© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

November 19, 2013 Preparing a Successful RFP to get Desired Results.
Systems Analysis and Design in a Changing World
Chapter 2 Analyzing the Business Case.
Identifying and Selecting Projects
Chapter 3 Project Initiation
IS4799 Information Systems and Cybersecurity Capstone Project
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Chapter 3: The Project Management Process Groups
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Planning and Strategic Management
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
PRESENTED BY TRUST THOMAS EROMOSELE STUDENT NO:
Project Management Lecture 5+6 MS Saba Sahar.
Project Management Fundamentals Project Organization and Integration
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Project Management Process Overview
Topic 2- 1ICT 327 Management of IT Projects Semester 1, 2005 Topic 2 Project Planning & Initiation Schwalbe: Chapter 3 Compiled by Diana Adorno and contributions.
9 Closing the Project Teaching Strategies
1 Lecture 3.9: RFP, SOW and CDRL (SEF Ch 19) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Chapter 2 Needs Identification. 2 Learning Objectives Review the project life cycle –identifying needs –proposing a solution –performing the project –terminating.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Finishing the Project and Realizing the Benefits Chapter 15 Contemporary Project Management Kloppenborg © 2012 Cengage Learning. All Rights Reserved. May.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Chapter 2 Needs Identification
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Project Identification and Project Selection
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Life Cycle – Project Initiation © Ed Green Penn State University All Rights Reserved.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
TK3333 Software Management Topic 2: Needs Identification.
1 The Washington State Board of Education Applying to Authorize: Authorizer Application and Evaluation Jack Archer, Senior Policy Analyst State Board of.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Chapter 8 The Marketing Plan McGraw-Hill/Irwin
©2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
The Project Plan Plan Your Work, then Work Your Plan
Quick Recap.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
V. 2. © Copyright and all rights reserved 4. Project Integration Management PMP Prep Course Based on the PMBOK ® Guide 3 rd Edition.
The Project Management Process Groups
The Budgeting Process 7. OBJECTIVE 1: Define budgeting, and explain budget basics.
© 2016 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
BCOM 7 Organizing and Preparing Reports and Proposals 11 Copyright ©2016 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated,
Project Management PTM721S
Chapter 2 Needs Identification
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
Identifying and Selecting Projects
Needs Identification.
Chapter 13 Proposals, Business Plans, and Formal Business Reports
Request for Proposal & Proposal
Identifying and Selecting Projects
Chapter 2 Needs Identification
Presentation transcript:

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Identifying and Selecting Projects 2

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter Concepts How projects are identified and selected A project charter Outsourcing projects using a request for proposal The proposal solicitation process

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Learning Outcomes Discuss how projects are identified Explain how projects are prioritized and selected Identify and describe at least eight elements of a project charter Prepare a project charter Prepare a request for proposal

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Project Integration Management Project Procurement Management Project Management Knowledge Areas from PMBOK® Guide

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Project Identification Start of Initiating phase Recognize need, problem, or opportunity Various ways for identification Organizations strategic planning Response to unexpected events Group organized to address a need Important to clearly identify need to determine if worth pursuing Use decision making process to prioritize and select project with greatest need

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Project Selection Evaluate needs, costs, benefits Determine which are projects Select project Develop criteria List assumptions Gather data Evaluate each opportunity Combine “gut” feelings and quantitative information to make decision

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Project Charter Purpose Provides sponsor approval Commits funding for the project Summarizes key conditions and parameters Establishes framework to develop baseline plan Possible Elements Project title Purpose Description Objective Success criteria or expected benefits Funding Major deliverables Acceptance criteria Milestone schedule Key assumptions Constraints Major risks Approval requirements Project manager Reporting requirements Sponsor designee Approval signature

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Preparing a Request for Proposal Decision made to outsource to external resource Comprehensively describe project requirements Includes need, problem, or opportunity description Allows contractors to develop a thorough proposal Facilitates the development of evaluation criteria May be communicated informally or formally, in writing or verbally

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Guidelines for Developing an RFP State project objective or purpose Provide a statement of work Include customer requirements State deliverables the customer expects State acceptance criteria List customer supplied items State approvals required State type of contract State payment terms State schedule and key milestones List format and content instructions Indicate due date Include evaluation criteria Include level of effort or funds available

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Soliciting Proposals Solicitation Notify potential contractors Identify selected group in advance to send copy Advertise in selected journals, newspapers, or websites Maintain competitive situation Provide equal information to all bidders Hold bidders’ meeting to answer questions Conditions Requirements are sometimes communicated verbally instead of via a formal RFP All RFPs start with identification of a need, problem, or opportunity

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Critical Success Factors The need must be clearly defined before preparing a request for proposal (RFP). When selecting a project from among several needs or opportunities, the decision should be based on which project will provide the greatest overall benefits compared to its costs and possible consequences. Having a well-understood evaluation and selection process and a well-rounded committee will increase the chances of making the best project selection decision. Establish quantitative project success criteria, or expected benefits. A good RFP allows contractors to understand what the customer expects so that they can prepare a thorough proposal that addresses the customer’s needs and requirements. A request for proposal should include a statement of work, customer requirements, expected deliverables, and the criteria by which the customer will evaluate proposals. An RFP should provide instructions for the format and content of contractor proposals so that the customer will be able to make a consistent and fair comparison and evaluation of all the proposals. Customers must be careful not to provide information to only some of the contractors because it would give these contractors an unfair competitive advantage in preparing their proposals.

© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Summary The initiating phase of the project life cycle starts with recognizing a need, problem, or opportunity for which a project or projects are identified to address the need. Sometimes organizations identify several or many needs but have limited funds and people available to pursue potential projects to address all of those needs. In such cases, the company must go through a decision-making process to prioritize and select those projects that will result in the greatest overall benefit. Project selection involves evaluating potential projects and then deciding which should move forward to be implemented. Once a project is selected, it is formally authorized using a document referred to as a project charter, sometimes called a project authorization or project initiation document. In some cases, an organization does not have the expertise or staff capacity to plan and perform the project or major portions of the project, and therefore decides to have the project completed by an external resource (contractor) and prepares and RFP. Once the RFP has been prepared, the customer solicits proposals by notifying potential contractors that the RFP is available. Not all project life cycles include the preparation of a written request for proposal by a customer and subsequent submittal of proposals from contractors. Some endeavors move from the initiating phase, where a project is identified and selected, into the planning and performing phases of the life cycle.