Form screeds and granolithic finishes. Learning outcomes The purpose of damp proof membranes The recommended area of separate construction flooring that.

Slides:



Advertisements
Similar presentations
FLOOR FINISHES Screeds Terrazzo (in-situ type) Ceramic Tiling
Advertisements

NGfL CYMRU GCaD FLOOR COVERINGS.
Internal solid plastering
Concrete Technology Finishing Concrete Joints in Concrete Lecture 20
Unit 9 Finishes Teaching Objectives 1. Have basic idea of finishes 2. Understanding something about wall finishes, floor finishes and ceiling finishes.
INTERNAL PLASTERING.
Materials used in the external walls. Brick Bricks are probably the oldest manufactured material we have today. Although the method of production has.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Walls Ron Gatepain constructionsite.
STAIRS 3 rd YEAR TRADE Lesson One M.S. MARTIN March 2005 Reviewed Feb 2006 Reviewed Jan 2011 M.S. MARTIN March 2005 Reviewed Feb 2006 Reviewed Jan 2011.
Lesson Summary M. S. Martin 21/11/07.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Private Stairway A private stairway is a series of steps with straight nosings on plan intended for use solely in connection with one dwelling. Tread Newel.
Stairs Terminology and Design Rules
Stair Design Weekend Cabin Retreat Project
STAIRS AND STAIR FRAMING
BCT 104 Construction Math Stair Calculations. Stair Codes Important Residential Stair Codes 1. The maximum stair riser is 8". The minimum is 4". 2. The.
`Prepared by Ricardo Brown  Describe what stair construction is.  Define terms associated with stair construction.  Calculate the unit rise, unit.
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
CLADDING / VENERING OF INTERIOR AND EXTERIOR WALL SURFACES WITH MASONRY STONE CLADDING BRICK CLADDING.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Floor Screeding Lesson no 1.
Concrete
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
17/05/2015Dave Winchester Jan 2011 Dry Dashing Dry Dashing.
KOECH KIPLANGAT JOSEPH ADM NO 2012/BC/25432 CLASS 2012BCBC1B.
Floor Systems and Foundation Support
Building Foundations Foundation Walls.
External Plastering Plain Float Finishes. Backgrounds Concrete blocks Brick E.m.l. Cement boards.
CONSTRUCTING A FIVE CABIN LATRINE
School of the Built Environment Construction Technology D19SC Unit 4 SUBSTRUCTURE DESIGN – WALLS FLOORS & BASEMENTS 1 Unit 4 SUBSTRUCTURE DESIGN - FLOORS,
ARCH 243 CLADDING OF WALLS. CLADDING / VENERING OF WALL SURFACES PLASTER STONE CERAMIC –BRICK METAL GLASS PLASTIC WOOD.
STAIRS AND STAIR FRAMING
Intro to Concrete 18.0 & 19.0 Class notes.
Dry lining by direct bond – overview
Wood Construction Materials Hardwood Comes from deciduous trees such as oak, birch, walnut, maple, and hickory.
What goes up and down but never moves?
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
Assignment By Ryan Shaw. Tools and Equipment Trowel- used for applying plaster Hawk- used for holding plaster whilst plastering Float- gives good.
RENAISSANC E CARPET TILES_.  INTRODUCTION_  BENEFITS_  SUGGESTED SPECIFICATION_  INSTALLATION INSTRUCTIONS_  MAINTENANCE PROCEDURES_  TECHNICAL.

