Acumen7 1 Accelerating UK Nuclear New Build Tony Roulstone July 2006.

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Nuclear Power: Opportunities, Challenges and Solutions Black Sea Energy Conference - April 2006 Ron Cullen General Manager and Project Director Romania.
New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
European Biomass Power Plant Markets Increased Growth Across Europe Interactive Analyst Briefing Ian French - 21st August 2002.
Renewable Targets and Policy Linda Pooley Head of Renewable Energy Technology and Investment Scottish Governmnet.
PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.
1 The Challenges Facing New Generation Capacity An overview and discussion Paolo Gaio Westinghouse International NPP.
UNRESTRICTED Financing of Nuclear Power Ala Alizadeh Atomic Energy of Canada Limited Nuclear Infrastructure Milestones Workshop November 2007 IAEA - Vienna.
Advancing the Commercialization of Small Modular Reactors Michael Kurth American Nuclear Society & Washington Internship for Students of Engineering.
IS THERE AN ENERGY CRISIS? David Brewer, BA., ACMA Director General Confederation of UK Coal Producers Presented to RICS Minerals and Waste Management.
What is killing the Nuclear Renaissance? Presentation at 10th IAEE European Conference Vienna, September 7-10, 2009 Steve Thomas
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
NUCLEAR POWER FUTURE, PROS, & CONS. WHAT IS NUCLEAR POWER?
OVERVIEW: Definition Types of nuclear reactions First commercial application Mechanism & Brief History Advantages and Disadvantages Facts of Nuclear energy.
Nuclear Power Isar Plant - Germany Diablo Canyon - California.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Energy Policy Conundrum Dependence on foreign supplies of oil and natural gas as an “economic” and a “national security” issue Oil shock in 2005 was primarily-demand.
Mary Alice Hayward Vice President, Strategy, Government and International Affairs AREVA, Inc. Williams Mullen Alternative Energy Forum May 26, 2011 Nuclear.
Health Hazards of not Going Nuclear Understanding the “waste” issues Load Following capabilities – can they? Status of Nuclear Technology Economics.
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
Status: Karsten Brinkmann PowerMex-CHP_CO2 bensheim engineers CHP – one Possibility to reduce CO 2 Karsten Brinkmann Promotion for CHP Berlin.
The Nuclear Renaissance Dr. Charles K. Ebinger Director, Energy Security Initiative Brookings.
Building a nuclear future Recent developments By Bill Bryce, Interim Chairman NIA King’s College, London 27 February 2007.
The PBMR, Nuclear Power and Climate Change Thomas Auf der Heyde Technikon Witwatersrand.
Sustainable Development Programme Social Science Research Priorities for Nuclear Power Malcolm Grimston Associate Fellow PSI Conference: Projects and Policies.
Ashley Finan, 2006 Page 1 Nuclear Energy and Oil Sands? Ashley Finan Massachusetts Institute of Technology Department of Nuclear Science & Engineering.
Nuclear Energy in Korea
Department of Nuclear Energy International Atomic Energy Agency Nuclear Power in the 21 st Century: Status and Trends in Advanced Nuclear Technology Development.
Spain: Can we give up any of the primary energy sources? Alejo Vidal-Quadras Roca Vice-President of the European Parliament Member of the Industry, Energy.
[Legislative] [Scottish Policy] Non Fossil Fuel Obligation (NFFO) - Equivalent to SRO in Scotland -Subsidies for renewable energy plants -Funded by Fossil.
Why consider other Energy options for SingaporeWhy consider other Energy options for Singapore? In electricity tariffs in Singapore went up by 21.
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
Nuclear Power Plant New Build Activity: A Market Overview
Steven Biegalski, Ph.D., P.E. Director, Nuclear Engineering Teaching Laboratory Associate Professor, Mechanical Engineering Dusting off the Atom: Nuclear.
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
1 BULATOM - New Build prospects in the UK New Build prospects in the UK International Nuclear Forum Bulgarian Nuclear Energy – National, Regional and World.
Current Status and Challenging Issues of Nuclear Energy in Korea Park, Yong Taek President & CEO Korea Power Engineering Company, Inc. 18th World Energy.
Nuclear power: A cheap option? Westminster Keynote Seminar October 19 th 2009, Portcullis House Steve Thomas PSIRU (
Climate and Energy at a Crossroads Michael Shellenberger and Ted Nordhaus: Breakthrough Institute Kakushin is Japanese for “radical innovation and renewal”
A Presentation by Mattie Kennedy.  Japan is only 16% energy self-sufficient  Japan has the 3 rd largest nuclear production  Japan is the largest.
ENERGY FOR THE 21 ST CENTURY the Potential for Nuclear Power Luis Echávarri Director-General, OECD Nuclear Energy Agency IAEA Scientific Forum at the General.
NS4054 Fall Term 2015 Nuclear Rebound?. Overview Oxford Analytica, “Nuclear Industry Will Rebound,” November 13, 2013 Nuclear power seems to be making.
NS4054 Fall Term 2015 North America Energy Trilemma.
AMBITIOUS TARGETS FOR ENERGY RD & D MEETING PLANETARY EMERGENCIES.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
Decarbonising Australia’s Electricity Supply The role for small modular nuclear reactors Ben Heard Founder – Decarbonise SA Director – ThinkClimate Consulting.
Oil Sands & Nuclear Energy: Our Integrated Energy Vision Presentation for: Energy Roundtable, Calgary Presentation by Wayne Henuset, Director September.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
Present Situation 1 Present Situation 1 Developed countries are not reducing their emissions in such a way to reach the goals of the Kyoto Protocol commitment.
Nuclear versus Coal plus CCS Bob van der Zwaan (ECN and Columbia University) with Massimo Tavoni (FEEM and Princeton University) International Energy Workshop.
AREVA’s Reactor Projects: Building on Experience Kathy Williams, Chief Financial Officer AREVA Inc. July 29, 2014.
Chapter 4 An Enduring Energy Future. Cont. キ Central electric generating stations will continue to be part of the electricity supply system in order.
The Urgency to Re-Invent Nuclear Power in the U.S.
Nuclear Power Economics and Project Structuring 2017 Edition
Global Energy Problems and Counter Policies and Measures of Korea
Sustainability-oriented EU Taxes: A European Nuclear Power Tax
British Nuclear Power Policy 2016 Does it actually exist?
IAEA International Conference on Fifty Years of Nuclear Power – The next Fifty Years Moscow - Obninsk, Russian Federation - June 28, 2004 Nuclear.
11 October 2010 Malcolm Lee Energy and Commercial Manager
NS4960 Spring Term 2018 Nuclear Rebound?
NEI Perspectives on Small Modular Reactors
Energy 2020: A Strategy for competitive, sustainable and secure energy
Time to cancel Hinkley Point C
Presentation transcript:

