O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Status of Construction and Commissioning of the GSI HITRAP Decelerator Outline:

Slides:



Advertisements
Similar presentations
HITRAP – A CS based control system R. Bär, W. Barth, D. Beck, T. Beier, M. Bevcic, E. Berdermann, K. Blaum, M. Block, A. Bräuning- Demian, H. Brand, K.
Advertisements

Lyon 2005 DIPAC Lyon th DIPAC Lyon June 2005Ulrich Raich CERN AB/BDI Instrumentation in small, low energy machines Ulrich Raich CERN AB-BDI.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
Carbon Injector for FFAG
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
Beam Dynamics Layout of the FAIR Proton Injector Gianluigi Clemente, Lars Groening GSI, Darmstadt, Germany Urlich Ratzinger, R.Tiede, H.Podlech University.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Zoran Andjelkovic Johannes Gutenberg Universität Mainz GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
Beam diagnostics in the beamlines
J. Alessi RF Structures EBIS Project Technical Review 1/27/05 RF Structures J. Alessi Some general thoughts on what our approach will be.
Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans H. Okuno, et. al. (RIKEN Nishina Center) and P. Ostroumov (ANL) Upgrade Injector Low.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
R. Tiede, Institute for Applied Physics (IAP), Goethe-University Frankfurt 1 42nd ICFA Advanced Beam Dynamics Workshop on High-Intensity, High-Brightness.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
Concept Preliminary Estimations A. Kolomiets Charge to mass ratio1/61/8 Input energy (MeV/u) Output energy (MeV/u)2.5(3.5) Beam.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
THE MAFF IH-RFQ TEST STAND AT THE IAP FRANKFURT A. Bechtold, J. Fischbach, D. Habs, O. Kester, M. Pasini, U. Ratzinger, J. Rehberg, M. Reichwein, A. Schempp,
In-pulse-average: Search for multiples of t rf and t DAQ which “coincide”: 1891 t DAQ = ns ~ =41 t rf Calculate sample mean over blocks of.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Precision Tests of Fundamental Interactions with Ion Trap Experiments
NICA injection complex status
ESR Slow highly charged ions and antiprotons
A. Martynov on behalf of accelerator division.
Experiments with heavy, highly charged Ions HITRAP Project Status
Performance of BI systems at HIE-ISOLDE
Progress in the Multi-Ion Injector Linac Design
Acceleration of RIB using linacs
Status of the Front End Test Stand April 2007.
A. Plastun¹, B. Mustapha, Z. Conway and P. Ostroumov
Beam dynamics of RAON accelerator system
INTRODUCTION AND OVERVIEW. Operators training.
Experimental Overview
Magnetized Bunched Electron Beam from DC High Voltage Photogun
Precision Measurements of Very-Short Lived Nuclei
LINAC4 commissioning plans etc.
Z6 experiments and necessary beam parameters
Pulsed Ion Linac for EIC
R. Suleiman and M. Poelker September 29, 2016
Advanced Research Electron Accelerator Laboratory
Part2: Cavities and Structures
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Linac Diagnostics Commissioning Experience
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Status of Construction and Commissioning of the GSI HITRAP Decelerator Outline:  Introduction and motivation  Beam dynamics issues of the decelerator  Status of the linac, trap and of the commissioning efforts

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Production of multi-charged ions Charge state breeding HITRAP

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Experiments based on Penning traps  Laser spectroscopy  g-factor measurements of the bound electron  Mass measurements of extreme accuracy  Polarization of radio nuclides  Decay spectroscopy of highly-charged radio nuclides Collision experiments: Collisions at very low velocities Surface studies and hollow-atom spectroscopy X-ray spectroscopy Experiments based on Penning traps  Laser spectroscopy  g-factor measurements of the bound electron  Mass measurements of extreme accuracy  Polarization of radio nuclides  Decay spectroscopy of highly-charged radio nuclides Collision experiments: Collisions at very low velocities Surface studies and hollow-atom spectroscopy X-ray spectroscopy HITRAP schematic overview ~10 5 U 92+ ions

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy HITRAP linac overview to experiments DDB section IH section & MEBT LEBT & Cooler trap 7m RFQ section VBL 4MeV/u0.5MeV/u6keV/u5keV*q  Frequency = MHz  Max. A/q = 3  Intensity ~ 10 7 charges per macro bunch  Frequency = MHz  Max. A/q = 3  Intensity ~ 10 7 charges per macro bunch

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy ESR deceleration – From 400 to 4 MeV/u magn.dipole field ion current RF amplitude 40 s stochastic cooling at injection energy implemented electron current for final cooling at 4 MeV/u increased ESR cycle during recent experiment injection, stoch. cooling deceleration 400 – 30 MeV/u e - cooling, rebunching deceleration 30 – 4 MeV/u e - cooling, ejection reset magnets signal: time (s)

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Transport of the ions from the ESR to the DDB diag 2: FC (two directions) +MCP Bending magnet DDB Bending magnet magnetic quads Drift: 6.67 m Beam in ESR Diagnostic box Diagnostic box Diagnostic used in high energy section:  Faraday cups  Profile grid  Scintillator screens (YAG) Diagnostic used in high energy section:  Faraday cups  Profile grid  Scintillator screens (YAG) Expected beam properties:  Bunch length of 1  s  Cooled beam with transverse emittance of ~1 mm mrad at 4 MeV/u  Energy spread ~0.01% Expected beam properties:  Bunch length of 1  s  Cooled beam with transverse emittance of ~1 mm mrad at 4 MeV/u  Energy spread ~0.01%

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Double-drift- buncher Magnetic quadrupole doublet lenses Bending magnets ESR Beam from the ESR Transverse beam focusing 120 mm horizontal direction vertical direction Beam profiles!

