module covers how to estimate project costs including: –Equipment costs – combination of procurement and installation (including.
POWER DISTRIBUTION & POWER LOSS REDUCTION METHODS
RESIDENTIAL ELECTRICAL SERVICE
License Examination Practice Drill
2011 Changes Two Minute Drill
Smitty’s Two Minute Drill Mixed Content -05
Basics of electrical engineering
Private Septic Systems
Design of Electric Power Systems and Utilities
Ampacity Calculations and Overcurrent Protection 1
Installation And Estimation of Service Connection
Engineering Project Cable Management.
Private Septic Systems
Two Minute Drill: Raceways and Boxes 2017
EET 323 – Electrical System Design Lecture 9: Grounding
The High Voltage Underground Cable Technician Inspector Training
EET 323 – Electrical System Design Lecture 6: Conductors and Over-Current Protection Radian Belu, PhD.
Smitty’s Two Minute Drill Grounding and Bonding
CHAPTER – 41 A.C. TRANSMISSION AND DISTRIBUTION
Varied Calculations Drill 2
Presentation transcript:

Major Underground Design John Perez

Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase ductbanks are 4” & 2” PVC conduits encased in 3 inches of concrete –Conduits are separated by 3 inches held in place with spacers (every 4’) –One 4/0 Copper bare Neutral per circuit feeder is placed above the spacers within concrete Ductbanks have 30” of cover in private property, 36” in public ROW and 48” of cover in substations Ductbanks are sized in the planning stage between Developers, Distribution Planning and Underground Engineering

Underground Engineering Design Practices –Ductbanks & Manholes (continued) Manholes are spaced approximately 350’-400’ and encased in flowable fill –Distances may vary depending on ductbank routing/ design –Typically manhole alignment allows the duct to entire on center of the corners (diamond) Manholes range from 5’x5’x6’ to12’x12’x12’ according to the ductbank size –Manholes are H20 rated and contain thin wall knockouts in the corners –12” diameter sump in the middle to allow for pumping

Underground Engineering Design Practices Color Coded Corner window Hooks/ Racks Circuit Tag Permanent Ladder Neutrals

Underground Engineering Design Practices –Design Philosophy Substations Ductbanks are typically 33-4” & 3-2” PVC conduits inside the station with 6-4” conduits between substation switchgear tie cubicles –Provides Cooling conduits, Circuit reroutes and new feeder circuits –750 kCM, Copper, EPR conductors are used for circuit exits (both 15 kV & 35 kV circuits) Dips Installed to avoid overhead conflicts, customer requested jobs, underground conversion areas Circuit Dips when feasible contain an “Express Feeder” –Express feeders are fed directly between overhead “P-Switches” and do not feed any padmount equipment –Circuits dips are fed with 750 kCM, Copper, EPR conductors (both 15 kV & 35 kV circuits) –Separate Risers feed customer loads –Avoids prolonged outages (SADI, SAFI) due to Padmount Switchgear replacements/ failures Loop Feeds CPS Energy padmount transformers are fed between: Risers; Riser to Padmount Switchgears; and Padmount Switchgear Padmount Switchgears are fed from a solid blade “P Switch” with 4/0 AWG Copper EPR conductors or greater Padmount transformers are typically fed with bundled #2 AWG Aluminum XLPE 15 kV or 1/0 AWG EPR Aluminum 35 kV conductors Padmount transformer usually have three 4” PVC conduits in the slab Loop connected kVA are a maximum of 2,500 kVA and 6,000 kVA for 15 kV primary and 35 kV primary respectively, with open points at the load midpoint

Underground Engineering Design Practices Loop Feeds (continued) When designs require manholes and/or padmount switchgears, the transformers are fed from manholes only –To allow future expansion with minimal disruption transformers are looped through manholes

Underground Engineering Design Practices –Job Sketches 1-lines are created for 3 or more transformers and kept on the server –Dashed lines indicate planned infrastructure/ cable installation –Solid lines indicate in the field conditions –Open points, circuit numbers, footages and size/number of conduits on the drawing MicroStation sketches are required for detailed drawings –Padmount details showing rebar layouts, conduit locations –Manhole/ ring & cover apron specifications –Ductbank requirements and routing –Cable pulling schedule –Manhole cable routing GIS also logs detailed information –Circuit conductivity & general placement of facilities –Circuit number, facilities information, open points, etc

Underground Engineering Design Practices 1-line example

Underground Engineering Design Practices