February 26, 2015. 201420152013 2016 August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement.

Slides:



Advertisements
Similar presentations
1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
Advertisements

TERMINATION AND RECOVERY. Termination of the Emergency Considerations for event termination If the Emergency Operations Center (EOC) has not been activated,
Florida: Legislative appropriation for cleanup reduced for FY09-10 by approximately $63 million from last year’s initial appropriation State Fund.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
ACADs (08-006) Covered Keywords Description Supporting Material Accident Analysis
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
5/19/2015 Segmentation of the Legacy C Area Disassembly Spent Fuel Pool Prepared by: Jon Guy, N&CSE Spent Fuel Project Lead UNCLASSIFIED DOES NOT CONTAIN.
Revision of NUREG-0654 Supp. 3 RI Scheduling Conference December 11, 2008 Mystic, Ct Randy Sullivan, CHP.
Overview of State Decommissioning Activities April & May 2015 (Mostly from a VT Public Service Department Perspective) Presented by Tony Leshinskie, VT.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
WELCOME: EPA PUBLIC MEETING
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
California Energy Commission James Madigan April 27, 2015.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Radiological Emergency Response Plan (RERP) Emergency Planning Overview- Now and in the Future Vermont Division of Emergency Management and Homeland Security.
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
September 24, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
V ERMONT Y ANKEE E MERGENCY R ESPONSE D URING SAFSTOR AND DECON P RESENTATION TO THE N UCLEAR D ECOMMISSIONING C ITIZENS A DVISORY P ANEL Bill Irwin, Sc.D.,
February 26, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee, LLC (ENVY)
Intervention for Chronic and Emergency Exposure Situations Module IX Basic Concepts for Emergency preparedness and Response for a nuclear accident or.
Overview of State Decommissioning Activities September 2015 Tony Leshinskie VT State Nuclear Engineer September 24, 2015 NDCAP Meeting.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
INTERNATIONAL ENVIRONMENTAL LAW Nuclear energy. OECD Convention on Third Party Liability in the Field of Nuclear Energy (Paris 1960) Convention on Civil.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Status of Ongoing Rulemakings OAS Annual Meeting August 29, 2012 Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking.
Denise Imbler, Program Administrator Florida Hazardous Materials Planning and Prevention Program
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
November 12,  As of September 30, 2015, the ENVY NDT Balance was $595,733,175 ◦ Changes in the NDT are due to market losses/gains, reimbursement.
November 12, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
PROTECTIVE ACTIONS AND REENTRY. Protective Actions Promptly and effectively implemented or recommended for implementation to minimize the consequences.
NRC Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2008 NRC Region I Joint Exercise Scheduling.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
Oyster Creek [Exelon Nuclear] Oyster Creek: Operated at power Scheduled Maintenance Outage April 24 – May 13 NRC Assessment (ROP Action Matrix): Licensee.
Decommissioning San Onofre
Department of Environmental Quality
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Decommissioning Issues
Emergency Preparedness During Decommissioning
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
John Christian President, Logistics, Processing and Disposal
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
Spent Fuel Pool Instrumentation NRC Order EA
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Joseph D. Anderson, Chief
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
CR3 and Crystal River Energy Complex
Robert Kahler Branch Chief
SONGS Past, Current, and Future State May 4, 2016
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Possible Transition from Operating to Decommissioning
Department of Environmental Quality
Temporary Rulemaking for 15A NCAC 02L Section .0400
Decommissioning Rulemaking
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
November , 2018 State Roundtable Reports Pennsylvania
Presentation transcript:

February 26, 2015

August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement Permanently Defueled Emergency Plan September 23, 2013 Entergy submits notification of intent to cease operations to the NRC January 12, 2015 Fuel permanently removed from reactor vessel Commercial Operations began in February 5, 2015 Implement Post-Shutdown Emergency Plan SAFSTOR I SAFSTOR II ISFSI 2020 Implement ISFSI Emergency Plan

