And Learning TEAL Consulting Limited a a Meeting Customer Demand in Challenging Times July 2010.

Slides:



Advertisements
Similar presentations
Key Performance Indicators KPI’s
Advertisements

Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Performance Evaluation Using the Balanced Scorecard
HR SCORECARD Presented By ADEEL TARIQ MOBASHIR ALI.
The Management of Academic Workloads: the employers’ perspective Helen Fairfoul 17 September 2009.
To eliminate unnecessary delays in the safe transfer of care of patients from acute therapy teams to community services by improving the quality of information.
Relationship with Stakeholders External Customer Owners/Investors Internal Customer Internal Supplier External Supplier Statutory Agencies/ Government.
Performance Measures What you measure is what you get Performance measures strongly affect the behavior of managers and employees Tailor your performance.
ISO 9001 : 2000.
LeanSigma ® Facilitator Training Module 4 – Voice of the Customer.
Improvement Service / Scottish Centre for Regeneration Project: Embedding an Outcomes Approach in Community Regeneration & Tackling Poverty Effectively.
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
1 Chapter 5: The F1ive Steps in Problem Analysis The five steps in problem analysis. Team Skill 1.
1 Customer and Market Focus in the Baldrige Criteria Examines how an organization determines requirements, expectations, and preferences of customers and.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 4 Focusing on Customers.
OH 3-1 Agenda Chapter Two- Key terms review Chapter Three – The Purchasing Function Chapter Three – Key terms review Chapter Four – The Procurement Process.
1 An Introduction to Lean and Six Sigma for AHQ by ASQ Kelly Roggenkamp April 22, 2010.
Training and assessing. A background to training and learning 1.
Chapter 6 Measuring Indicators
Year 12 Business Studies Operations REVIEW.
Revise Lecture 24. Managing Cash flow Shortages 3 Approaches 1.Moderate approach 2.Conservative approach 3.Aggressive approach.
MANAGEMENT OF OPERATIONS METHODS OF PRODUCTION. LEARNING INTENTIONS AND SUCCESS CRITERIA LEARNING INTENTIONS: I understand the different production methods.
Partnering and Collaborative Working An Introduction Dr Neil Jarrett.
Project Design Assumptions, Pre-conditions, Risks.
1 Middle East Performance Measurement & Benchmarking Conference Challenges of Measurements in Service Industry 21 st to 22 nd June 2004, Dubai Sunil Thawani.
COMPANYWIDE ASSESSMENT OF QUALITY
PART A – QUALITY CONTROL ISSUES AS (3.3) Apply business knowledge to address a complex problem in a given global business context.
Methods 1.ED Overcrowding at 60,000 annual encounters (50% above capacity) 2.Medical staff use of ED to evaluate and write holding orders for evening admissions.
CS3100 Software Project Management Week 26 - Quality Dr Tracy Hall.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
A Florida Natural Resource: The Sterling Approach to Performance Excellence A workshop at The Florida Conference on Aging 2001 Doris Reeves-Lipscomb Groups-That-Work.
Baseline Data Measure Kaizen Facilitation. Objectives Define data types and purpose Explain concepts of efficiency and effectiveness Provide tips on establishing.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
The Balanced Score Card
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
The Value Driven Approach
1 Performance Measures A model for understanding the behavior of our work Presented by Wendy Fraser.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
© Max Zornada (2005)Slide 1 The Cost of Quality and the Cost of Poor Quality "Defects and errors are not free. Someone makes them and gets paid for making.
Evaluating customer service delivery1 Summary Slide Evaluating Customer Service Delivery What is quality of service Benchmarking Using external quality.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Management of Quality Page 161 – 166. Quality  A standard that usually meets the needs and/or wants of the customer.  If the customer is not satisfied,
Higher National Certificate in Engineering Unit 36 Lesson 1 - Statistical Process Control.
Internal Auditing Effectiveness
Chapter 16 Managing costs and quality
Steph Watt Libby Wilson Developing Online Enrolment for New Students: a Case Study to Explore Different Approaches to Process Review.
OPERATIONS MANAGEMENT. OPERATIONS MANAGEMENT 1  Where to produce? What is the best location for the business? In the case of manufacturing, this may.
Customer vs Customer Focus Value from a RoadTek perspectivefrom a customer perspective.
| +44(0) © ICE LTD 2009 All rights reserved. August 2009 version 1.3 System Thinking Champions 5 th March 2015.
Chapter 12 Performance Evaluation Using the Balanced Scorecard.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Cost ‘vs’ Quality Debra Padgett FIBMS Pathology Quality Manager North Cumbria University Hospitals NHS Trust.
Operations Management – Understanding operational objectives (L1) Learning Objective – Explain what is meant by operational targets Learning Outcomes –
PERFORMANCE MEASURES GROUP 4. DEFINITION PERFORMANCE MEASURES. These are regular measurements of outcomes and results which generates reliable data on.
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 10. Evaluation.
ERROR PROOFING VALIDATION LOG
Getting Started with Flow
Balanced Scorecard: Quality, Time, and the Theory of Constraints
HUMAN RESOURCE MANAGEMENT
Professional Certificate in Strategic Change Management
Modernizing A Traditional Public Works Service - A Lean Approach
QUALITY MANAGEMENT SYSTEM
Chapter 4 Focusing on Customers.
Introduction to Quality
Customer Empowerment Working Group
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
Presentation transcript:

