NAVFAC PACIFIC NEPA and Application During the Guam Relocation Efforts Teresa Bernhard Naval Facilities Engineering Command July 2007.

Slides:



Advertisements
Similar presentations
Guam Civilian/Military Task Force on Military Expansion Environmental Sub-Committee Meeting Environmental Sub-Committee Meeting March 26, 2007.
Advertisements

Identify Problems, Planning Objectives and Constraints.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
Current Conservation Issues in DoD L. Peter Boice OSD Conservation Team Leader Presented to NMFWA, Dallas TX March 2002.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Environmental Review: NEPA, TEPA and Tribes. NEPA – good and bad for Tribes Tribes can use as tool to slow, examine, participate in process and urge changes.
1 The National Environmental Policy Act in the Oil & Gas Industry.
Mr. Mark Calvo Director of the Government of Guam Military Buildup Office.
Welcome NIH Bethesda Campus Master Plan And Environmental Impact Statement National Environmental Policy Act Public Meeting April 8,
Foreign Affairs Security Training Center
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Army Doctrine Publication (ADP) 3-37; and Army
1 Welcome NIH Bethesda Campus Master Plan And Environmental Impact Statement National Environmental Policy Act Scoping Meeting February 28, 2012.
The National Environmental Policy Act (NEPA)
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
Negotiating the NEPA Maze: It Really Is Rocket Science Start.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Integrated Natural Resources Management Plan Development on Navy Installations in Southern California Coralie Cobb Natural Resources Specialist Southwest.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
“Training here to protect your tomorrow” CODEL Press Conference Maj Jason Johnston Public Affairs Officer.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Presented to: By: Date: Federal Aviation Administration Making Good Decisions in the Environmental Review Process 2012 Pacific Aviation Directors Workshop.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
Fort Bliss Army Growth and Force Structure Realignment Draft Environmental Impact Statement Public Meeting November 2009.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Cultural Resource Management in the Department of Defense September 29, 2005 Maureen Sullivan Federal Preservation Officer.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Marine Spatial Planning for Wave Energy Development in Oregon Kate Sherman, M.S. Candidate Marine Resource Management College of Earth, Ocean, and Atmospheric.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
MMS Alternative Energy Program November 28, 2007.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
Acquisition, Technology and Logistics The Department of Defense: Transforming the Business of Military Cultural Resource Data Brian Michael Lione Deputy.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Col Charles Corcoran, 3 WG/CC Maj Gary Wallace, 3 OSS/ADO Ms.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
The Maritime Alliance “Promoting the Maritime Community” “The Military in San Diego – Yesterday, Today, and Tomorrow” Captain Joseph Stuyvesant, CNRSW,
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
1 Welcome to the Public Scoping Meeting Environmental Impact Statement for the Sale of Plum Island, New York Welcome to the Public Scoping Meeting Environmental.
Isis Johnson Environmental Protection Specialist Bureau of Ocean Energy Management Office of Renewable Energy Programs April 28, 2016.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
NAVFAC PACIFIC March st North American Wildlife and Natural Resources Conference National Military Fish and Wildlife Association Marine Conservation.
Current Event Brief!.
Willow Meadows Civic Club Meeting September 13, 2011
ACA Conference - September 2017
Overview What is the CEQA environmental review process?
SEQRA as a Tool to Review Energy Projects
National Environmental Policy Act (NEPA)
NEPA Assignment Program Overview
Kodiak, Alaska Community Presentation 26 March 2019
Presentation transcript:

NAVFAC PACIFIC NEPA and Application During the Guam Relocation Efforts Teresa Bernhard Naval Facilities Engineering Command July 2007

2 Pre-Decisional-Draft Proposal Overview Environmental Planning Primer Setting The Scene For Force Re-Posturing In Guam Guam Marine Relocation EIS Successes and Remaining Challenges

3 Pre-Decisional-Draft Proposal Environmental Planning Primer

4 Pre-Decisional-Draft Proposal CE: EA: EIS: Actions which do not have, under normal circumstances...a significant impact on the human environment. Analysis of potential environmental impacts to determine whether to prepare an EIS or a FONSI. Documentation which provides full & unbiased discussion of significant environmental impacts and informs decision makers and the public of reasonable alternatives... NEPA: Categorical Exclusions Environmental Assessment Environ. Impact Statement level of NEPA analysis is determined by the action proponent environmental professional and the decision maker

5 Pre-Decisional-Draft Proposal EIS Process Public Scoping Meetings Prepare Draft EIS Draft EIS Notice of Availability Prepare Final EIS, including response to comments Final EIS Notice of Availability Notice of Intent (NOI) to prepare an EIS Implement Action Record of Decision Define Proposed Action and Alternatives Public Comment Period And Public Hearings No Decision Period