 Vermont includes: ◦ Brattleboro ◦ Dummerston ◦ Halifax ◦ Vernon ◦ Guilford ◦ Marlboro  New Hampshire includes: ◦ Chesterfield ◦ Hinsdale ◦ Richmond ◦ Swanzey ◦ Winchester  Massachusetts includes: ◦ Bernardston ◦ Colrain ◦ Gill ◦ Greenfield ◦ Leyden ◦ Northfield ◦ Warwick

 EPlan Submittals made to date: ◦ Post-Shutdown EPlan License Amendment Request (LAR) – implemented 2/5/15. Covers SAFSTOR Period 1 - Plant Shutdown to April 2016 ◦ EP exemption requests – NRC Commissioners expected to vote to grant exemptions, March 2015 (supports Permanently Defueled EPlan and EALs) ◦ Permanently Defueled EPlan and Emergency Action Levels (EALs) LAR – Approval expected in Late Covers SAFSTOR Period 2 - April 2016 to All Fuel in Dry Storage  Submittals posted at

 NRC approval received 2/4/15  Implemented 2/5/15  Fully compliant with existing regulation and guidance ◦ No exemptions from regulation ◦ Onsite and offsite programs are maintained and all EP requirements met, including exercises  Changes to on-shift and ERO staffing appropriate with lower risk of non-operating plant ◦ Maintain the capability to assess and monitor actual or potential offsite consequences of a radiological emergency and mitigate accidents associated with the Spent Fuel Pool (SFP)

 Robust Emergency Plan remains in place  States continue to be fully funded at same level as operation* ◦ RERP funding Over $4.5 Million – Vermont – Over $2.1 Million – New Hampshire – Over $ 1.4 Million – Massachusetts – Over $ 1.05 Million  Minor changes as a result of plant shut down  Significant reduction in potential events as a result of defueling  Much slower event progression warrants future changes. * Fiscal Year (FY)

 W e expect the NRC to take action on the filing in March 2015 ◦ NRC regulations do not distinguish between an operating power reactor and one that is permanently shutdown/defueled ◦ Expected exemptions are similar to those granted to Kewaunee and Crystal River Unit 3 and those requested by SONGS currently awaiting a vote by Commissioners ◦ Exemptions form the foundation for the Permanently Defueled EPlan (PDEP) and EALs ◦ Exemptions are a normal part of regulatory process

 W e expect the NRC to take action on the filing in the 4 th quarter of 2015  Implementation expected in April 2016  Robust emergency plan commensurate with the reduced risk of an offsite release and types of possible accidents  Offsite emergency measures are consistent with all hazards planning approach  Emergency Planning Zones (EPZ) ◦ Within Plant Site Boundary commensurate with reduced risk ◦ Environmental Protection Agency (EPA) Protective Action Guidelines (PAGs) Manual, “EPZs are not necessary at those facilities where it is not possible for PAGs to be exceeded off- site.”

 Emergency Action Levels ◦ Address Spent Fuel Pool (SFP) and Independent Spent Fuel Storage Installation (ISFSI) –Radiological Conditions –Hazards –System Malfunctions ◦ Unusual Event and Alert Classifications

 Declaration Time ◦ VY maintains the capability to assess, classify and declare an emergency condition as soon as possible and within 30 minutes after the availability of indications to plant operators that an emergency action level threshold has been reached  Notification Time ◦ Notification to VT, NH, MA as soon as possible and within 60 minutes of emergency declaration or change in classification  ERO Augmentation Time ◦ Goal of the ERO is to augment the on-shift staff as soon as possible and within 2 hours of an Alert classification  The State of Vermont opposes the issuance of the PDEP LAR, and on February 9, 2015, the State filed a petition to intervene and request for a hearing on the LAR with the NRC.

 LAR will be submitted in the future  Implement after all fuel is transferred to the ISFSI, currently planned for 2020  Robust Emergency Plan commensurate with the reduced risk and types of possible accidents related to storage of spent fuel on ISFSI  Fully compliant with regulation