and Learning TEAL Consulting Limited a a Meeting Customer Demand in Challenging Times July 2010

Slide 2 © TEAL Consulting Limited 2010 Internal Factors Errors, delays and inefficiencies – plus causes and implications External/Environmental Factors What external constraints are imposed on the service which affect its performance and ability to improve (e.g. economic factors, lack of customer knowledge, unrealistic customer expectations of the service) Customer Demand Type, Volume, Variation, Service vs. Failure, Non- Service Requests, Feedback & Complaints Service Delivery Chain Step 1 Step 2 Step 3 Step n Service Outputs & Outcomes What value and benefit do customers get from the service – what is the impact on related services provided by the organisation? Service Understanding

Slide 3 © TEAL Consulting Limited 2010 Outcomes vs Outputs It's important to understand the difference Processes deliver – OUTPUTS –Recruit Staff - new appointed people OUTCOME - a level of performance or achievement –The staff may be: at the right time or too late for the line manager capable or incapable of performing their role too many or too few

Slide 4 © TEAL Consulting Limited 2010 SERVICE PURPOSE Desired Outcomes, Success Criteria, KPI’s and Targets SERVICE EFFECTIVENESS Customer Focused Process Customer Outcomes, Customer Satisfaction/Dissatisfaction CUSTOMER DEMAND SERVICE EFFICIENCY Service Requests, Avoidable Contact, Complaints…. Resources Needed to Satisfy All Demand

Slide 5 © TEAL Consulting Limited 2010 What are we trying to achieve Quality TimeCost Our focus is – variation reduction Our focus is – waste reduction Our focus is – a reduction in the amount of calendar time consumed + People Q C T People are the glue that hold organisations together Our focus is empowerment

Slide 6 © TEAL Consulting Limited 2010 Cost of Poor Quality COPQ Prevention Costs External Failure Costs Appraisal Costs Internal Failure Costs Cost of Conformance Cost of Non-Conformance

Slide 7 © TEAL Consulting Limited 2010 Understanding Customer Requirements Gather meaningful Data on what the Customer requires –Voice of the Customer (VOC) Analyse and Translate VOC into meaningful terms –Critical to Quality standards (CTQ)

Slide 8 © TEAL Consulting Limited 2010 Starting with “What is a Customer ?” A Customer is a recipient of the Output of a Process The Customer can be Internal or External External Customers are not limited to end-users of the Product or Service External Customers can also include Regulators, Monitors of Law and the Public or Community (Stakeholders) The definition of Quality here means satisfying Customer Needs

