Petroleum Engineering 406

Slides:



Advertisements
Similar presentations
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Advertisements

PETE 411 Well Drilling Lesson 17 Casing Design.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
Part 2.2 Well Control. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand well control.
Petroleum Engineering 406
Drilling Engineering – PE311 Circulating System
MC 252 #1 – Macondo Prospect OCS-G Well Control Simulation Results April 29, 2010.
Petroleum Engineering 406 Lesson 3 Well Control. Read Well Control Manual –Chapter 7-8 Homework 2 Due Jan. 30, 2001.
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 17 Flow Drilling Mudcap Drilling Snub Drilling Closed Systems Read: UDM Chapter pages
RIG COMPONENTS--Definitions
DRILLING ENGINEERING Well Control.
MPD Managed Pressure Drilling GF Landsbyen Outline What is MPD Why MPD Conventional drilling vs MPD.
Well Control Gas Solubility.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
Trouble in the Gulf Deepwater Horizon
PETE 411 Well Drilling Lesson 5 Hole Problems.
Petroleum Engineering 406
Removing 36 hours from a workover Optimising rig time using LWIV & eRED technology Presented by: Andy Skinner Date: 9 th March 2011 Slide 1.
Petroleum Engineering 411 Well Drilling
BASIC MUD LOGGING.
PETE 411 Well Drilling Lesson 23 Gas Cut Mud.
Preliminary Reservoir Model MC252 6-July DRAFT Outline Modelling approach & purpose Input Data & Model −Rock & Fluid Properties −Layering −Aquifer.
Lesson 3 The Rig - Drilling Equipment
Lesson 8 Offshore Drilling
Confidential to SMD JIP
Drilling for Oil.
Lesson 25 Well Control, cont’d
Trouble in the Gulf Deepwater Horizon
Petroleum Engineering 406 Floating Drilling
Offshore Drilling Operations Jeff Bugden Canada-Newfoundland Offshore Petroleum Board.
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
Dual Gradient Drilling Basic Technology Confidential to DGD JIP
Egypt / Mediterranean Sea Loss of Well Control and Emergency Response
25-26 August 1999Well Control Conference of the Americas Greater Kick Tolerance and Fewer Casing Strings Make Dual Gradient Drilling a Winner Schubert,
1 Petroleum Engineering 406 Lesson 13 Shallow Water Flows.
Gas Lift Design Philosophy for Chevron’s Subsea Developments
MC 252 Junk Shot Peer Assist – 6 May 2010 Report of Findings 07 May 2010.
Lesson 26 * Well Control * * Variable Geometry *
Dual Gradient Drilling Basic Technology
Petroleum Engineering 406 Lesson 4 Well Control. Read Well Control Manual –Chapter 9 Homework 2 Due Feb. 3, 1999.
Casing Design.
TAMU-Petroleum Engineering
Registration Fee : This fee does not include 7% VAT, accommodation, and transportation, but include 2 break and a lunch during the session day, instruction.
Scene: PS Complication (A) The well is being.
Isolation Valve Installation Readiness Trevor Smith/Mark Nichols 11 May 2010 MC 252 Incident Response.
NESSE SBM#6 IWC - Intelligent Well Completions Installation & Well Control Challenges Benni Toldo - Completions Engineer Woodside - Perth, Australia.
Oceans and Oil Spills. History of the Gulf Oil Spill Explosion kills 11 men on rig on April 22, 2010 The Entire rig sinks on April 23, 2010 A customized.
Petroleum Engineering 406 Floating Drilling
IADC Application Category Category A – Managed Pressure Drilling (MPD) Drilling with returns to surface using equivalent mud weight that is maintained.
Lesson 21 Prediction of Abnormal Pore Pressure
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Petroleum Engineering 411 Well Drilling
Lecture 6 Well Drilling Fall Drilling can be at Every Corner of the Earth!
Post Macondo Negative Pressure Testing for Offshore Drilling
Section 6-T14N-R94W Sweetwater County, Wyoming 13000’ Almond Test April 24 th, 2010 James Benson Kristin Carter Patrick Gardner Brandon Heiner Aaron Bounds.
The Case History of an Underground Flow Offshore Texas Developed by John Rogers Smith, P.E., Ph.D. Louisiana State University Funded by Minerals Management.
oil Housing Drilling Floor Derrick Conductor 30” (or 36”) (Jet Cleaning.
Well Control Rule Lakeisha Harrison, Chief, Regulations and Standards Branch, Office of Offshore Regulatory Programs, BSEE July 2016 “To promote safety,
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 1321 Oil-Field Hydraulics Chapter 5 Blowout Prevention Equipment.
The SPE Foundation through member donations
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Cementing How it is Done
INSTRUCTOR © 2017, John R. Fanchi
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Subsea 100 Global Services Products Presentation
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Casing Design Workshop
Design Calculations Combination Strings
Presentation transcript:

Petroleum Engineering 406 Lesson 7 Well Control Shallow gas and Subsea Well Control

Read Well Control Manual Chapter 10,15

Shallow Gas Many shallow gas sands are abnormally pressured Total pressure (psi) may be low high EMW e.g. FP = 452 psi (8.7 ppg eq.) at 1000’ Drill with 9.0 ppg mud - 0.3 ppg overbalanced only 16 psi = 35’ of fluid

Shallow Gas If we shut-in on kick we lose circulation and possibly broach to surface

Shallow Gas Kicks Pick up Kelly until lower kelly cock clears rotary Shut down pumps Check for flow If flowing, open the down wind diverter valve Close annular

Shallow Gas Kicks Start circulating heavy mud with both pumps If all heavy mud used up, pump all mud in mud pits When this mud is gone, pump sea water Continue until well is under control may deplete or bridge

Subsea Well Control Floating rigs BOP stack on sea floor Communication from the wellbore to surface through riser

Subsea Well control Kill Line Choke Line Booster Line BOP

Subsea Well control Riser is not designed to contain pressure If the riser is evacuated, it will collapse There is a telescoping joint at the top Choke and kill lines to circulate kicks through PVT and flow indicators affected by heave of vessel

Effect of choke and kill line Possibly high CLFP during kicks u-tube effect as gas hits choke line Gas in top of BOP stack Kill riser after killing well