1 URBEMIS 2007 Training South Coast AQMD September 19, 2007 Tim Rimpo – Jones & Stokes
2 Today’s Presentation What is URBEMIS2007? When do you use URBEMIS2007? Why use URBEMIS2007? What are the improvements? Where do you find it? How do you use it?
3 What is URBEMIS2007? Free Software Program URBAN EMISSIONS + EMFAC2007 Limited to Land Use Projects Emissions Estimated Include ROG, NOx, CO, SOx, PM10 and PM2.5 (Exhaust and Dust), CO2
4 What is URBEMIS2007? Used to Estimate Project-Specific Emissions Emissions Can Be Estimated Separately for Project Construction, Area, and Operations (lbs/day & tons/yr)
5 When Do You Use URBEMIS? CEQA Projects: Initial Studies, Negative Declarations, Mitigated Neg Decs, EIRs NEPA Projects: Environmental Assessments, EISs General Conformity Emission Inventories Indirect Source Rules
6 Why Use URBEMIS ? Recommended by Most Air Districts Standardizes Emission Calculations for Land Uses Quicker Approach than Estimating from Scratch What Mitigation is Appropriate?
7 What URBEMIS2007 Can’t Do Stationary Sources Road Widening/Linear Infrastructure Agricultural Sources, Aircraft, or Boats Emissions of TACs (Except Diesel Exhaust) Dispersion Modeling or Estimating Ambient Concentrations
8 Use URBEMIS with Caution Large Projects Trips and VMT Consistent with Traffic Model Complicated, Multi-Phased Projects
9 URBEMIS2007 Improvements Emfac2007 and Offroad2007 Air District and County-Level Default Files Construction Phasing PM2.5 and CO 2 Improved Look and Feel
10 Version Bug Fixes Construction Exhaust Printing Annual Results Construction Default Equipment Imperial and San Joaquin Default Files Acreage of Non-Residential Displayed Other Fixes on URBEMIS.com
11 Where do I find URBEMIS2007? 1) URBEMIS website:
12 Installation Go to : Save to hard disk, then double click to install
13 Start Project (New or Existing)
14 URBEMIS Conceptual Flowchart Start Project (New or Existing) Select Air District Specify Land Uses Select Construction Phases & Mitigation Select Area Sources & Mitigation Edit Operational Emission Options & Mitigation Modify Project Assumptions Generate Emission Estimates Save File
15 The Seven Steps of URBEMIS2007 Step 1 – Open A New or Existing Project Step 2 – Enter Land Use Data Step 3 – Enter Construction Data Step 4 – Enter Area Source Data Step 5 – Enter Operational Data Step 6 – View and Print Output Step 7 – Save and Close the Project
16 URBEMIS Start Screen
17 Software Interface Navigational Pane Assistant Pane Content Forms Utilities
18
19
20
21
22 Step 2: Specify Land Uses Specify Land Use Sizes Edit Trip Generation Rates, if needed Edit Trip Percentages, if needed Edit Acreage, if needed Edit Commute Trip Percentages, if needed
23
24 Step 3: Construction 1) Specify Phases, Phase Start and Stop Dates 2) Add Specific Information for Individual Phases 3) Add Mitigation Measures, if necessary
25 Construction Phases 1) Demolition, 2) Mass Site Grading, 3) Fine Site Grading, 4) Trenching, 5) Building Construction, 6) Asphalt, 7) Architectural Coatings
26
27
28 Step 4. Enter Area Source Data Natural Gas Hearth – Wood Stoves, Fireplaces, Gas Stoves Landscape Equipment Consumer Products Architectural Coatings
29
30 Step 5. Enter Operational Emissions Data Separate Emissions Calculated for Each Land Use Emissions Based on: Target Year, Fleet Mix, Trip Characteristics, Temperature, and Variable Starts
31
32 Step 6. Viewing and Printing Output
33
34
35 Step 7. Saving a File and Exiting URBEMIS
36
37 Advanced Topics Setting Directories (C:\Program Files\Urbemis\Urbemis 9.2\Urb2007Win9_2_2.exe.config) Pinning and Floating File Menu
38 How to Get Help (including User’s Forum) User’s Manual F1 from within URBEMIS URBEMIS Seven Step Help Screens Videos
39 Questions ??? Tim Rimpo Jones & Stokes