6 Pre-Decisional-Draft Proposal Environmental Impact Statement (EIS) Action-forcing device used for actions with the potential for significant environmental effects Comprehensive - must discuss: –impacts (direct, indirect and cumulative) –actions (connected, cumulative and similar) –reasonable alternatives (at a minimum the “no action alternative”) –Many of the rules for EIS will also apply to preparation of an EA

7 Pre-Decisional-Draft Proposal Environmental Impact Statement Specifics Public Participation - Required for EIS (NOI, DEIS, FEIS, public notice for ROD) SCOPING - early and open process to determine scope of issues to be addressed and to identify the significant issues related to a proposed action –As part of process, agency: invites proponent of action, affected Federal, State and local agencies, affected Indian Tribes, and other interested parties to participate –Following DEIS publication, re-invite comments at formal public hearing

8 Pre-Decisional-Draft Proposal Reasonable Alternatives Analysis Shows the comparison between all “reasonable” ways to conduct the action to fulfill “purpose and need.” Analysis from environmental consequences: scientific and analytic comparison of all pertinent impacts for each alternative under consideration. In other words, WHAT EFFECTS WILL EACH ALTERNATIVE HAVE ON MY ENVIRONMENTAL BASELINE.

9 Pre-Decisional-Draft Proposal The Record of Decision (ROD) Following FEIS, ROD is designed to ensure that agency decision makers explain the decision concise public document Summarizes the rationale and background for the decision Is legally binding IS NOT THE END. The goal is to execute the action: lawsuits and violations of mitigation agreements or permits can stop the action.

10 Pre-Decisional-Draft Proposal Making NEPA Work Toward The Project Involvement of environmental planners in: –the base development, –Platform acquisition, –IPL and, –ILS stages can reduce the complexity of environmental impacts, and hence the duration of the NEPA project. Upfront conservation planning can decrease cost of a NEPA project, prepare for mitigation and inform the design team of constraints –INRMPS, ICRMPS, encroachment studies the cost of these studies often is paid off by cost avoidance and timeliness later Early communication and partnering with the regulators prior to NEPA project NOI/NL Delegate authority to execute the process at the lowest level that wholly owns the operation

NAVFAC PACIFIC Setting the Scene

12 Pre-Decisional-Draft Proposal Guam’s prime asset is location Geography cannot be replicated Scene Setter 5,682 NM 2,285 NM 3,318 NM 2,694 NM 1,731 NM 1,083 NM 2,200 NM Hawaii Yokosuka Taiwan Sydney Guam San Diego, CA Jakarta Seoul Manila 1,388 NM Guam Population: 171,000 Present DoD population: 14,200 Future DoD population: 40,000 DoD owns 40,000 acres; 29% of island GovGuam owns 25,800 acres; 19% of island

13 Pre-Decisional-Draft Proposal WHY GUAM? PACOM Vision: Guam, as the furthest west US territory for basing in the Pacific, provides strategic flexibility, freedom of action, and prompt global action for the Global War on terrorism, peace and wartime engagement, and crisis response. …Guam may be further back, but it leaves us space from which to maneuver. The possibility of having these forces readily employable is uppermost in my mind. Admiral Fallon HAC testimony 8 Mar 06

14 Pre-Decisional-Draft Proposal Proposed Future Forces on Guam U.S. Navy COMNAVMARIANAS SSNs/Sub Tender Logistics Prepos Ships MSC Combat Stores Ships MSC Ammo Ships Maritime Prepo Ships H60s Transient CVN berthing HSVs Littoral Combat ship (Old 4350 AD/ 5230 Dep) (New≈≈ 5600 AD/ 5280 Dep) USAF 36 th Air Wing Rotational Bombers More Based Tankers More Periodic Fighters Global Hawk ( Old 1930 AD/ 2280 Dep) (New ≈4560 AD/ 3730 Dep) U.S. Army 1 x Battalion Air Defense (≈630 AD/ 950 Dep) USCG 225’ Buoy Tender 110’ Patrol Boat 25’ Response Boat – Small (140 AD/ 180 Dep) = New USMC III MEF Cmd Element Ground Combat Element Aviation Combat Element Combat Service Support Plus: Transient Units Visiting USMC & Allied Forces (New ≈8,000 AD/ 9000 Dep) Old Total: 6,420 Active Duty / 7,690 Dependents New Total: ≈18,930 Active Duty / 19,140 Dependents

