US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.

Slides:



Advertisements
Similar presentations
ADA Requirements Well-designed sidewalks meet ADA requirements:
Advertisements

Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
By: Vanessa Victor Scott Yoshida Travis Hills Lucas Sprague.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Managing Time and Space Vehicle Positioning. USE ANY OF THESE VISUAL TECHNIQUES 1.IPDE 2.The Smith System 3.Zone Control.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
SCHOOL BUS STOPS OVERHEAD LIGHT and HAZARD LIGHT Effective July 21, 2004 Revised January 2007.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Traffic Engineering Survey City of Rancho Palos Verdes ALIGNMENT PARKING RESTRICTIONS NO. OF LANES AND MEDIAN IMPROVEMENTS (SW, C & G) FRONTING DEVELOPMENT.
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
Florida Department of Transportation, November 2009
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Cross Sections CE 453 Lecture 22 Iowa DOT Design Manual Chapter 3.
Safety Audit Components Safety assessment for risk Management.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Chapter 4. Your number one priority as a driver is to drive your vehicle carefully and safely. Your speed and manner of driving must create a safe environment.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Intersection Design Spring 2015.
Phase 2: 30% Design Plans September 4 th, 2012.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Signs Signals and Pavement Markings
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Pedestrian Design at Intersections Lesson 11 Publication No.
Traffic Engineering Survey City of Rancho Palos Verdes DISTANCE ALIGNMENT PARKING RESTRICTIONS STREET WIDTH NO. OF LANES AND MEDIAN IMPROVEMENTS (SW, C.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Driving Environments. Rural Driving  The speed limit on rural roads when not posted is 35 mph.  Many rural roads are two-lane, two-way roadways.  Curves.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Geometric Design: General Concept CE331 Transportation Engineering.
Traffic Engineering Survey City of Rancho Palos Verdes DISTANCE ALIGNMENT PARKING RESTRICTIONS STREET WIDTH NO. OF LANES AND MEDIAN IMPROVEMENTS (SW, C.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
At-Grade Intersection Design
Complete Streets Training
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Complete Streets Training Module 4b – Designing for All Users.
Intersection Design Spring 2017.
Interdisciplinary teams Existing or new roadway
District 3 Complete Streets Projects
From Channelization, Islands and Turning Roadways (p ~ p
COACT ODOT Update September 13, 2018.
SE 12th Street Roadway Improvements February 8, 2005.
Safety Audit Components
Traffic Study Presented by Keith Wenners, pe, ptoe
Walker Street Reconstruction Project 25% Design Public Hearing
Presentation transcript:

US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida

Hagstrom Road to Fourth Avenue  Rural section of road  ROW approximately 180’ and can accommodate sidewalks  Pedestrian crossing at Hagstrom not recommended due to limited visibility at curve in road, uncontrolled intersection and speeds exceeding 40 miles per hour (MPH)  Wide width commercial dirt driveway openings exist along corridor  No obstructions observed within proposed path of the sidewalk, however, potential conflicts may arise that can be resolved by field relocation of obstacle or the pathway.  No curb and gutter on west side of road, 7-1/2 foot paved shoulder  Curb and gutter south of Fourth Avenue on the east side of road ends at private drive (photos 4 & 6)  Steep slopes to adjacent open drainage ditches exist in some areas

Fourth Avenue to Second Avenue  ROW narrows to approximately 60 feet north of Fourth Avenue  Pedestrian crossings not recommended due to speeds exceeding 40 miles per hour (MPH) and uncontrolled intersections  Unmarked 5.5 foot bike lanes exist  No obstructions observed within proposed path of the sidewalk however, potential conflicts may arise that can be resolved by field relocation of obstacle or the pathway  Wide width concrete and dirt driveway openings exist along corridor  No curb and gutter on west side of ROW to just south of Third Avenue  One open drain crossing without railing, both sides of ROW between Fourth Avenue and Third Avenue  Sidewalk ramps and detectable warning surface exists at all four corners of Second Avenue  Yellow flashing light at intersection of Second Avenue  Existing sidewalk begins north of Second Avenue on both sides of the ROW