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy HITRAP – Double Drift Buncher 4 MeV/u 0.5 MeV/u 6 keV/u  s Bunch from ESR 0.4 ns 9.2 ns RF – 108 MHz Bunching  Two coaxial resonators  MHz cavity (4 gaps)  MHz cavity (2 gaps)  Two coaxial resonators  MHz cavity (4 gaps)  MHz cavity (2 gaps)

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Bunched Ions from the DDB 6 keV/u 9 ns Ne 10+, not cooled in ESR 95% emittance ~6 mm mrad signal on diamond detector RF signal of buncher Cup signal in front of IH-structure bunch length 3  s, 0.6  A peak current

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy The HITRAP – IH Structure 4 MeV/u 0.5 MeV/u 6 keV/u For beam measurements: pepper pot emittance meter diamond detectors  25 gaps  Max MV eff. acc. voltage  Shunt impedance 290 M  /m  1 inner tank lens (magn. triplet)  25 gaps  Max MV eff. acc. voltage  Shunt impedance 290 M  /m  1 inner tank lens (magn. triplet)

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy IH Structure – Energy Spectrum (LORASR) G. Clemente  Phase sensitive  not sensitive on the rf-amplitude  Phase sensitive  not sensitive on the rf-amplitude sensitive on entrance energy (here the case of 3.99 Mev/u) sensitive on entrance energy (here the case of 3.99 Mev/u)

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Beam dynamics for 4 MeV/u beam horizontal vertical Beam measurements Beam measurements

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Beam dynamics for a decelerated beam (0.5 MeV/u) horizontal vertical Beam measurements Beam measurements

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Setup for beam measurement of beam properties pepper pot emittance meter pepper pot emittance meter diamond detectors fluorescence screen fluorescence screen Steerer Slits

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy From 4 MeV/u to 0.5 MeV/u IH commissioning: deceleration from 4 MeV/u to 0.5 MeV/u Energy signal on single crystal diamond detector: MeV/u Magnetic deflection set to 4 MeV/uMagnetic deflection set to 0.5 MeV/u Diamond detector Diamond detector

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy HITRAP – Decelerated Ions 4 MeV/u 0.5 MeV/u 6 keV/u 12% beam profile on diamond

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy HITRAP – ReBuncher & RFQ 4 MeV/u 0.5 MeV/u 6 keV/u  4-rod RFQ and 2 gap spiral re-buncher  Last deceleration stage  rod voltage 77.5 kV  length = 2m  4-rod RFQ and 2 gap spiral re-buncher  Last deceleration stage  rod voltage 77.5 kV  length = 2m

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy First Beam behind RFQ MCP FC digital camera low energy, low intensity MCP-based imaging detector all RF off BB1: 8,5V & 0° BB2: 6,1V & 150° BB1 & BB2 IH: 7,1V & 150° BB1, BB2 & IH RFQ: 6,0V & 90°

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy HITRAP – LEBT & Cooler Trap 4 MeV/u 0.5 MeV/u 6 keV/u catch the ions in flight cool them with combined electron and resistive cooling to ~ 4 Kelvin e-e-e-e- e-e-e-e- U 92+

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy HITRAP – LEBT & Cooler Trap 4 MeV/u 0.5 MeV/u 6 keV/u 4 MeV/u LEBT installed, trap magnet installed and tested trap electrodes ready, assembly in progress

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Summary  Installation of the LINAC and low energy transport completed  Offline tests of HITRAP cooler trap (are about to start)  Commissioning of linac ongoing  Identification of the ion energy is essential  Compact identification of particle energy is required

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy HITRAP Collaboration F. Herfurth 1, O. Kester 2, W. Barth 1, M. Bevcic 1, K. Blaum 3,4, M. Block 1, K. Brantjes 1, G. Clemente 1, L. Dahl 1, C. Dimopoulou 1, S. Eliseev 3, R. Fischer 1, P. Forck 1, M. Kaiser 1, H.-J. Kluge 1, C. Kozhuharov 1, S. Kozudowski 1, G. Maero 1, F. Nolden 1, B. O'Rourke 1, J. Pfister 5, W. Quint 1,4, D. Racano 1, U. Ratzinger 5, A. Sauer 5, A. Schempp 5, A. Sokolov 1, M. Steck 1, T. Stöhlker 1,4, M. Vogel 1, W. Vinzenz 1, G. Vorobjev 1, C. Will 1, D. Winters 1, A. Wolf 3, O. Zurkan 1 and the HITRAP collaboration 1 GSI Darmstadt 2 National Superconducting Cyclotron Laboratory, MSU, East Lansing 3 Max-Planck-Institut für Kernphysik Heidelberg 4 Ruprecht Karls-Universität Heidelberg 5 J. W. Goethe-Universität Frankfurt am Main

O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy The GSI pepper pot emittance meter matrix of 15x15 holes diameter 100μm spacing 1.6mm drift length 150mm 10-bit cooled CCD  0.3mrad beam