Thomas Jefferson National Accelerator Facility Pg. 1 SHMS Status Hall C Users Feb. 2014 Paul Brindza.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
The Cosine Two Theta Quadrupole Magnets for the Jefferson Lab Super High Momentum Spectrometer (SHMS). P.B. Brindza, S.R. Lassiter M. J. Fowler Abstract—
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
LARP Collaboration Meeting Racetrack Coil Fabrication
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MICE/MuCool Coupling Magnets ICST/HIT Progress and Schedule for the MICE/MuCool Coupling Coil Project HIT MICE CC Project Group.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
ELENA installation progress F. Butin / ELENA collaboration.
12 GeV Project Status Glenn R. Young 12 GeV Project Status
QXF Coil Fabrication & Tooling Reaction / Impregnation
11 T Dipole Integration & Plans M. Karppinen
LARP Vertical Test Facility
JLAB MEETING FDR – April 23-24th 2013
FRESCA2 Update on the dipole design and new calculations
Spectrometer Solenoid Fabrication Status and Schedule
Far Detector Activities Late 2017 – Early 2018
Teleconference ACS – FREIA 20th February 2018
CNGS horn / reflector in 2005: The story of the glass ring insulator
Hall C SHMS & Configuration Status
as a prototype for Super c-tau factory
Hall C SHMS & Configuration Status
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Thomas Jefferson National Accelerator Facility Pg. 1 SHMS Status Hall C Users Feb Paul Brindza

Thomas Jefferson National Accelerator Facility Pg. 2 SHMS Construction Feb 13, 2014

Thomas Jefferson National Accelerator Facility Pg. 3 SHMS Outline HB magnet construction Q1 magnet construction Dipole magnet construction Q2Q3 magnet JLAB magnet components Hall C Infrastructure

Thomas Jefferson National Accelerator Facility Pg. 4 HB Construction Coils complete and LHE tested Helium vessel assembly underway –Helium vessel backbone complete –Coil 1 installed, shimmed and welded in –Coil 2 installed, shimming underway LN2 shield sub-assemblies underway Warm Yoke complete Vacuum vessel components complete Assembly of helium, vessel around coils has taken longer than expected- current ETA is April 2014 Delivery to JLAB – August 2014 Monthly visits by JLAB to MSU to keep up pressure

Thomas Jefferson National Accelerator Facility Pg. 5 Status of HB Manufacturing First coil inserted in helium vessel (covered by middle plate) Thermal shield test-fit onto Helium vessel.

Thomas Jefferson National Accelerator Facility Pg. 6 Top vessel view in vertical position Wiring from bottom through conduit to top, 5 mil kapton sheet between coil ends and retainers. HB Helium Vessel

Thomas Jefferson National Accelerator Facility Pg. 7 Status of HB Manufacturing Hi-pot test at V with back plate clamped Lead out insulated

Thomas Jefferson National Accelerator Facility Pg. 8 Status of HB Manufacturing Back plate tack welded Vessel repositioned for bottom coil shimming (bottom coil up)

Thomas Jefferson National Accelerator Facility Pg. 9 HB Schedule

Thomas Jefferson National Accelerator Facility Pg. 10 Bore of Q1 Magnet

Thomas Jefferson National Accelerator Facility Pg. 11 Q1 Magnet Status Coils- complete and tested Yoke- complete Cold mass assembled and tested Warm field mapping complete Cryostat Components(Helium, LN2, Vacuum) complete Helium vessel assembly around cold mass underway LN2 shield and Vacuum vessel assembly TBD Factory testing Delivery to JLAB – July 2014

Thomas Jefferson National Accelerator Facility Pg. 12 Yoke Containment Shells

Thomas Jefferson National Accelerator Facility Pg. 13 Q1 He Vessel

Thomas Jefferson National Accelerator Facility Pg. 14 Q1 LN2 Shield

Thomas Jefferson National Accelerator Facility Pg. 15 Q1 OVC Vessel

Thomas Jefferson National Accelerator Facility Pg. 16 Q1 Schedule

Thomas Jefferson National Accelerator Facility Pg. 17 Q1 Magnet - Summary Construction well-advanced. Schedule risk being carefully monitored. –60% of sub-contract is complete. –Good performance for the last 8 months. –Using incentives to advance delivery date. No known technical risks: –Typical manufacturing tasks and workmanship remain. –QA and vendor oversight processes in place.

