Monterey Peninsula Water Supply Project - Presentation to Monterey Co. Water Resources Agency June 25, 2012.

Slides:



Advertisements
Similar presentations
Summary of MPWMD Local Desalination Project Proposal
Advertisements

ppt Tularosa Basin National Desalination Research Center Feasibility Study Presented by Mike Hightower, Sandia National Laboratories Tom Jennings,
Policy Position Statement. The Community has struggled unsuccessfully for 35 years to find new sources of water Cal Am was mandated to cut back it use.
MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION – WATER RESOURCES May 19, 2005.
Zone 7 Water Agency Zone 7’s Salt Management Plan Past, Present & Future May 9, 2012 Kurt Arends, P.E. AGM Engineering and Operations Zone 7 Water Agency.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Exploring Regional Desalination as a Water Supply Option in the Bay Area The Who, What, When, Where, Why and How of Regional Water Supply Planning May.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
Test Slant Well Construction Cost Estimate 1 Slant Test Well - Drilling & Installation$2,300,000 Material Advance Purchase - Pump, Column, Casing, Screen$700,000.
WRWSA Water Supply Plan Update Progress Report – (April 1- May 15) >Project Tasks 1.Water Demand Estimates 2.Availability of Ground- and Surface Water.
Monterey Peninsula Water Management District 1 Quarterly Update on EIR for Long-Term Water Supply Project October 29, 2002 at 5:30 PM MPWMD Conference.
1 South Orange Coastal Ocean Desalination (SOCOD) Project, Ocean Desalination Costs and Recent Public Opinions November 2011 Status Update Karl Seckel,
1 Investing in your water … investing in your future California American Water General Rate & Conservation Case Applications.
Seawater Desalination and Water Supply Reliability in Marin County Louis Armstrong, URS Corporation.
FGD MONITORING PROJECT ORSANCO Technical Committee Meeting June 4, 2013 Item 8a.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
1 Recycled Water Program for the City of Los Angeles.
NRCS Watershed Rehabilitation
Policy Position Statement.  Ground Water Replenishment (GWR) - by Monterey Regional Pollution Control Agency (MRWPCA) and Monterey Peninsula Water Management.
Review of Subsurface Seawater Intakes DEIR, Monterey Desal Project DRAFT Presentation to Monterey Peninsula Regional Water Authority 23 June 2015.
Jim Heitzman General Manager Marina Coast Water District
BAWSCA’s Strategy In 2009, BAWSCA embarked on the Long- Term Reliable Water Supply Strategy to: o Determine the Water Supply Problem When, where, and how.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
Marina Coast Water District: A California Special District ORD COMMUNITY WATER AUGMENTATION DIRECTORS Dr. THOMAS P. MOORE President JAN SHRINER Vice President.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Water for Monterey County Regional Project Capital and O&M Cost Description 1 Lyndel Melton, P.E. RMC Water and Environment.
Monterey Peninsula Water Supply Project April 23, 2012.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
DRA Perspective on What Recycled Water Applications from Investor- Owned Utilities Should Contain and How They Should be Evaluated CPUC Water Recycling.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Scientific Approaches to Assess Impacts Associated with Seawater Desalination Susan C. Paulsen, Ph.D., P.E. Vice President and Senior Scientist Desal Conference.
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
1.Freshwater, Marine and Brackish Water Resources 2. Freshwater pollution.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Technical Workshops on Monterey Peninsula Water Supply Project A July 26 & 27, 2012.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Texas Innovative Water 2010 Kevin Morrison, P.G. Project Coordinator / Water Resources What has SAWS Learned about Concentrate Disposal Options for Inland.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Western Delta Diversion Gary W. Darling Delta Stewardship Council September 22, 2011 Delta Diablo Sanitation District.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
Natural Disaster Management Group Drinking Water Advisory Group July 21, 2015 Alexander Hinz Wendi Wilkes Water Supply Division Texas Commission on Environmental.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
1 State Water Resources Control Board Draft Cease and Desist Order Community Leader Workshop March 28, 2008.
MSSC 2011 Annual Salinity Summit February 17 – 18, 2011 Thirty Years of Success in Implementing Desalination By Roger K. Noack, P.E. HDR Engineering, Inc.
Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014.
Slide 1 Drinking Water Subcommittee Greg Gartrell, Chair CALFED Bay-Delta Public Advisory Committee SWRCB Periodic Review Presentation January 2005.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Date: November 12, 2014 Presented by CAW at the California Coastal Commission hearing T E S T S L A N T W E L L P R O J E C T.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Date: December 17, 2014 Presented by CAW at the California State Lands Commission hearing T E S T S L A N T W E L L P R O J E C T.
Recycled Water Salinity Reduction Policy Utilities Advisory Commission December 2, 2009.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
Test Slant Well Project Permit Amendment (Coastal Commission Agenda Item Tu 15a) Date: Oct. 6, 2015 Presented by CAW at the Oct. 6, 2015, California Coastal.
Water Reclamation Plant Feasibility Study Update May 28, 2014
Withlacoochee Regional Water Supply Authority
Brackish Water Desalination Project
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
City of Sunrise Wastewater Reuse Program
The Water Framework Directive: Challenges, Threats and Opportunities
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Is the Bay Area Ready for Potable Reuse?
Why Potable Reuse in Florida?
Presentation transcript:

