PRE-QUALIFICATION AND BID ENTRY WEB APPLICATIONS CONTRACTS ADMINISTRATION Presenters: Juanita Moore Leila Griffin September 9, 2003.

Slides:



Advertisements
Similar presentations
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Advertisements

Highway Construction Contract Information (HCCI) Website
FDOT State Specifications & Estimates Office
Contractor Desktop Electronic Bid System Training.
GSA Public Buildings Service How to Submit a Proposal.
Presented by Cheri Sylvester Asst. Estimates Coordinator Florida’s Turnpike Enterprise Presented by Cheri Sylvester Asst. Estimates Coordinator Florida’s.
Welcome to Purchasing Training Policies and Procedures May 12th, 2014.
Prequalification in 2014 Nancy Taylor Cate Boskoff Orbach Huff Suarez & Henderson LLP.
Insert software product logo (or name) on slide master AASHTO Civil Rights and Labor Management System Executive Summary.
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation SiteXchange (C-92) Tina Collins Office of Contracts.
Welcome to the PICSWEB Overview PICSWEB is a web-based, user friendly application that enables Government agencies to tap into the GPO Procurement Information.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
87th Air Base Wing Ms. Suzanne Edgar Flight Chief, 87 CONS Doing Business with the Federal Government.
For MIP Fund Accounting Software
Grande Cappuccino at Starbucks - $3.40 Hotel accommodation at Crowne Plaza Hotels and Resorts - $ New business suit for conference - $ Succeeding.
Marcy Mealy Procurement Specialist CDBG Program
1 Construction Cost Impacts Florida DOT Experience Greg Davis State Estimates Engineer Florida Department of Transportation Greg Davis State Estimates.
EMARS User Group Meeting Don Speer. ETHNIC MINORITY BUSINESS SMALL PURCHASES 2.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Contracting with WYDOT
PROCEDURES FOR SELECTING THE CONTRACTOR
New York State Grants Reform Laurie Naber Office of Research and Project Administration Laurie Naber Office of Research and Project Administration.
1 IDOT Vendor Portal Training August 5, 2013 Illinois Department of Transportation Presenter: Betsy Calcara.
1 PROCUREMENT AUTHORITY AND RESPONSEBILITIES Dr. Fred Mugambi Mwirigi JKUAT.
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc.
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc. Ozette Brown, BidX Product.
Procurement Process Economic Stimulus. Items to Be Discussed Professional Services Information Design Build vs. Conventional Where to Find Advertisements.
EPTO Electronic Paid Time Off System Lora Headdy ePTO & HRMS eDoc System Manager.
AUTHORIZATION STEPS Fingerprinting Authorizations Responsibilities School Bus Driver Inservice
Construction Prequalification & Prebid Questions/Addenda Adam Kieffer Construction Prebid and Prequalification Coordinator Office of Contract Sales.
Continue. IN COMPLIANCE WITH §161 OF THE TEXAS LOCAL GOVERNMENT CODE, VENDORS * AND LOBBYISTS MUST COMPLETE THIS TRAINING AT LEAST ONCE PER YEAR WHEN.
Performance Management Using SBA’s Entrepreneurial Development Management Information System (EDMIS)
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
PICSWEB Overview PICSWEB is a web-based, user friendly application that enables Government agencies to tap into the GPO Procurement Information Control.
Tyrone Ware FDOT Specifications & Estimates Office Estimating Systems Support Section.
RemoteNet Presented By The Systems House, Inc.. Enhancements Order by multiple selling units of measureOrder by multiple selling units of measure Web.
STATEWIDE INITIATIVE TO BE CONSISTENT TO BE PREDICTABLE TO BE REPEATABLE.
ARRA Reporting – Upcoming Initiatives Office of Contracts.
1 EXT400 – Corporate Vendor Admin Activities. 2 1.Corporate Vendor Admin Process Overview 2.Complete Vendor Registration 3.Register Plants/Shipping Locations.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Capital Budget System (CBS) Agency Training 1. Introductions… Name Name Agency Agency Capital Budget System Role Capital Budget System Role Goals for.
3 CDBG Disaster Recovery Appropriation # 2 Workshop Thursday, April 2, 2009.
Click to add text Dealer Pre-Qualification Information Session STATE OF MICHIGAN Department of Technology, Management and Budget Purchasing Operations.
Common Origination and Disbursement Navigating the Web Presenter: Renee Wade National Association of Sigma Users July 24, 2003.
USDA webTA Configuration Process United States Department of Agriculture Office of the Chief Financial Officer National Finance Center.
Maintenance Specifications For Jan and beyond.
UPDATING RIGHT OF WAY MANUALS FLORIDA’S PROCEDURES.
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO.
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
Office of Procurement Services.  Vendor Application Website: 
Lighting Rebate Portal ®. ® Purpose is to provide incentives to customers during change outs or new construction 2.
3 CDBG Disaster Recovery Program InformationWorkshop Tuesday, January 13, 2009.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
PROJECT DEATH Stephanie Rich. Corrective Work Punch List Punch List Work Complete Date Work Complete Date Request Final(s) Request Final(s) Comprehensive.
Presented by: CCSD Procurement Services Department How to do Business with the Cobb County School District 1.
Florida Department of Transportation TRANSPORTATION Florida Department of MPO UPWP, Invoicing & Monitoring Process Federal Certification of the Statewide.
Maintenance Management System (MMS) Florida Department of TRANSPORTATION Kirk Hutchison Office of Maintenance.
SiteManager and Maintenance Management
Sun City Lift Station Odor Control Improvements
Construction Oversight
FDOT Support Services Programs
FDOT Support Services Programs
USOAP Continuous Monitoring Approach (CMA) Workshop
ARRA Reporting – Upcoming Initiatives
Add Budget Period Steps Screenshots Purpose:
Order Processing and Requisition Accelerator
Procurement Planning Mani Ram Gelal
Instructions for New Contractors Construction Division
Diversity management system (DMS)
Presentation transcript:

