EC1 Lodz - City of Culture Project coordinator of New Centre of Lodz City Council Resolution No. XVII/279/07 of 28.08.2007r. on the adoption of the Programme.

Slides:



Advertisements
Similar presentations
Stimulating Entrepreneurship in Rural Areas of Latvia.
Advertisements

EURORAIL Project Organizational model. EURORAIL Project Initiator: Ministry of transport and communications of Ukraine Lviv Oblast State Administration.
NEW CENTRE OF LODZ PROGRAMME PRESENTATION Principles of the New Centre of Lodz Programme 2. The objective of the New Centre of Lodz Programme The.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Manhattanville in West Harlem. Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use.
Mourad Loulou, Tunisia Section Chair 1 Mourad Loulou Tunisia Section Chair IEEE Tunisia Section.
The Styrian S-Bahn project - more public transport for the region DI Werner Reiterlehner Fachabteilung 18A, Austrian Province of Styria.
Slide 1 Karl-Heinz Posch: Mobility guidebook for new city development in Vienna Senior Consultant FGM-AMOR Coordinator MAX
Regione Toscana Accessibility and logistics to the competitiveness of the Tuscan territory Enrico Becattini - Responsible of P.O. Integrated system to.
REALISING BOSNIA AND HERZEGOVINAS EUROPEAN POTENTIAL: FROM WAR ECONOMY TO CREDITWORTHINESS AND SUSTAINABILITY MACRO AND FISCAL FRAMEWORK Ljerka Marić,
The Intelligent Energy – Europe Programme at a glance
1 7 th Progress Report: The regional and urban dimension of Europe 2020 Lewis Dijkstra Deputy Head of the Analysis Unit DG for Regional Policy European.
European Union Cohesion Policy
An accessible and attractive region: to improve internal and external transport links Aleksandrs Antonovs EU Funds Managing Authority in Latvia.
1 DG Regio Evaluation Network Meeting Albert Borschette, Brussels, 14 October 2010 Ex post evaluation of Interreg III - Presentation of Final Results Pasi.
1. 2 Why are Result & Impact Indicators Needed? To better understand the positive/negative results of EC aid. The main questions are: 1.What change is.
POLISH PRESIDENCY IN THE EU: COHESION POLICY AND EVALUATION-RELATED ACTIVITIES Presentation of Objectives and Programme Stanisław Bienias, Ministry of.
Enlargement Regional Programmes ReSPA Your new partner for a better Civil Service Blerta Selenica Governing Board Member Brussels, 31st March 2011.
Target setting for the SEE 2020 strategy Jahorina, Bosnia and Herzegovina September 11 th
Year 6 mental test 10 second questions
May 21, 2014 Multilevel governance & community development: The district approach in the Netherlands Els Tieman Head of the department for district approach.
Contents Basic information PPP projects in Poznan Western Gate Car Park projects Za Bramką Project Golf Course.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Rochester Riverside – Sustainable brownfield development Fifth European Conference on Sustainable Cities & Towns 21 March 2007 Sarah Beck Project Manager.
Break Time Remaining 10:00.
Andrew McNaughton 1 Radical Change is Entirely Possible! 2 nd November 2011.
| | 1 Intermodality Air/Rail Intermodality air/rail at Munich Airport – reality and vision Flughafen München GmbH Dr. Wilhelm Wolters.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
THE ROLE OF INTERNATIONAL RAILWAY STATIONS IN AN ENLARGED EUROPEAN UNION Tamás Fleischer Institute for World Economics of the Hungarian Academy of Sciences.
2 |SharePoint Saturday New York City
Green Eggs and Ham.
15. Oktober Oktober Oktober 2012.
Trustee Financial Training 1. Agenda: 1.Overview of the Foundation 2.Define and discuss University-controlled Activities 3.Track a University-controlled.
Part-financed by the European Union (European Regional Development Fund) From expectations to contributions towards Rail Baltica development in Kaunas.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 Tracking Innovation in NC Patterns and Implications for NC's Eastern Region John Hardin, Executive Director NC Board of Science & Technology
Ministry of Enterprise, Energy and Communications Sweden Getting a grip on the Green Corridors Jerker Sjögren Green Corridors Stakeholders Forum Tallinn.
25 seconds left…...
Subtraction: Adding UP
5 minutes.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. Global Business and Accounting Chapter 15.
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Innovative solutions in rights of way to support broadband development Antti Kohtala Ministry of Transport and Communications Finland Digital Agenda Assembly,
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
Департамент внешнеэкономических и международных связей города Москвы Moscow mega-projects fincentermoscow.comEvgeny DRIDZE.
Transport Sustainable Mobility and Integrated Planning in Urban Areas: Trade Union Dialogue with Local Authorities Day 2: 5th February 2013, SESSION 1:
THE CIVITAS INITIATIVE IS CO-FINANCED BY THE EUROPEAN UNION Promoting Sustainable Urban Mobility with CIVITAS.
1 Program of construction the high speed lines in Poland Warsaw, r.
Prague Integrated Transport (PID).  Prague - area 496 km 2 population 1.2 mil. distance of the city boundary from the centre is 10 km to the north, 18.
Transport Update Chris Carter Transport Strategy Manager.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
Sustainable public transport – electric transport development project for the capital.
European Regional Development Fund
Presentation transcript:

