Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.

Slides:



Advertisements
Similar presentations
Chapter 12 Transformers. Chapter 12 Transformers.
Advertisements

Announcements Be reading Chapters 9 and 10 HW 8 is due now.
Sistan & Balouchestan Electric Power Distribution Company
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
Announcements Be reading Chapter 6. HW 3 is due now.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
ECE 333 Renewable Energy Systems Lecture 13: Per Unit, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
Announcements Be reading Chapter 3
Lecture 8 Transmission Lines, Transformers, Per Unit Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Distributed Power Systems ELCT 908
Plant Utility System (TKK-2210)
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
Lecture 5 Power System Operation, Transmission Lines Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
APPLIED ELECTRICITY SS3
4/22/2017 WHAT IS THERMOGRAPHY?
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Transformer Taking the ratio of the two equations
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Announcements For lectures 8 to 10 please be reading Chapter 3
Announcements Please read Chapter 3 H4 is 4.34, 4.41, 5.2, 5.7, 5.16
© ABB PTMV - 1, ABB Overhead Distribution Systems.
Lecture 6 Development of Transmission Line Models Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Announcements Please read Chapter 3; start on Chapter 6
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
Announcements Homework #4 is due now Homework 5 is due on Oct 4
1 Distribution Networks For Large Cities: EPRI Research on Modelling and Analysis Roger DUGAN Sr. Technical Executive Electric Power Research Inst. US.
Lecture 18 Fault Analysis Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
Announcements For lectures 9 and 10 please be reading Chapter 3
Utility Engineers, PC.  Generation  Transmission  Distribution.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
POWER HOUSE.
Distribution Systems-General
SERVICE ENTRANCE EQUIPMENT
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Submitted To:- Submitted By:- Mr.
ECE498HZ: Power Distribution System Analysis
ECE 498HZ: Power Distribution System Analysis
ELECTRICAL INSTRUMENTS ( service and utilization )
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
AUTOMATIC CIRCUIT RECLOSER
ET 332b Ac Motors, Generators and Power Systems 1 Lesson 11_et332b.pptx.
Auto Transformer Current Flow. Principles of Auto Transformers H X H0/X0.
Sub Station.
SUB-STATIONS.
ECE 476 POWER SYSTEM ANALYSIS
Chapter # 25 Sub-Stations risemark.pbworks.com.
Management Of Tulkarm Electrical Network
Power Generation and Distribution
35kV Assessment SWEDE 2007 May 10, 2007.
Distribution Feeder Voltage Regulation and Control
Basics of electrical engineering
Design of Electric Power Systems and Utilities
Lesson 11: Transformer Name Plate Data and Connections
Why does power factor matter Make-up of distribution capacitor banks
EET 323 – Electrical System Design Lecture 9: Grounding
Review of Distribution Network Protection
Ahmed Kulab Moh. Abed Foaad Al-Habeel
ECE 476 POWER SYSTEM ANALYSIS
Presentation transcript:

Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS

1 Announcements Be reading Chapter 14 Last homework is 12.3, 12.11, Needs to be done before the final, but not graded. Final exam is as given on the UIUC website. That is, Tuesday Dec 13 from 7 to 10pm here (218 Ceramics). Final is comprehensive, with more emphasis on material since exam 2. Three note sheets allowed (e.g., ones from previous two exams and one new note sheet)

2 Electricity Delivery Generation: MVA, up to 20kV Transmission: 230kV up to 765kV Can include: HVDC, ac-dc links Subtransmission: kV Can include: taps for large single customer Primary distribution substations: MVA, kV Can include: LTC, capacitor banks, reclosers Distribution feeders: 4.16kV up to 34.5kV Secondary distribution: kVA, V Meters

3 Electricity Delivery

4

5 Primary Distribution 15kV class, 4 wire multigrounded is most common

6 Primary Distribution Includes everything from the distribution substation to the distribution transformers Rural areas served by overhead lines Urban areas served by underground systems 3 common topologies 1. Radial 2. Loop 3. Network

7 Primary Radial Systems

8 Three phase feeder mains of length 1 to 30 miles Single phase laterals branch off main feeder Try to balance the load on the 3 phases Economical and widely used in low load density areas Reclosers are used on overhead lines to minimize loss of load Typically have 3 shots before lockout Sectionalizing fuses also reduce downtime

9 Primary Radial Systems Recloser:Remote operation switch: Source:

10 Primary Radial Systems Capacitor banks: Reduce voltage drop Reduce losses Improve power factor Are often switched off at night Source:

11 Primary Radial Systems Primary selective systems can be used as backup for critical loads such as hospitals

12 Primary Loop Systems

13 Primary Loop Systems Used where higher service reliability is required Generally more expensive than radial systems Feeder conductors are sized to feed entire loop Loop systems can be used in underground residential distribution (URD), where faults are infrequent but are usually permanent

