US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Slides:



Advertisements
Similar presentations
District 4 Sign Assessment and Replacement Design- Build Project Request for Qualifications Information Meeting April 17 th, 2007.
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
TH 610 Design-Build Project S.P February 25, 2009 Dan W. Penn, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING Looking TH 169.
TH 55 Mill and Overlay Design-Build Project S.P
GSA Public Buildings Service How to Submit a Proposal.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Business Research Requests and Proposals
Marcy Mealy Procurement Specialist CDBG Program
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
New York State Department of Transportation
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Effectively Responding to Award Solicitations Objective Identify elements of a government solicitation package. Respond more effectively to government.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
New York State Department of Transportation
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Purchasing Overview. Fundamentals of Purchasing Procedures.
PROCUREMENT SERVICES DEPARTMENT “How We Do Business”
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
United Nations Procurement Division
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Ohio River Bridges Project
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
JEOPARDY PROCUREMENT EDITION Methods StandardsMystery ProceduresRegulations Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 FINAL.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Construction Management At Risk Process
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
Elevating the Quality of Life in the District. Debriefing Procedures Department of General Services Contracting and Procurement Division Policy, Research,
1 Office of Procurement Presents Request for Proposal (RFP) Process.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Green Line Extension Project
Light Rail Transit Project
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Developing and Issuing the RFP
“How We Do Business”.
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Green Line Extension Project
Procurement.
DESIGN-BUILD PROGRAM OVERVIEW
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29, 2008

US 113 Phase 2B Project The project consist of design and construction of two additional lanes along existing US 113. The project also includes design and construction of new service roads to maintain access to residential and commercial properties. Roadway improvements include new full depth construction, wedge and leveling, resurfacing of existing roadways and shoulders, reforestation, closed/open drainage systems, stormwater management quality and quantity facilities, signing, intersection lighting, pavement markings, culvert replacement and culvert extensions.

STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS

Competitive Sealed Proposals This Contract is a stipulated sum, design-build contract which will be procured using the “Competitive Sealed Proposals” procurement method as defined in the Code of Maryland Regulations (COMAR) Title 21, Subtitle 05, Chapter 3.

Competitive Sealed Proposals The intent of the Administration is to award the Contract to a responsible team of designers and builders (DB Team) whose Proposals are determined to be the best overall value for the Administration and the citizens of Maryland for the stipulated sum set forth in the Request for Proposals (RFP).

Competitive Sealed Proposals Two Step Procurement Process Step 1 – Request For Qualification (RFQ) Step 2 – Request For Proposals (RFP)

Step 1 – Request For Qualification (RFQ)

Objective is to create a Reduced Candidate List (RCL) of the most highly qualified Proposers with the general capability (technical, financial, and management), capacity and experience necessary to successfully undertake and complete the Work. A Draft RFP and limited project support information will be made available with the advertisement of the RFQ

Step 1 – Request For Qualification (RFQ) Statement of Qualifications (SOQ) Evaluation Factor I.Team Experience and Past Performance II.Team Organization and Qualifications III.Legal Structure and Financial Capability

Step 1 – Request For Qualification (RFQ) Once SOQ evaluations are completed a reduced candidate list (RCL) shall be developed. Those DB Teams who have made the RCL shall be notified in writing and shall be supplied with the Final RFP Package.

Step 2 – Request For Proposals (RFP)

Proposal submittal will include : Technical Proposal Price Proposal

Step 2 – Request For Proposals (RFP) Technical Proposal Evaluation Factors I.Project Technical Elements and Approach II.Environmental Approach III.Project Management IV.Project Schedule

Step 2 – Request For Proposals (RFP) Price Proposal Evaluation Factors I.Lump Sum Price w/ Lump Sum Breakdown

Step 2 – Request For Proposals (RFP) The technical review team and price proposal team will be made up of two separate groups of SHA staff. For the purpose of the RFP evaluation, the technical proposal shall determine award of the contract. Price Proposal will be evaluated to verify Technical proposal elements

Stipulated Sum

Step 2 – Request For Proposals (RFP) The RFP will include a stipulated sum for the project. The Administration will set the value of the contract as the stipulated sum. This stipulated sum shall be on a lump sum basis, and shall include all engineering, design, construction, labor, equipment and materials, and all incidentals necessary to complete the design and construction of this project. Price Proposal received with a price less than or greater than this amount will be considered nonresponsive.

Step 2 – Request For Proposals (RFP) Minimum Responsive Limits The Maryland State Highway Administration has established the design and construction of two additional lanes along the existing US 113 alignment to create a dual divided highway and all related design and construction activities for approximately 2 miles as the minimum responsible limits for this project. Technical Proposals received with less than these limits will be considered nonresponsive.

Step 2 – Request For Proposals (RFP) Maximum Limit of the Widening The Maryland State Highway Administration has procured the Right-of Way to facilitate the design and construction of two additional lanes along the existing US 113 alignment for approximately 1700 LF and for the design and construction of Access Road M and has established this as the maximum limit of the widening.

Step 2 – Request For Proposals (RFP) PROPOSED PROCURMENT SCHEDULE Issue RFQAugust 26, 2008 Post DRAFT RFP on SHA WebsiteAugust 26, 2008 Final Date for Receipt of Proposer’s QuestionsSeptember 9, 2008 SOQ submittal to MSHASeptember 16, 2008 Reduced Candidate List (RCL) NotifiedSeptember 23, 2008 Issue Final RFP to RCLSeptember 30, 2008 Receive Technical & Price ProposalsNovember 21, 2008 Request Best and Final Offers (BAFO) if requiredNovember 21, 2008 to December 5, 2008

Questions?

If you need additional information, please contact Mr. David W. Phillips at