TH 100 Visual Quality Advisory Process VQAC Meeting One 6 December 2012.

Slides:



Advertisements
Similar presentations
* 07/16/96 Guide Sign Design June 18-19, 2013 Arden Hills, MN *
Advertisements

1 Incorporating Extreme Weather Risks in Asset Management Planning Lynn Clarkowski.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Highway 76 Complete Streets Project Study Session February 7, 2013.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012.
Public Visioning Meeting January 28 & 29, 2015 CenterPlace Regional Event Center.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Dec. 17, 2014|3:00PM -5:00PM | ROOM 1E-113.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Newport South Beach Peninsula Refinement Plan. Newport South Beach Peninsula Located on the south side of the mouth of the Yaquina Bay and the crossing.
Cathedral Area Historic District Project Breaking A 50-Year Impasse:
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
PROJECT KICK-OFF Jason Collins, Ph.D., P.E., AICP October 14, 2008.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Office of Traffic, Safety and Technology Guide Sign Design June 17-18, 2015 Arden Hills, MN.
I n t e g r a t I n g C S S Practitioner Module 2 1 Module 2: Building the Case for Change.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
DATS Bicycle Planning 2009 Bicycle Advisory Committee Kickoff Danville Area Transportation Study July 13, 2009.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING March 18-3:00PM | ROOM 1E-113.
The purpose is to explore methods to improve the safety, capacity, and mobility of Falling Springs Boulevard, US 60, and adjoining roads.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
DR O.S ABIOLA DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA. CVE 505 HIGHWAY & TRANSPORTATION ENGINEERING I.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Jan. 21-3:00PM | ROOM 1E-113.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
The Great California Delta Trail Planning Process for Contra Costa and Solano Counties Technical Advisory Committee Meeting January 2010.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
City of Suwanee 2030 comprehensive plan. TODAY’S AGENDA Process Update Community Agenda Framework “Compass” Review  Images and Questions  Comp Plan.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Rantoul Street / 1A Reconstruction Project December 10, 2015.
State Route 268 Rutherford County, TN DESIGN PUBLIC MEETING June 2, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
ISLLC Standard #6 ISLLC Standard #6 Implementing Educational Policy Name Workshop Facilitator.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Task Force Meeting #1 August 5, 2010 Indian Mounds Regional Park Master Plan Saint Paul Department of Parks and Recreation.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Project Information Meeting / Open House Wednesday, September 17, :00 – 8:00 PM Agenda 6:00 to 6:30 View Project Displays 6:30 – Presentation and.
Tonight’s Agenda  Project Overview  Existing Parking Summary  Post-It Note Exercise & Discussion  Parking Management Toolbox  Small Group Breakouts.
REDESIGNING THE APPROACH FOR ECONOMIC RENEWAL MACKENZIE COUNTY BYRON PETERS.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
RTD Board Update October 8, 2013 US 36 Bus Rapid Transit.
Four Winds Condominium Association August 2, 2017
Hesperian Boulevard Corridor Improvement Project San Lorenzo
The Oakton Condominium Association September 12, 2017
Public Workshop #1 August 18, 2010.
Developing Thinking Thinking Skills for 21st century learners
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Highway 169 Bridge Replacement & Pavement Resurfacing
Sarno Road Corridor Study
Design Criteria CTC 440.
Presentation transcript:

TH 100 Visual Quality Advisory Process VQAC Meeting One 6 December 2012

Project introduction Participants MnDOT and city staff Community representatives Consulting landscape architects

Project introduction Tonight’s meeting Meeting focus: Context and conceptual vision Project overview Visual quality process for TH 100 TH 100 visual quality Guiding visual quality Summary

Project area – TH 100 between 36 th Street and 25-½ Street Schedule for design and construction – Construction start in Fall 2014 – Construction complete in late 2016 Project purpose – The improvements will provide motorists with ah more efficient, smoother, and safer ride. Project overview Scope and schedule

Improvements – Reconstruct TH 7 and CR 5 (Minnetonka Boulevard) interchanges including replacement of bridges – Reconstruct roadway pavement (12 foot lanes) – Improve safety and efficiency through ramp modifications and addition of acceleration lanes – Replace two railroad bridges – Replace concrete barrier – Improve drainage – Install noise walls (if elected by noise barrier beneficiaries) Project overview Scope and schedule

Generate ideas for establishing the visual character of the corridor through dialog with the community Produce a Visual Quality Manual that guides the design of visual quality elements Define key concepts and directions for visual quality that may be used in the final design of constructed elements Project overview Purpose

Composition – neighbors from each side of the corridor – major institutions – representatives of city commissions – city and county staff representatives Roles and Responsibilities – consistency in participation – representative of a constituency – committed to a visual quality dialog – engaged, not spectating Process – seven VQAC workshops – one open house Project overview Visual Quality Advisory Committee

Conceptual vision Corridor influences Visual quality elements Visual Quality Manual Visual quality process for TH 100 Products

Responsive to place: the community and geographic contexts Responsive to people: neighbors and travelers Narrative and graphic reference point for design of visual quality elements Visual quality process for TH 100 Conceptual vision

Corridor continuity Existing and future roadway layouts Local requirements and guidance SWLRT and the HCCRA bridge Noise wall voting Other local influences Visual quality process for TH 100 Corridor influences

Conforms to MnDOT parameters and responds to local guidance Based on community, geographic, and demographic contexts Illustrated by precedent images and informative drawings with a supportive narrative Articulates design intent for visual quality elements Visual quality process for TH 100 Visual quality manual

Major mainline structures TH 100 visual quality Corridor components Bridges Retaining walls Noise barriers

TH 100 visual quality Corridor components Supporting elements Grading and ponding Signs Highway lighting Fencing Vegetation

TH 100 visual quality Corridor components Local features Exit ramps and local streets Pedestrian and bicycle facilities Streetscape on local streets Gateway elements Public art

Exercise One: Identity Exercise Two: Issues Exercise Three: Ideas Sharing directions Guiding visual quality Establishing a conceptual vision

What is the nature and character of St. Louis Park? Describe your community using single words or short phrases. Create a separate card for each description. You will have a chance to share your descriptions with VQAC members. Exercise One: Identity Guiding visual quality Establishing a conceptual vision

Based on thoughts articulated as a part of Exercise One, think about TH 100 in St. Louis Park. As a small group, list the five most significant visual quality issues from a traveler’s perspective. Again as a small group, list the five most significant visual quality issues from a neighbor’s perspective. Exercise Two: Issues Guiding visual quality Establishing a conceptual vision

How might the issues identified in Exercise Two be addressed? As a small group, brainstorm ideas that relate to concerns of travelers. Similarly, brainstorm ideas that relate to concerns of neighbors. Exercise Three: Ideas Guiding visual quality Establishing a conceptual vision

Spend a few minutes deciding on a few things that your group found to be most relevant, important, intriguing, or exciting. Pick a representative to share highlights of your small group discussion. Sharing directions Guiding visual quality Establishing a conceptual vision

Questions Upcoming VQAC meetings – First Thursday of the month – December 2012 through July 2013 – Evenings 6:00-8:00 – St. Louis Park City Hall Selection of Art Committee representative Other announcements Meeting summary Questions and next steps

Thank you! Meeting summary VQAC Meeting One

>> Additional information Project layout

Television Documentaries – Highway 100 “Lilac Way” City of St. Louis Park Planning Documents – Vision St. Louis Park – Minnetonka Boulevard Design Plan Additional information Planning references