EC1 Lodz - City of Culture Project coordinator of New Centre of Lodz City Council Resolution No. XVII/279/07 of r. on the adoption of the Programme of Lodz New Centre City Council Resolution No. XII/0199/07 of r. on the revitalization of EC1 and its adaptation for the cultural and artistic purposes City Council Resolution No. XXX/588/08 of r. on the establishment and the statute of a cultural institution under the name "EC1 Lodz- City of Culture. " Local government cultural institution was created under a contract entered into between the City of Lodz and the Foundation of World Art in Lodz. The mission of the institution is: Redevelopment EC1 Coordination of project work NCL

The tasks of the EC 1 City of Culture are, among other things- Implementing the concept of the "underground city Feasibility study for the area of the "underground city " Prepare a schedule and perform all real time analysis of the project The development of functional programs - useful for individual objects and spaces which are part of the whole project Analyzes the impact of the project, both in terms of social and economic Completing the analysis of the project links to the strategy Piotrowska Street EC1 Lodz - City of Culture Project coordinator of New Centre of Lodz

The tasks of the EC 1 City of Culture are also: Analyzes the development of public spaces in the area, which includes draft Analysis of the creatures in the area of culture Analysis of communications solutions for the project Coordination of activities of partners in order to achieve synergies Factory Tunnel Lodz - Lodz Kaliska - preparing pre-feasibility study PR and marketing activities aimed at the widest possible information about the project and the construction, development and management of the project image Coordination and supervision of the various stages of the investment EC1 Lodz - City of Culture Project coordinator of New Centre of Lodz

New Center of Lodz The project "New Center of Lodz" is part of the urban planning program, the so- called brownfield sites. local revitalization program. It consists in building a new center of town, near railway station and the historic boat Factory CHP EC1. Interesting architecture, cultural events attract a diverse service and accessibility have a chance to transform the boat into an attractive metropolis.

Land with an area of 90 hectares, on which the creation of Lodz New Centre has been divided into two zones: the first (30 ha) will dominate the cultural and artistic feature in the second (60 hectares) will be implemented primarily commercial ventures. Załącznik do uchwały Rady Miejskiej nr XVII/279/07 z dnia 28 sierpnia 2007 New Center of Lodz

New Center of Łódź - urban architectural solutions - Feasibility Study - SYSTRA

New Centre of Lodz - view from the east

New Center of Lodz

development: SYSTRA/AREP/BBF New Center of Lodz

New Centre of Łódź Revitalisation of EC-1 and its adaptation for cultural and artistic purposes Paweł Żuromski EC-1 Revitalization Project Manager 11

EC-1 Revitalization and Adaptation for Cultural and Artistic Purposes Project EC-1 Revitalisation and Adaptation for Cultural and Artistic Purposes is co-financed by European Union from the European Regional Development Fund and by the City of Lodz. 12