Thomas Jefferson National Accelerator Facility Pg. 18 Dipole Q2Q3 Highlights Oct Feb 2014 Site SigmaPhi Oct,Nov,Dec, Jan, Feb….. near continuous presence by JLAB engineers Q2Q3 FDR complete with punch list Oct 2013 Production Consolidation Equipment Operational Dipole Prototype VPI completed Dec 13 Second winding station complete Second source of coil spacers delivering ~ 1 layer per week( see the video) Conductor properties 300K and 4 K results including shear measurements exceed requirements

Thomas Jefferson National Accelerator Facility Pg. 19 Production Coil winding

Thomas Jefferson National Accelerator Facility Pg. 20 Production coil 1 st segment and spacer installed

Thomas Jefferson National Accelerator Facility Pg. 21 Dipole Construction Underway First dipole production coil winding started Feb 17 First segment (25 turns) and spacer installed today Second dipole production coil wind start March 12 Dipole cryostat at Chastigny and ASME overlay at APAVE proceeding well 4 K measurements of conductor compression modulus excellent results 4 K 300 K improved measurements with extensometer demonstrate that the initial “soft strain” was a measurement artifact. This makes the coil preload much easier and reduces the interference required. Shear measurements in reasonable agreement with JLAB/Hall B/Torus

Thomas Jefferson National Accelerator Facility Pg. 22 Prototype Coil Results Winding –Techs, equipment and winding went well –late delivery of spacers caused delays resolved with the second source –Coil Resistance and ringing tests results all OK –Equipment is sensitive to single shorted turn VPI –Equipment worked OK except for mold leaks which allowed air intrusion causing some voids. Leaks were found and cause (rusty mandrel)eliminated. –Mold release on coil spacers worked as planned –VPI process improvements to preclude a repeat Confidence high so proceed to production!!!!

Thomas Jefferson National Accelerator Facility Pg. 23 Prototype in VPI Mold

Thomas Jefferson National Accelerator Facility Pg Dipole prototype coil

Thomas Jefferson National Accelerator Facility Pg VPI improvement Objective N°1: Improve the impregnation quality Modifications implemented: 1.Replace G10 sheet 0.2 mm by fiber glass cloth for easier resin flow 2.Increase the number of holes in the G10 sheet (0.3 mm thickness) 3.Sand blast mold for better vacuum seal 4.Tilt the mould (20-30°) to favor the resin flow in between the conductors 5.Install the resin mixer above the mold to trap the air bubbles inside the feed pipes 6.Keep more pressure above the resin inside the malaxer to slow down the impregnation 7.Sequential injection 8.Increase the curing duration to about 30h (cold point at 120°C hot point at 135°C) Objective N°2: Make the resin less sensitive to cracking Modifications Implemented: 1.Improve the injection geometry: larger draft (30 degrees tilt) 2.Add flexibilizer to the resin

Thomas Jefferson National Accelerator Facility Pg. 26 Conductor testing Compressive stress strain results demonstrate that ALL dipole conductors have near identical properties- no need to sort conductor 300 K results from UBS lab using an extensometer demonstrate that the initial “soft strain” is a measurement artifact arising from surface defects and using platen travel- more good news! 4 K results demonstrate average compressive yield at 148 MPA as compared to 100 MPA stress levels at 11 Gev - adequate margin at operating current. Shear results to date indicate adequate margin. More measurements planned. Good agreement with JLAB measurements.