PRE-QUALIFICATION AND BID ENTRY WEB APPLICATIONS CONTRACTS ADMINISTRATION Presenters: Juanita Moore Leila Griffin September 9, 2003

TOPICS STRUCTURE PRE-QUALIFICATION (PQ) BID LETTING WEB APPLICATION

Structure Florida Department of Transportation (FDOT) has 9 Contract Administration Offices; Central Office, 7 District Offices and one Turnpike Enterprise. Each office has the responsibility to advertise, let and award road and bridge construction contracts. Most state funded construction contracts less that $1M and maintenance contracts are handled by the District Contracts Offices.

PRE-QUALIFICATION WEB APPLICATION

FDOT Pre-Qualification Pre-Qualification Overview Pre-Qualification Process Request for Pre-Qualification Certificate of Qualification PQ Web Enhancements Future Enhancements

Pre-Qualification Overview The Contracts Administration Office administers the Department’s program for contractor pre-qualification per Chapter 337 F.S. Contractors are pre-qualified with the Department in order to bid for the performance of road, bridge, or public transportation construction contracts in excess of $250,000. Contractors pre-qualify annually.

Requests For Pre-Qualification Contractors wanting to become pre-qualified are directed to the web site containing the information regarding pre- qualification,which includes the Application. Currently, the application must be completed off-line. After the Application is reviewed and approved,the contractor is issued a Certificate of Qualification.

Certificate of Qualification The Certificate will list the Classes of Work the Contractor is approved to perform, the Maximum Bidding Capacity expressed in a dollar amount and the Expiration Date of the Certificate. This information is electronically stored in the Department’s Mainframe System (CCQ), used for Consultant/Contractor Information.

PQ Web Application Contractor Inquiry Web Application Previous Process To Verify Contractor Pre-qualification District Process To Verify Contractor Pre-qualification

Contractor Inquiry Web Application The Contractor Inquiry Web Application is a web based listing of the current pre-qualified contractors. The Contractor’s contact information and approved classes of work are listed. This list is maintained on a “real time” basis This Application allows the user to sort by contractor name and work class. This Application is on the FDOT web site.

Contractor Inquiry Web Application (cont’d)

Previous Process To Verify Contractor Pre-qualification Central Office uses Job Order Processing system (JOP) with an interface with CCQ to verify Pre-Qualification. JOP is not available to District Offices. Districts would manually check the listing of pre- qualification to determine whether the contractor had the required class of work. The Districts would Central Office to verify: capacity, work under way, expiration date, etc…and wait for a response. Central Office annually processed over 1,000 district requests for vendor verification.