EC-1 East – the inspiration THE INSPIRATION 13

EC-1 East – Present Time THE NOTHERN FACADE 14

EC-1 East - Concept of Revitalisation THE NOTHERN - EASTERN FACADE 15

EC-1 East – Present Time THE SOUTHERN FACADE 16

THE SOUTHERN FACADE 17

EC-1 East – Present Time THE ENGINE HALL - MAGIC INTERIOR … 18

EC-1 East - Concept of Revitalisation 19 ART GALLERY, LIBRARY, RESTAURANT

EC-1 East - Concept of Revitalisation PLANETARIUM - 3D CINEMA

EC-1 West – Past Time

EC-1 West – Present Time 22 WESTERN VIEW

EC-1 West - Concept of Revitalisation 23 WESTERN VIEW

EC-1 West - Concept of Revitalisation 24 NORTHERN WESTERN VIEW

EC-1 West - Concept of Revitalisation 25 COOLING TOWER

EC-1 West - Concept of Revitalisation 26 BOILER HOUSE

Multimodal hub Lodz - Fabryczna - A new communication system One of the key elements of the New Centre of Łódź will be creation of a multi- modal hub, whose heart will be moved underground and equipped to handle the high speed railway station Łódź Factory. The proposed hub will combine the functions of urban transport, regional and international level. Platforms at train station will be located at 16.5 m below ground level, while the positions for long-distance buses will be located at 8 m below ground level. At the same level will operate a network of underground streets.

Multimodal hub Lodz- Fabryczna - rebuilt development : Sener Sp. z o.o.

Implementation of the first sub-project - rebuilding the station Lodz Fabryczna with communication system development : SYSTRA/AREP/BBF

Transportation system - level-8m. Getting regional buses and long-distance and access taxi and private cars to underground car parks and places of passenger service. development : SYSTRA/AREP/BBF

Functional utility program - Level 0

Functional utility program - Level -8

Functional utility program - Level-11

Multimodal hub Lodz - Fabryczna - tender - the spatial extent of the investment

The cross-section of multi-modal hub Rails: the level of m Concourse, bus station, part of the trade: level-8m Objects of the New Center, the new tram line, bus MPK: level 0m development : SYSTRA/AREP/BBF

Multimodal hub Lodz - Fabryczna - after redevelopment. The concept of the functional - spatial development : SYSTRA/AREP/BBF

Station Lodz Fabryczna - view from Moniuszko Park (Węglowa Street) development : SYSTRA/AREP/BBF

Station Lodz Fabryczna - view from the north – Węglowa Street development : SYSTRA/AREP/BBF

Station Lodz FAbryczna - view towards the east development : SYSTRA/AREP/BBF

Station Lodz Fabryczna - green ramp, and square the eastern elevation of the station development : SYSTRA/AREP/BBF

Green wedge descends to the station development : SYSTRA/AREP/BBF

Multimodal hub Lodz Fabryczna - implementation schedule The tender for the reconstruction of the station Lodz Fabryczna Ongoing tender procedure. Select a contractor: Entering the project "Multi-modal interchanges at the train Lodz Fabryczna" on the indicative list of projects of the Ministry of Infrastructure and the Ministry of Regional Development The preliminary agreement signed at the Centre for EU Transport Projects provides funding in the amount of PLN 230 million Planned start of construction work at the station Lodz Fabryczna Planned completion of construction of multi-modal node at the station Lodz Fabryczna - the end of 2014.

Lodz rail hub today: consequence of unfinished investments Historical distribution of Lodz railway junction as a result of nineteenth-century strategy of the Russian Empire two not entirely integrated into the network elements (not connected to railway stations) the largest relic of the period - century partitions Development of the concept: War I, the first draft of the restructuring, after World War II revived the concept and the project was executed in 1968 tunnel with a radius of 400 meters along the streets Zielona and Narutowicza with a stopover between Piotrkowska street and Kosciuszki street 2002 Back to the concept in relation to the project of building high speed lines in the system in Poland, Warsaw - Lodz - Poznan / Wroclaw project took into account the economic realities 2010, Analysis of the construction of the rail tunnel under the city center on behalf of the Board of Roads and Transport in Lodz FOR IN Association of Communication Engineers and Technicians made. Diametral Tunnel - Development of the concept of the tunnel turn diametrical in Lodz

Trasy kolei Dużych Prędkości w Europie do 2020 roku – źródło: PKP PLK SA High-Speed Railways Western Europe and in Poland

High-Speed Railways - in 32 minutes from Lodz to Warsaw The Lodz will be the first station from the high speed railway from Warsaw to the west, which connects the capital city of Poznan and Wroclaw. Estimated travel time from Warsaw Central by high-speed train to Lodz is minutes.

Annex to the agreement on financing the feasibility study of a tunnel under the city center Area of the proposed rail corridors

EC-1, City of Culture Targowa Street Phone Fax Address for correspondence: Tymienieckiego 5 Street, Lodz, Poland Source: EC-1 Lodz, City of Culture