14 Primary Network Systems

15 Primary Network Systems Very rare, found only in downtown areas of large cities Similar operating challenges as the transmission network (eg voltage regulation)

16 Secondary Distribution Includes everything from the distribution transformer to the meters

17 Secondary Distribution

18 Secondary Distribution Distribution system must ensure customer voltage is within ANSI standards +/-5% ( V) Most problematic: Voltage of first customer under light load Voltage of last customer under peak load Load tap changers, voltage regulators, and shunt capacitors are used 4 types of secondary systems: Individual distribution transformer per customer Common secondary main Secondary network Spot network

19 Secondary Distribution

20 Individual Distribution Transformer The customer is directly connected to the primary feeder through a distribution transformer Commonly used for: Rural areas Large single customers Voltage problems with common secondary main

21 Common Secondary Main Several customers share a secondary main Takes advantage of the diversity of loads: A smaller transformer is required Sudden load changes (eg a large motor starting) will have less effect on voltage

22 Secondary Network High reliability Multiple primary feeders, each over-sized More than 260 cities in USA have secondary networks Requires comprehensive protection using relays, fuses, network protectors 208Y/120 or 480Y/277V

23 Spot Network Used for single, concentrated load (eg high rise, mall) Usually 480Y/277V High reliability

24 Distribution Substation Transformers

25 Distribution Substation Transformers Emergency loading: 2 hour emergency rating (eg 170%) which gives time to perform switching to alleviate loading 10 or 30 day emergency rating (eg 155%) which gives time to perform maintenance

26 Distribution Substation Transformers Construction: Contain mineral oil for insulation and cooling Sealed and internal pressure is monitored Can have LTC and voltage regulator Ratings: OA: passive cooling FA: active cooling with fans only FOA: active cooling with fans and oil circulation pump Nameplate transformer impedance usually given in % using OA rating as the MVA base

27 Distribution Substation Transformers Three phase 22.9kV Δ / 4.16kV Y, 12MVA OA, 16MVA FA1, 20MVA FA2, LTC on LV side

28 Example 14.2 A distribution substation is served by two transmission lines, each connected to a 40MVA (FOA) transformer. The utility that owns the substation uses the following loading criteria: 128% for normal loading 170% for 2 hour emergency 155% for 30 day emergency 1. What is the normal rating of substation 2. What is the 2 hour emergency rating under single- contingency loss of a transformer (n-1) 3. What is the 30 day emergency rating for n-1

29 Example What is the normal rating of substation 1.28 * (40+40) = 102.4MVA 2. What is the 2 hour emergency rating under single- contingency loss of a transformer (n-1) 1.7 * 40 = 68MVA 3. What is the 30-day emergency rating for n * 40 = 62MVA

30 Distribution Transformers Convert the primary distribution voltage (2.4 to 46kV) to secondary distribution voltage (<480V) Location: pole mounted, pad mounted, inside buildings, or underground

31 Pole Mounted Transformers Liquid filled, 1 or 3 phase Small (eg 25kVA) Different levels of protection, as required (eg fuse cutout, surge arrester, circuit breakers) Typically the protection is attached to the outside of the transformer Source:

32 Pad Mounted Transformers Used for underground distribution Liquid filled or dry- type, 1 or 3 phase Medium sized (eg 225kVA) Source:

33 Network Transformers Located in vaults, supplies power to secondary networks or spot networks Liquid filled, 3 phase Large ( kVA) Source: Images/Network%20Transformer%20%28Vault%20Type%20Crop%.jpg

34 Distribution Transformers Like distribution substation transformers, distribution transformers can also be overloaded

35 Shunt Capacitors in Distribution Supply reactive power to inductive loads, thus reducing line losses and improving voltage Placement is important: If only 1 load, place cap bank at load Cap banks placed at distribution substations only reduce I 2 R losses and voltage drops in transmission, not distribution Common to use 2/3 rule: place 2/3 of the required reactive power 2/3 down the feeder A combination of fixed and switched cap banks are used

36 Example 14.3 X LOAD =40Ω, R LOAD =20Ω, X C =40Ω

37 Example 14.3 Impedance seen by source without cap bank Impedance seen by source with cap bank

38 Problem 14.15

39 Distribution Software Many vendors

40 Distribution Software Functions: Analysis: faults, contingencies, reliability, harmonics, losses Optimization of cap placement, conductor size, switching, transformer size, voltage Operations (DSM, PF correction, voltage, relay coordination) Visualization Outage management

41 Distribution Reliability Goal: 1 interruption, max 2 hours in 1 year Reliability indices:

42 Distribution Reliability Momentary interruptions not included Prolonged interruptions (eg storm) treated differently Typical values SAIFI: 1.1 interruptions/year SAIDI: 90 minutes/year CAIDI: 76 minutes/year ASAI: % Utilities may be obligated to or may voluntarily report indices to state commissions Reports help identify weakest links, trends