Acumen7 1 Accelerating UK Nuclear New Build Tony Roulstone July 2006

2 Contents Background; Setting the conditions for success; Why is time important? Challenge for UK industry; Is the answer to the nuclear power gap - Modular design & Off site construction?

3 Background Three cycles of nuclear build: oMagnox 11 stations3 GWe1960 & 70’s oAGR7 plants 8 GWE1970 & 80’s oPWR1 plant1.2GWe1990s Nuclear contribution to UK electricity supply declining from ~25% to ~3% over the period 2000 – 2020 as first Magnox then AGRs close; Energy Reviews: o2002/3 promoted energy saving & wind/wave providing subsidies through supply obligations - 10% renewables. o2005/6 considering fall-off in UK oil & gas, security of supply & how to meet environmental targets.

4 Nuclear debate – drivers & inhibitors New Nuclear? Carbon Emissions Energy Security Stable & competitive electricity price Waste disposal Capital Costs uncertain & large Doubts about Nuclear Safety Terrorism DriversInhibitors

5 Setting the conditions for success Clear understanding by public of the need for new nuclear; Waste disposal policy; Planning & licensing modernisation; Transitional incentive for nuclear re-start; Clarity on electricity market including use of carbon credits.

6 UK programme assumptions Nuclear new build programme ‘like with like’ 10GWe; On existing licensed sites - British Energy & NDA ex Magnox; Privately funded & managed; Modern standard foreign plant – one of top 4 Gen III+ designs; Major public enquiry for the first station - with only site specific issues being considered for later stations.

7 Nuclear power sites

8 Generation III+ candidates for UK Candidate systems for UK each based on a successful international design with the latest safety features: ACR 1000 AECLCanada AP1000 WestinghouseUS ESBWRGEUS EPRArevaFrance

9 ACR 1000 – Atomic Energy of Canada 1000 MWe heavy water reactor derived from successful CANDU design built in Canada, Rumania & China; Cycle efficiency – 36% Capacity factor - 90% based on CANDU-6; Design life - 60 years; Construction cycle – 42 months; Yet to receive safety certification;

10 AP Westinghouse 1GWe simplified passive PWR derived from CE & Westinghouse designs with over 100 reactors in US, Europe & Far East; Cycle efficiency – 33%; Capacity factor - 90% based on PWR family record; Design life - 60 years; Construction cycle – 36 months; US NRC design certificated; Selected by US utilities for NuStart applications made for site licences.

11 ESBR - GE 1500 MWe boiling light water reactor evolved from ABWR built in large numbers in US, Sweden & Japan; Cycle efficiency – 36%; Capacity factor - 90% based on ABWR experience; Design life - 60 years; Construction cycle – 45 months; NRC design certification in process; Selected by utilities in US for NuStart.

12 EPR - Areva 1600 MWe light water reactor evolved from proven French N4 & German Konvoi designs; Cycle efficiency - 36%; Capacity factor - 92% improving on N4 record; Design life - 60 years; 42 month construction cycle: Designed to EU safety standards; Being built at Olkiluoto in Finland & Flamville in France.

13 Why is time important – for Investor? Individual build timescales for stations 2 years delay & 10% cost => +£250m investment +15% through life costs 1GWe plant £1bn cost Build time 4 &1 yr

14 Why is time important – for HMG? Long timescale of re-starting nuclear build & enquiry ~ 10 years to first electricity; Constrains of capacity & build timescale mean oFurther 20 years to replace current nuclear capacity i.e. by oDecommissioning of current stations opens up carbon free energy gap lasting many years.

15 Challenge for UK industry Previous Gas reactors – too slow and very expensive; Cost overruns on major infrastructure projects – Wembley, West Coast Mainline etc.; Loss of experienced & specialist nuclear engineers; Scale & complexity of programme – multiple stations geographically dispersed, in same time frame.

16 Conventional site based approach Standard 8 Reactors 1.2GWe Capacity constraint - no more than 2 sites at any one time Programme timescale 25 years

17 An Alternative Modular Design & Off-site 10 1GWe No parallel capacity constraints Programme timescale 13 years

18 Capacity increase

19 Facing the issues – discussion topic Could modular build & off site construction be the answer? oNew plants designed for modular & shorter construction; oTake best nuclear construction practice from anywhere in the world – China & Korea? oLearn from other major projects using build off site techniques; oFactory infrastructure & logistics? oRadical programme coordination requirements.