Slide 9 © TEAL Consulting Limited 2010 Kano Model of Customer Expectations Need not Fulfilled Satisfaction Need Fulfilled Must Have’s Dissatisfaction Region Satisfaction Region Delighters More is Better Service Pressure More is Better needs are generally explicit, Must Have’s and Delighters are usually unspoken More is Better needs are generally explicit, Must Have’s and Delighters are usually unspoken Dissatisfaction

Slide 10 © TEAL Consulting Limited 2010 VOC to CTQ : CTQ Tree GeneralSpecific Hard to measure Easy to measure CUSTOMER: “Good room service" Speed of Delivery Elapsed Time from Order to Arrival Cost Service Charge Compared with eating in restaurant Taste Presentation Temperature Food Quality VOC Critical Customer Requirement CTQ “Vague” termsMeasurable items

Slide 11 © TEAL Consulting Limited 2010 Defining Customer CTQs Convert customer data into Specific Requirements Define a Requirement not a Solution Document all the information Ensure the Requirement is Measurable Define the Measure Establish meaningful Specification Limits The acid test is whether the CTQ can be Measured

Slide 12 © TEAL Consulting Limited 2010 Runners, Repeaters & Strangers % Vol 80% 100% 95% % Service range Runners Rapid flow Dedicated processes Self managed 20% Repeaters Partially flow Shared processes Some management Strangers One offs Universal processes Significant management

Slide 13 © TEAL Consulting Limited 2010 Consider the following 3-step process: Input 100 documents ABC Output 90 documents Yield = 90% Is this the whole story? Rolled Throughput Yield Problems in processes have a cumulative effect...

Slide 14 © TEAL Consulting Limited 2010 REWORK Rework - Hidden Processing Input 100 Documents A RFT = 94% B RFT = 91% C RFT = 92% Output 90 Documents 9398 SCRAP What is the true yield (Rolled Throughput Yield) ?

Slide 15 © TEAL Consulting Limited 2010 Rolled Throughput Yield Input 100 documents A RFT = 94% B RFT = 91% C RFT = 92% Output 90 documents 9398 Rolled Throughput Yield = RFT A x RFT B x RFT C = 0.94 x 0.91 x 0.92 = 79% A true reflection of process performance

Slide 16 © TEAL Consulting Limited 2010 Overall Process Effectiveness Source : Lean Toolbox for Service Systems John Bicheno

Slide 17 © TEAL Consulting Limited 2010 Exercise Objective –To identify the Customers of your Processes –To consider what improvement could be made in your service effectiveness and efficiency How –List 1 of your service processes –Identify all the Customers of this Process – Internal and External –Consider what measures exist for your processes Output –An understanding of what measures currently exist –An initial assessment of the effectiveness and efficiency of your Processes

Slide 18 © TEAL Consulting Limited 2010 Reminder - Customer Value Value is Generated for Customers via –Quality –Cost of Service –Delivery In meeting Customer Needs there is benefit for the organisation in terms of –Right first time – lower number of repeat calls –Lower Costs – Less time wasted –Satisfied customers e.g. rate payers Reduction of Non Value Adding time is a major driver –Minimising amounts of staff time wasted.

Slide 19 © TEAL Consulting Limited 2010 External Perspective Time Waiting time Length of delivery delay Perceived service quality They don’t care about my business; it isn’t worth the wait B Customer traffic

Slide 20 © TEAL Consulting Limited 2010 Internal Perspective Customer Satisfaction Level of customer satisfaction Length of delivery delay Sales Size of service and delivery department We can’t afford these employees

Slide 21 © TEAL Consulting Limited 2010 And Finally Understanding what outcome the service is intended to deliver - is the start Understanding how this impacts on quality of service delivery is critical The effectiveness of the service has a direct impact on your costs So jumping to be more efficient before addressing effectiveness is a short term fix – which will come back later