District Process to Verify Pre- qualification This application interfaces with LAS. The Districts select a letting and/or proposal and the system will verify the contractors PQ expiration date and bidding capacity and compare it to the project’s budget estimate, for all Planholders on the proposal in LAS. Based on the comparison, the request for a bidding document is Approved or Denied. The system generates an to the Central Office for all denials for a PQ action, if necessary

District Process to Verify Pre- qualification (cont”d)

Future Enhancements To include the Tallahassee and District Contracts Offices in a Statewide Web Based System that would provide for Bidding Proposal approval, “real time” updates of published Plan Holder Lists, Letting Results etc. for all projects advertised statewide To develop an on-line Application For Qualification

BID ENTRY WEB APPICATION

FDOT Bid Entry Bid Submittal Overview Bid Entry Application (BEA) Interfaces The BEA Process Future Enhancements

Bid Submittal Overview FDOT receive sealed bids in 12 locations statewide. District 3 District 2 Satellite District 5 Central Office District 1 Turnpike District 4 District 7 District 6 Satellite

Bid Submittal Overview (cont’d) Central Office –Bids are received in 7 district offices, three satellite offices and one Turnpike Enterprise office. –The bid total sheet is submitted with the official bid. –Contractor’s record their bid total on the bid total sheet. –The bid totals are entered into the Bid Entry Application (BEA) on the day of the letting. –Bids submitted in other locations are shipped overnight to Central Office. District Offices and Turnpike Enterprise –Bid are received by individual districts offices. –District do not use the “Bid Total Sheets“

Bid Entry Application The Bid Entry Application (BEA) is a web application used to manage the departments bid entry process. BEA interfaces with other FDOT systems. BEA handles simultaneous entries. BEA is user friendly and easy to navigate. BEA performs calculations of various bid totals. –Letting low bids –Awarded Bids –Rejects Bids BEA does not update any systems.

Interfaces Trns*port LAS Job Order Processing System (JOP) JOPLAS BEA

Trns*port LAS LAS interfaces with the mainframe Job Order Processing System (JOP) and the Bid Entry Application (BEA).

Job Order Processing (JOP) JOP interfaces with LAS and the Bid Entry Application. Districts do not use the JOP mainframe system.

The BEA Process Pre-Letting –Load Letting Data –Load Verification –Preliminary Bidders List Letting –Bid Entry Process –Letting Reports –Letting Results Post-Letting –Reports –Original Bidders List –Contract Adjustments LAS JOP LASBEA PRE-LETTING LETTING

Pre-Letting LAS updates JOP with the Letting ID, Letting Proposals, Budge Estimate, and the Plan, Specifications and Proposal cost. LAS updates BEA with the Letting ID, Letting Proposals and Projects. JOP updates LAS & BEA with planholders valid for bidding. JOP/LAS updates BEA with the “Standard” or “Alternative” codes.

Letting Main Page

Letting Page

Letting Reports Page

Project Status/Edit Index

Letting Reports Page

Preliminary Bidders List

Letting Page

BEA Letting Process Bid Total Input Letting Reports Letting Results

Bid Total Input Bid totals are input immediately after 10:30 A.M. Bid total updates are performed up to 7 days after the initial bid opening. District locations are closed after bid totals are entered. Each location is monitored by Central Office.

Letting Main Page

Letting Page

Financial Project Index

Bid Entry (Standard)

Financial Project Index

Bid Entry (Alternative)

Letting Main Page

District Close Out

District Re-Open

Letting Reports Audit Report Letting Results

Audit Report

Audit Report (cont’d)

VF APAC-SOUTHEAST, INC. $2,362, VF AJAX PAVING INDUSTRIES $2,486, VF PCL CIVIL CONSTRUCTORS $2,244, VF MISENER MARINE CONSTRU $2,462, VF GILBERT SOUTHERN CORP. $2,540, Letting Results Available on the Contracts Administration Web Site. An average letting last 30 to 45 minutes. Letting Results “Real Time”

Letting Results (cont’d)

Post-Letting Reports Original Bidders List Contract Adjustments

Letting Reports Page

Bid Bond Check List

Letting Reports Page

Original Bidders List

Letting Reports Page

Project Status/Edit Index

Standard Project

Project Status/Edit Index

Alternate Contract

Letting Reports Page

Future Enhancements To implement Bid Express on-line bidding Spring 2004.