Monterey Peninsula Water Supply Project - Presentation to Monterey Co. Water Resources Agency June 25, 2012

Monterey Peninsula Water Supply Project Our application before the California Public Utilities Commission is extensive. To signup for project updates or view the application, visit our project website: 2

Presentation Topics MPWSP Basics  How GWR fits into our Project  Where are we now Design of MPWSP Intake System to Minimize Intake of Inland Groundwater Desalinated Water Supply to SV User Seawater Intrusion Control Benefits Reclaimed Water Salinity Control 3

MPWSP Basics Desalination and ASR facilities required to replace partial loss of supplies from Carmel River and Seaside Groundwater Basin. 5.4 MGD to 9.0 MGD (5,500 to 9,000 AFA) desalination plant, depending on implementation of MRWPCA’s GWR project. Desalination plant to be located near landfill entrance to 22 MGD slant intake system (6 to 8 Wells) on coastline Brine discharge to MRWPCA’s existing outfall 4

Role of GWR Independent Project by MRWPCA Groundwater Replenishment (GWR) which takes secondary wastewater effluent and processes it through an Advanced Water Treatment facility is a great opportunity for the Peninsula by:  Lower overall Carbon Footprint  Reduce Loadings to Monterey Bay  Creates vast underground storage reservoir CAW’s desal plant will be sized nearly in half if GWR can be implemented. 5

Where are we now? Submitted Application to CPUC on April 23, 2012, seeking approval to design, build and place into rates a 9,006 AFA desal plant. Application includes CEQA review by CPUC. Application also seeks permission to make desal plant smaller (5,506 AFA) if the GWR project can be realized in time. The decision to implement GWR will be based on several factors, including: cost, schedule, and public acceptance. ALJ expected to issue scoping memo soon which will layout CPUC schedule. 6

Intake being Considered

Intake Wells Objectives:  Limit intake of water from inland sources to the extent practicable  All water taken from beneath the seafloor beyond the shoreline. Method:  Slant Wells, with screens placed under the seafloor and in 180- foot formation. 8

Slant Well – Typical Cross Section 9

Slant Well – Estimated Depression Contours 10 Extensive technical analysis of the potential effects and impacts of the slant wells on local and regional groundwater conditions in the SVGB was performed by Geoscience and Luhdorff & Scalmanini as part of the CEQA review for the Regional Water Project. These are two of the leading groundwater consulting firms in the State. CPUC is revisiting as part of their review of the project.

Test Slant Well Currently working on Test Slant Well to be located on Cemex property at southern end. Monitoring wells to be located 200 – 250 feet north of test slant well and would be used to verify geology prior to installation of slant well. We will work with MCWRA to develop a comprehensive monitoring program. Test well program is needed to gather more information as to geology, salinity, configuration, etc. 11

Agency Act & Water Rights CAW will return 100% of all groundwater captured to the SVGB basin. Proposed action is consistent with Agency Act and California Water Rights Law. Options for Return to Basin:  1) CSIP  2) Drill injection well on CAW property, and  3) Make available for beneficial use to MCWRA or other party. 12

Desalinated Water to be Returned to Basin Examples:  Assume 9,000 AFA plant capacity  Assume 0% ground water capture (future 2030 condition)  Annual return to be 9,000 * (% GW ) = 0 AFA  Assume 9,000 AFA plant capacity  Assume 1% ground water capture (future 2030 condition)  Annual return to be 9,000 * (% GW ) = 90 AFA  Assume 9,000 AFA plant capacity  Assume 3% ground water capture (future 2030 condition)  Annual return to be 9,000 * (% GW ) = 270 AFA 13

CSIP Impacts if this Return to Basin Option Used Objectives:  Increase water available to CSIP for agricultural irrigation  Reduce Salinity of CSIP irrigation water Method:  Returning a portion of desalinated water to CSIP will increase supply and reduce salinity of CSIP’s irrigation water  Adjusting salinity of desal supply will reduce salinity of CAW’s combined water supply and reduce the salinity of wastewater generated by CAW’s customers. 14

Salinity of Water Supply 15 Post Desal

Existing Salinity 16 FOR ILLUSTRATION PURPOSES

Proposed Salinity 17 FOR ILLUSTRATION PURPOSES with GWR Chlorides  ~60mg/l

Questions 18