Thomas Jefferson National Accelerator Facility Pg. 27 Compression 300K

Thomas Jefferson National Accelerator Facility Pg. 28 Test Instron at UBS with LVDT’s and Extensometer

Thomas Jefferson National Accelerator Facility Pg K Conductor compression results from CEA/Saclay Youngs Modulus(Gpa)Yield (MPA) original K K K22148

Thomas Jefferson National Accelerator Facility Pg. 30 Production consolidation equipment 30 meters per hour

Thomas Jefferson National Accelerator Facility Pg. 31 Production winding lines at SigmaPhi

Thomas Jefferson National Accelerator Facility Pg. 32 Prototype in production oven

Thomas Jefferson National Accelerator Facility Pg. 33 Dipole Schedule

Thomas Jefferson National Accelerator Facility Pg. 34

Thomas Jefferson National Accelerator Facility Pg. 35 Summary- SigmaPhi Magnets Production coil winding –coil 1 started Feb 17 –coil 2 March 12 Coil spacer delivery solved by second source delivery now one set per week First double layer of production coils 1 and 2 will be separately impregnated to verify VPI. Dipole conductor mechanical property measurements excellent results confirm adequate margins Dipole delivery June 2015 Q2Q3 delivery Aug/Oct 2015

Thomas Jefferson National Accelerator Facility Pg. 36 Magnet Components by JLAB HB/Q1/Q2/Q3/Dipole Conductor Cryogenic Control Reservoir (5 magnets) Warm Yoke Steel (3 magnets); Q1 cold yoke by SMI; HB by MSU DC Power Systems (5 magnets) Instrument and Controls (5 magnets) Stands and Mounts (5 magnets)

Thomas Jefferson National Accelerator Facility Pg. 37 Magnet Components by JlAB-complete ContractVendorCost K$ DeliveryStatusInstallation assembly DC SystemDanfysik 922Jan/Apr 2013CompleteMarch 2014 CryoReservoirMeyer Tool1,067Jan 2012CompleteAt mag vendors Current LeadsAMI 94Feb 2010CompleteAt mag vendors Controls & Software JLAB 1,009Oct 2013Complete Testing Underway April 2014 Yoke CastingsNingbo- Jansen 1,298Oct 2012CompleteNA Yoke Machining Craft Machine 125June 2013CompleteApril 2014 SC CableSSC surplus NA CompleteNA SC Cable Testing BNL 91Nov 2007CompleteNA Copper Channel FMM 266Feb 2012CompleteNA Redraw Channel FMM 15Feb 2012CompleteNA Wave solderAES 284Oct 2012CompleteAt mag vendors Magnet supports Various 154Oct 2012CompleteInstalled

Thomas Jefferson National Accelerator Facility Pg. 38 SHMS Cryo System Re-use G0 transfer line- Mods by Hall C Complete Re-use G0 flex gas return lines- Ready to install New flex cryo-line support – Installation March 2014 New SHMS transfer line- Installed Feb 2014 New U-tubes,L-tubes magnet connections complete, delivered and tested at JLAB Warm gas return system manifolds- complete Warm gas return system- installation underway

Thomas Jefferson National Accelerator Facility Pg. 39 SHMS Installation Rails and mounts complete Steel Structure complete Shield House concrete – last pour Friday Feb 14, 2014 Equipment deck 99% complete Magnet stands installed SHMS transfer line installed Target access platform contracted Shield house interior shielding contracted Shield house raised floor- bids in-award soon Electrical and LCW installation underway

Thomas Jefferson National Accelerator Facility Pg. 40 SHMS Summary All magnets in production Delivery of last magnet (Q3) still very tight Issues with conductor properties resolved JLAB magnet components all complete and delivered or installed or awaiting installation SHMS Cryo system all components on site and tested transfer line installed SHMS assembly in Hall C proceeding very well First magnet delivery July 2014 and we will be ready

Thomas Jefferson National Accelerator Facility Pg. 41 Happy Days!!!