OPTICON Board Meeting, Porto, 11-11-20081 OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
Jean-Pierre BOURGUIGNON
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
ASPERA-2 WP2: Extension of the network and update of the status of Astroparticle Physics  Objectives  Structure  Tasks  Milestones & Deliverables Kickoff.
0 THE NETWORK OF ULTRAVIOLET ASTROPHYSICS Inform for the MTR Review to be held in Corfu (September 2007, 10-11) Prepared by: Prof. Ana Inés Gómez de Castro.
Philip Diamond RadioNet Co-ordinator University of Manchester Jodrell Bank Observatory.
FP6 Thematic Priority 2: Information Society Technologies Dr. Neil T. M. Hamilton Executive Director.
1 Ideas About the Future of HPC in Europe “The views expressed in this presentation are those of the author and do not necessarily reflect the views of.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
WP5 Strategy Domenico Giardini SED ETHZ. WP5 Objectives Harmonize national implementation Integrate the European scientific community Establish Centres.
NA5: Interferometry Forum Andreas Quirrenbach (U Leiden / U Heidelberg)
REMARKS ON MANAGEMENT AND NETWORKING FOR THE ACTIVE RESEARCH IN THE ENVIRONMENTAL FIELD Katarzyna Jarmołowicz-Szulc PGI CoE Ul. Rakowiecka Warsaw.
1 CENTRES OF EXCELLENCE CENTRES OF COMPETENCE IN CANDIDATE COUNTRIES SUPPORT FOR THE INTEGRATION OF NAS IN THE EUROPEAN RESEARCH AREA QoL/Growth/EESD-2001-INTEGR.
Emilios Harlaftis, National Observatory of Athens OPTICAL AND IR Coordination Network An EU Infrastructure Cooperation Network (FP5) with the aim to bring.
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
Edinburgh, June Interferometry: FP6 & FP7 Alain Chelli, LAOG and Jean-Marie Mariotti Center Andreas Quirrenbach, U Heidelberg on behalf of the European.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
OPERATIONAL GUIDELINES Ensuring Ownership of PARSEL by Partners.
1DEN/DSOE Romania september 2006 HOTLABSSA “The EU 6 th FP Support Specific Action HOTLABSSA: a new step towards an European Network on Hot Laboratories”
A new start for the Lisbon Strategy Knowledge and innovation for growth.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
Key Technologies Network Colin Cunningham. 11th Oct 2004 OPTICON Key Technologies Network Grenoble2 Objectives WP5.1: Workshops & Roadmapping: WP5.1:
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
An I3 funded by the EU through FP6 Alastair G Gunn University of Manchester Jodrell Bank Observatory OPTICON BOARD MEETING – 11 th /12 th October 2004,
OPTICON JRA4 Coordinator Dr Alain Chelli Laboratoire d’Astrophysique de Grenoble & Jean-Marie Mariotti Center, Universite Joseph Fourier, BP53, Grenoble.
M. Dennefeld, Corfu, Sept « Enhancement » activity in N6.3 Definition: « Enhancing the efficiency of research » Concerns researchers having a degree.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
Science, research and development European Commission DG RTD A-2/Peter Härtwich 09/2001 Associated candidate countries in the 5th Framework Programme Associated.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
The Virtual Observatory Europe and the VO: the Astrophysical Virtual Observatory and the EURO-VO Astrophysical Virtual Observatory and the EURO-VO Paolo.
Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory Overall Objectives MTR: 12 April 2007 Grenoble.
1 ASTRONET Coordinating strategic planning for European Astronomy.
WP2 – Strategy, governance and liaisons EuroVO-ICE– First review – 26 October 2011 Françoise Genova, EuroVO-ICE coordinator,1 WP2 Strategy, governance.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
DG ResearchEuropean Commission RTD 06/FK/lb 09/2001 Special measures to further improve participation of Newly Associated States (NAS) in FP-5.
ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures Deadline May 2 nd 2007.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
HORIZON 2020 W ORK PROGRAMME DG Research and Innovation.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
WP6 Technical Work J Lauterjung GFZ Potsdam. Objective The main objective is the development of a novel and efficient e- infrastructure concept addressing.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
Advisory Forum, July 2005 Outcome of the first retreat of ECDC Management Team (EXC) 4-5 July 2005 Krägga Herrgård Zsuzsanna Jakab Director ECDC.
The Role of an Access Programme: Lessons for FP7 Birgitta Nordström Niels Bohr Institute, Copenhagen University Denmark.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI strategy and Grand Vision Ludek Matyska EGI Council Chair EGI InSPIRE.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
The Very Large Telescope Interferometer Neon School, Garching 29 August, 2008 Andrea Richichi European Southern Observatory.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
INS SW Workshop, Garching 8 October, 2008 Andrea Richichi European Southern Observatory.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
ERA-Instruments Thomas Gübitz, Johannes Janssen, Christian Renner, Bonn, 4 Februar 2008 Infrastructure Funding in the Life Sciences.
ICWG: CGMS-43, May 2015, Boulder, Colorado, USA. Coordination Group for Meteorological Satellites - CGMS Status report on the International Clouds.
IASC Mission IASC is a non-governmental organization whose aim is to encourage and facilitate cooperation in all aspects of Arctic research, in all countries.
DG ResearchEuropean Commission RTD 06/FK/lb 09/2001 Special measures to further improve participation of Newly Associated States (NAS) in FP-5.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
WP3 - Evaluation and proposal selection
DCA WP3 Report Support to take-up and implementation of the VObs framework Christophe Arviset (ESA-VO) Paolo Padovani (ESO) Christophe Arviset (ESA),
"Financing Natura 2000 Guidance and Workshops”
ASTRONET Coordinating strategic planning for European Astronomy
Experience of the implementation of FP6; preparations towards FP7
Presentation transcript:

OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli

OPTICON Board Meeting, Porto, Main guidelines during FP7 preparation Reduce the software aspects wrt FP6 activities Serve as much as possible the 2 nd generation instruments  cophasing More general considerations: –Enhancement of the scientific output + communication –Towards the fundamental limits

OPTICON Board Meeting, Porto, Initial WP4 High Angular Resolution by Interferometry Enhancing the scientific output Reaching the fundamental limits WP4 in OPTICON FP7 Three WorkPackages: –WP4.0: Coordination and Management (DM) 90 k€ –WP4.1: Enhancing the scientific output of Interferometry (PK) 270 k€ –WP4.2: New generation of cophasing devices (FD) 640 k€

OPTICON Board Meeting, Porto, Current situation: -60% High Angular Resolution by Interferometry Enhancing the scientific output Reaching the fundamental limits WP4 in OPTICON FP7 Three WorkPackages: –WP4.0: Coordination and Management (DM) 25 k€ –WP4.1: Enhancing the scientific output of Interferometry (PK) 325 k€ –WP4.2: New generation of cophasing devices (FD) Phase 1: 75 k€ Phase 2: (first extension of WP4 in 2010)105 k€ Phase 3: (second extension of WP4 in 2011)105 k€

OPTICON Board Meeting, Porto, WP4.1 Work Package Leader Pierre KERVELLA, Meudon Observatory Reaching the VLTI limits: solving the current issues and limitations –Immediate goals for MIDI & AMBER –Perspectives for PRIMA and Imagery (VLTI-2) Through a post-doc program

OPTICON Board Meeting, Porto, Details of WP4.1 activities 3 postdoc with 18months – 2 years contract + travel budget WP4.1.1 Evaluation of the Paranal atmospheric parameters for high precision fringe tracking. –Goal: assemble a complete picture of the current status of the Paranal atmosphere for interferometry –Synthesis of the various existing measurements –Re-analysis of archive data –CNRS, ESO WP4.1.2 Assessment of the VLTI behavior for MIDI and AMBER operations with PRIMA. –Goal: optimize operation of the VLTI dual-field with AMBER&MIDI –Assess the possibilities and limitations of VLTI infrastructure for PRIMA operations –Analysis of archival data (VINCI, MIDI, AMBER) + in-situ measurements. –Clean-up of the existing data processing software –Preparation of the second generation –NOVA, MPIA WP4.1.3 Preparing the VLTI for its second generation instrumentation. –Goal: Facilitate the first observations with the 2 nd generation instruments –Preparation of the VLTI infrastructure for the dual field operation (2 nd generation instruments) –Establish the procedures and the performances of the dual-field operation with 2 nd generation. –Final goal: increased sensitivity and improved imaging capabilities of all instruments. –MPIA, CNRS