Washington Avenue to First Avenue  Existing detectable warning surface at end of sidewalk curb ramps at all intersections  No curb and gutter along this segment of the corridor  Approximately 10 feet of ROW on the east side from edge of pavement  Large and numerous driveway openings on east side; o approximately 52 foot first opening, o approximately 61 foot second opening, o and approximately 153 foot opening closest to First Avenue  A lighted pedestrian crossing and crosswalks exist at corner of Washington and US HWY 17

 Construct sidewalk at grade such that it is ADA compliant.  Provide high-visibility crosswalk markings at all side street roadway crossings. All crosswalks should be six-feet wide at a minimum.  Avoid mid-block crosswalks at uncontrolled intersections.  Install pedestrian signage to existing flashing traffic signal over the crosswalk proposed to cross US HWY 17 at Second Avenue.  Provide ADA compliant sidewalk ramps at all new crosswalk locations.  Include detectable warning surface on curb cuts at all crosswalk locations.  Install longitudinal barriers for the one open drain crossing located on both sides of ROW between Fourth Avenue and Third Avenue  Relocate existing utilities within the proposed path of the sidewalk to a location within the existing right of way.  Avoid trees within the proposed path of the sidewalk.  Provide concrete driveway aprons between US HWY 17 and the back of the proposed sidewalk at all asphalt and gravel driveways.  Increase concrete thickness of the sidewalk to six inches at driveway crossings and areas subject to vehicular crossing to discourage breakage caused by the excessive weight of vehicles.  Construct curb and gutter along the west side of US HWY 17 south of Third Avenue to extent of existing curb on east side of ROW in order to be consistent with existing construction.  Construct curb and gutter along the east side of US HWY 17 between First Avenue and Washington Avenue in order to be consistent with existing construction.  Add marking and signage as part of the existing bike lanes from Fourth Avenue to Washington Avenue.  Improve pedestrian safety by closing driveway openings and increasing access management. Alternatively, provide high- visibility sidewalk markings at all driveway openings.  Add signage to increase awareness of the slow speeds required along this corridor.  Install stop bars and pedestrian crosswalks at all roadway crossings.  Design Changes May Occur!! CONCEPTUAL DESIGN RECOMMENDATIONS

FINANCIAL FEASIBILITY Table 1 provides an Engineer’s Opinion of Probable Cost to construct the proposed corridor based on FDOT 2011 Basis of Estimates Handbook. This estimate is based primarily upon the FDOT 12 Month Moving Average Item Unit Cost Report for Area 6, with costs through 11/30/2012. Cost projections have been shown for sequential years up to 2015 based on a unit cost annual increase based on an inflation factor of five percent. The total estimated cost for design and construction of the sidewalks along US HWY 17 corridor as discussed in this report for the year 2012 is $789, ranging up to $913, in 2015.

US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida SUMMARY Safety is of paramount concern for the consideration of this project. Properly planned and constructed sidewalks can address pedestrian safety by separating pedestrians from vehicle traffic, providing a safe and functional space for all users of the corridor. Adequate ROW exists along the corridor on both sides of the pavement to construct the desired facilities without the need for encroachment out side the right-of-way boundaries. The concept plan and typical cross sections included within this report were formulated based on the results of compiling data regarding existing conditions and applicable FDOT design guidelines. Based on the data gathered, a 5 foot concrete sidewalk is proposed to be located 5 feet from the back of curb and 6 feet from edge of pavement. Potential conflicts may arise along this proposed path that can be resolved by field relocation of obstacle or the pathway. A public involvement program will be provided by the Town of Pierson as part of the design schedule for the project. The total estimated cost for design and construction of the sidewalks along US HWY 17 corridor as discussed in this report for the year 2012 is $789, ranging up to $913, in The results of the study identified the recommended width of the sidewalk and its location was feasible in order to design a cost-effective path that fits within the existing right-of- way.