15 Pre-Decisional-Draft Proposal NEPA Planning Considerations 2-3 year NEPA timeline required in order to facilitate FY 14 completion schedule Potential ramifications to timeline –Alternative Site Analysis –Cumulative Effects Analysis –Consultations –Mitigations Communication Plan (External-Internal) –Impacted Community –Congressional interests –Special interests groups –Internal (EPA, USFW, DOI, NOAA, DLA)

16 Pre-Decisional-Draft Proposal Guam Relocation EIS

17 Pre-Decisional-Draft Proposal

18 Pre-Decisional-Draft Proposal The Purpose and Need The purpose of the action is to: Fulfill U.S. government national security and alliance requirements in the Western Pacific Region Increase the strategic role of Guam and the Commonwealth of the Northern Mariana Islands through the relocation of U.S. forces The need for the action is to: Maintain the Department of Defense’s (DOD’s) capability to accomplish its mission in the Western Pacific Region Enhance capability to defend critical military assets Improve mission-critical, mission support, Improve support infrastructure and Expand operational readiness in the Western Pacific Region

19 Pre-Decisional-Draft Proposal The overall proposed action Relocate U.S. Marine Corps command, air, ground, and logistics units to Guam Enhance infrastructure and logistics capabilities for military training and operations Improve pier/waterfront infrastructure for transient nuclear aircraft carrier (CVN) berthing at Naval Base Guam

20 Pre-Decisional-Draft Proposal O N D J F M A M J J A S FY07FY08FY09FY10 SPEs Defined NEPA - EIS RCE for Topo Studies CVN inclusion Guam Master Plan Topographic Studies Additional Apra Harbor Plan CVN Master Planning Outside Gate Traffic Study – Baseline - ~12 mo Outside Gate Traffic Study – Mitigation - ~18 mo Water Capacity and Siting - ~11 mo Wastewater Capacity and Siting - ~11 mo Electrical - ~18 mo Solid Waste and Recycling - ~12 mo HAZMAT/HAZWASTE - ~11 mo CNMI Baseline and Lease Studies - ~30 mo Biological/Natural Resources CNMI - ~25 mo Cultural Resources CNMI - ~26 mo Biological/Natural Resources Guam- ~17 mo Cultural Resources Guam - ~18 mo Final Master Plan FRF Studies Okinawa Consolidation Plan Draft Master Plan USG SPE Utilities Studies Continuing CNMI mitigation consultations and land lease acquisition Specific Site Dredged Material Characterization/Disposal Permitting - ~15 mo CVN Studies (CVN Transient Berth & Army BMD TF included) Identifies impacts of CNMI alternatives to meet RCMP training shortfalls Quantitative Dive Surveys R/S, D/E - ~3 mo Coral HEA - ~18 mo Upland Disposal Site Surveys, Studies - ~12 mo USEPA Ocean Disposal site EIS - ~33 mo Notice of Intent Scoping Draft EIS Final EIS Tiger Team ReviewsDEIS Notice of AvailabilityPublic Comment Period (45 days) Tiger Team Reviews FEIS Notice of Availability Public Comment Period (30 days) Record of Decision (ROD) FD Concurrent Upland alternative (4x increase in disposal costs) required due to uncertainty with Ocean Disposal approval. RCMP Resourcing and Phasing Plan - ~13 mo

21 Pre-Decisional-Draft Proposal Environmental factors of interest Human Health and Life Issues –Safety –Quality of life –Effect on educational facilities –Effect on public health and social services –Labor-related issues –Increases in traffic –Utility requirements –Noise Government issues –Small business opportunities –Availability and cost of civilian housing Land use –Access to recreation locations –Effect on local fisherman/fishing industry –Effect on tourism and recreation –Population increase and associated effects Natural Resources –Wetlands –Coastal zone impacts –Endangered species –Marine resources – essential fish habitat, coral reefs, marine Mammals –Invasive species such as the brown tree snake –Wildlife habitat Cultural and archaeological –Chamorro interests – sacred burial grounds, cultural sites Environmental Conditions –Air quality –Water quality –Recharge of groundwater aquifers –Dredging and disposal requirements in Apra Harbor

22 Pre-Decisional-Draft Proposal Challenges Magnitude of Project Schedule Coordination of ongoing EISs that must both address DoD training in the Marianas –JGPO EIS –Mariana Islands Range Complex (MIRC) EIS –Kilo Wharf EIS –Andersen AFB –NW Field

23 Pre-Decisional-Draft Proposal Take-aways Committed to being good stewards of the environment Success involves –Outstanding communications –Open and on-going partnering Emphasize strategic communication Huge undertaking – very complex project

24 Pre-Decisional-Draft Proposal Questions?