OPTICON Board Meeting, Porto, WP4.2 Work Package Leader: Françoise DELPLANCKE, ESO Contribution to the development of an optimum co- phaser for the VLTI We adopted a phased approach because of the OPTICON funding and the ESO plans –Analysis of FINITO and PRIMA commissioning data for a report on the fringe tracking performances and an optimum setting of the detailed specifications for a 4+ telescopes beam combiner. –If first extension is funded Development of fringe detection and tracking algorithms –If second extension is funded Integration and testing of the new co-phaser for the VLTI In both extensions, the goal is a closer collaboration between ESO and the european institutes on this key facility.

OPTICON Board Meeting, Porto, Summary of staff efforts

OPTICON Board Meeting, Porto, Budget tables

OPTICON Board Meeting, Porto, Deliverables

OPTICON Board Meeting, Porto, Conclusion A strongly reduced plan We strongly request a strong support for the funding extensions of the WP4.

OPTICON Board Meeting, Porto, OPTICON WP11.2 The European Interferometry Initiative Status Report P. Garcia presented by A. Chelli

OPTICON Board Meeting, Porto, /3 aims of OPTICON for FP7 Bring together researchers, instrument builders, national and international agencies to further increase the quality of astronomical research in Europe Develop scientific cases, initiate technical investigations, and begin planning for next- generation world-class observational facilities, ensuring the continuing excellence and development of European astronomy on the world stage

OPTICON Board Meeting, Porto, Fulfil the OPTICON aims at the “Coordination” level for the optical interferometric activities building on the FP6 experience. WP Fizeau grants WP Circumstellar disks and planets w.g. WP AGNs and the galactic centre w.g. WP Science cases for a second generation facility w.g. WP European Interferometry Initiative (EII) Meetings

OPTICON Board Meeting, Porto, WP Fizeau grants Goals –Strengthen nascent collaborations –Spread interferometric knowledge across Europe –Enhance the active participation of new countries in interferometric activities. Method –Fund short exchange visits (1 week – 1 month) –Priority to young researchers and “knowledge poor” institutes –Competitive calls Budget: 48k€ for 4yrs.

OPTICON Board Meeting, Porto, WP Astrophysical working groups Goals –Define European vision and strategy for optical interferometry in the ALMA/E-ELT era –Bring together instrument builder class teams with nascent groups accross Europe Method –Short term and long term science working groups –Teams include 2nd VLTI generation instrument builders and scientists from the comunity at large –Well prepared workshops followed by report One workshop for each short term w.g. Two workshops for long term w.g. –Topics chosen by scientific impact

OPTICON Board Meeting, Porto, WP Astrophysical working groups Short-term working groups (2nd generation VLTI) –WP Circumstellar disks and planets led by S. Wolf (Germany) –WP AGNs and the galactic centre led by A. Marconi (Italy) –Budget: 14k€ per workshop WP Science cases for a second generation facility – KOI (long term) –led by A. Quirrenbach (Germany) and G. Perrin (France) –Budget: 12.5k€ per workshop

OPTICON Board Meeting, Porto, KOI – Kilometric Optical Interferometer Build on the VLTI and KI experience Growing user comunity and science impact of VLTI Most technologies already investigated or demonstrated Multipurpose facility Working group process –Initially the bounding box of the second generation array will be defined –Science cases will be selected on the first workshop after an open call –These will be addressed in detail and presented in the second workshop –Will form the core science for the array definition

OPTICON Board Meeting, Porto, WP European Interferometry Initiative (EII) Meetings Goals –Exchange of information; –Supervision of ongoing projects; –Building of a shared vision –Shared participation in the activities. Method –Yearly meeting of national representatives from all countries including Poland, Hungary and Czech Republic and international agencies ESO/ESA. Budget: 32k€ for 4yrs