TAKE NOTE ON THE ORDER OF PROCEDURE FOR CONSTRUCTION OF THE LAMINATE COUNTERTOP. Countertop Procedures.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
COMPACT SHEETING SARLON COMPACT UNI. INTRODUCTION  Compact vinyl flooring contribute to lowering noise disturbance within a building in a number of ways.
COMPACT SHEETING SURESTEP STAR. INTRODUCTION  Surestep is a 2m wide glass fibre-mat reinforced compact antistatic vinyl floor covering, featuring a 0.7mm.
STATIC CONTROL TILES & SHEETING PRIMO SD. INTRODUCTION  Static Dissipative flooring is essential for protecting sensitive equipment from static charge.
Making Made from Scratch Concrete Stepping Stones Created by: Joan Jackson, Tiffany Prather and Dr. Frank Flanders Agriculture Education Curriculum Office.
Pitched Roof By PATEL ANKITKUMAR H.
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
Demonstrate Concrete Skills Form A wood or metal structure that confines concrete to the desired shape until it hardens.
Substrate Identification Floors. Principal Substrates T & G floorboards Flooring grade boards Concrete Screeded concrete Tile Backer Boards Under Floor/Under.
Weber Tile Fixing.
CONCRETE AND SUSPENDED TIMBER
Carry Out Concreting to Simple Forms
CLADDING / VENERING OF INTERIOR AND EXTERIOR WALL SURFACES WITH MASONRY STONE CLADDING BRICK CLADDING.
UPPER FLOORS TIMBER AND CONCRETE.
Substructure Construction Sequence
DAMP-PROOFING AND WATER-PROOFING COURSE
FLOORS Introduction: The purpose of a floor is to provide a level surface capable of supporting the occupants of a building, equipment and sometimes internal.
Building Construction I Sofia Sebastian 1
Tapiflex Self-adhesive
Building Construction I Sofia Sebastian 1
Ag System Technology II
Building Construction I Sofia Sebastian 1
Floor screeding.
Student: xxxxxxxxx AEC 204 Lab December 5, 2006
Straight run stairs A stairway that has no turns..
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Presentation transcript:

form screeds and granolithic finishes

Learning outcomes The purpose of damp proof membranes The recommended area of separate construction flooring that can be laid without an expansion strip? The thickness of a Monolithic floor

The materials used in granolithic work include granite chippings 6 mm to dust, and Ordinary Portland Cement Granite chippings and cement are mixed by volume in the ratio5 parts to 2

Question The purpose of damp proof membranes is to: Answer prevent damp rising through the structure

What is the recommended area of separate construction flooring that can be laid without an expansion strip? Answer 14 square metres Expansion strip

form screeds and granolithic finishes Monolithic systems tend to be the most common methods it fits better with the nature of construction and the set and leave approach of concrete. In this method a screed is applied to a previously laid concrete base within 3 hours of the base being laid Monolithic thickness is from 20mm Monolithic

An unbonded floor is where no bond to the concrete base is possible owing to its condition. Minimum thickness is 75mm. A number of different forms of floor construction are included in this type, and are often grouped on their own, e.g. laying a screed on a damp-proof sheet membrane.

Floating screed An Floating screed floor is where no bond to the concrete base is possible owing to its condition. Minimum thickness is 65mm. A number of different forms of floor construction are included in this type, and are often grouped on their own, e.g. laying a creed on a damp- proof sheet membrane, and laying a floor on a layer of insulation

Preparation of floors Remove all loose particles and high points on the floor Brush all the area to remove dust For certain floor surfaces, a mix of cement slurry and P.V.A can be brushed into the surface Smooth surface should be scrabbled to form a key

CAUSEEFFECT Poor preparation of sub-base.Cracking and lack of bond. Mix too dry.Hard to lay; gives weak finish. Too much cement.Shrinkage cracks. Too little cement.Will break down when load applied. Too much water.Hard to form flat surface; may shrink and be weak. Poor material mix.Could leave pockets of sand with no cement, or vice versa. Over-trowelling/trowelling too soon.Brings water to the surface with cement, which is know as laitance Poor curing.Weakens surface.

Learning outcomes The use of a storey rod How to form Granolithic coves Why riser boards are cut to a splay:

Nosing line Floor line Spirit level Storey Rod Straight edge resting on nails Nails Tread Riser

Fix riser into position Fix bottom riser Use a long straight edge to line in other boards Total Going Total rise Treads and risers are in the ratio of 2:1 I.e. for every inch you rise you tread,2inch Riser of 6” = tread of 12” Total going equal the proposed length of travel Total riser equals the distance travelled from the floor

Stringer Struts used to wedge stringer into position Riser board Fixing blocks Fixing riser boards

Laying a granolithic staircase Set out Fix riser boards and stringer Working on alternative steps Fill in the treads with granate and trowel to a smooth finish When material has dried remove riser boards and fill in the missing treads Face up the risers Struts Stringer Struts

Coved cement skirting can be formed in cement/sand screeds and granolithic screeds. They are usually formed by running using skirting or coving trowels in conjunction with battens or screed grounds.