1 Quality Control Program. 2 Objectives To know: To know: –How the QC Program is Doing –Effect of Specification Changes on the QC Program –Contractor.

Slides:



Advertisements
Similar presentations
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
Advertisements

2014 Washington Asphalt Conference “Specification Update & Initiatives” Joe DeVol Assistant State Materials Engineer State Materials Laboratory.
Section Cross Slope District 1 Your logo here.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
2015 State Aid Conference Ramsey County Office Arden Hills, Mn February 19, 2015.
Joe White (608) Wayne Chase (608) WisDOT Materials Management Section 1.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
QUALITY CONTROL More Makes Money Less Leads Losses
Amendments to the Specifications Discussion of Changes to the Concrete Materials Specifications.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
Intelligent Compaction Research & Development and QA Activities Richard B. Duval, P.E. Construction Research Engineer Infrastructure Research & Development.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Asphalt Quality Assurance Program
SB Certification for Mixture-Based Specification for Flexible Base Summary of Spec Test Procedures Actions to Take for Non-Compliance October 31, 2012.
EARTHWORK RECORD SYSTEM
Quality Control Testing
2002 FDOT/FTBA Construction Conference
03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural.
Phase II Training Briefed By [CA insert name] For Quality Assurance Personnel.
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 1 QMP Specifications QMP base aggregate QMP base aggregate Review and comment.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Asphalt QC 2000 The Adventure Begins….. Topics Terminology Specifications Sampling and Testing Reporting/CQR Who Does What? Lube & Oil Change All in 20.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
Developing a Mixture-Based Specification for Flexible Base.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.
Allen Hughes State Materials Office
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
STATEWIDE INITIATIVE TO BE CONSISTENT TO BE PREDICTABLE TO BE REPEATABLE.
Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
2014 NCR Construction Conference Materials Presentation John Brophy Jeff Michalski
Contractor having difficulties performing work Contract Default Read Spec section 8-9. Talk with DCE about options. Various letters of concern may come.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Contract Training Class I
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Contractor QC Wesley Glass Kentucky Transportation Cabinet 2007 KAHC/KYTC Meeting Bowling Green/Lexington, Kentucky.
Field Office Construction, Technical Assistance and Quality Assurance NEDC Construction Inspection for Field Office Activities USDA is an equal opportunity.
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Asphalt Pavement Training Conference “HMA Mix Designs on the QPL”
Inspector's Role and Responsibilities
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Inspector's Role and Responsibilities
QC Document Update Todd Shields, INDOT.
Acceptance Process for Manufactured Products by Certification:
Inspector's Role and Responsibilities
Construction Management
Navigating FDOT Specifications and Standards
Quality Control Personnel Training
QC Personnel Responsibilities
What is the UL QFCP? FCIA Webinar Presenters:
Project Development Quality Program QA/QC – What does ODOT need?
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Emulsion Task Force Meeting
Quality Assurance for Emulsified Asphalt Surface Treatments
Prime Factors for Successful Preservation Treatments
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Fiber Reinforced Polymer Systems
Presentation transcript:

1 Quality Control Program

2 Objectives To know: To know: –How the QC Program is Doing –Effect of Specification Changes on the QC Program –Contractor QC Plan Approval/ Revision/ Suspension Process –Roles and Responsibilities

Quality Assurance Procedure for Construction QAPC Personnel Qualification Final Project Materials Certification Independent Assurance Sampling Testing & Reporting Guide Lab Qualification CQC CTQP LQP Field Tests Lab Tests Mat. Cert. IA Procedure MM 5.4

4 QC Program…What did we learn?

Percentage of Projects Certified without Exceptions 2005  36% 2006  43% --OR-- Average number of Exceptions (per Projects with Exceptions) 2005   2.02 The overall result of the Program is fewer Exceptions

All Materials Overall, the exceptions for Documentation, Minimum Frequency, Non-Standard Material and Qualification are decreasing in occurrence. GOOD

Asphalt (Superpave) Material The occurrence of Minimum Frequency and Qualification reduced in 2006 GOOD

Concrete (Structural) Material The occurrence of Minimum Frequency reduced in 2006 GOOD

Earthwork Materials With the exceptions of Minimum Frequency, the numbers are going in the right direction GOOD

QC Samples Comparison QC Samples Comparison *QC Stabilized Subgrade samples have consistently increased comparison with V and R samples for the last 3 years GOOD Asphalt Concrete Embankment Subgrade Limerock

11 One thing we learned from the QC Program from a comparison standpoint… There have been some issues with the random number not coming up at the end of the concrete pour. In speaking with the State Concrete Engineer, the recommended process is to make the set of Independent Verification cylinders before the final truck leaves. In speaking with the State Concrete Engineer, the recommended process is to make the set of Independent Verification cylinders before the final truck leaves.

12 Technicians have the most difficulty in: 1. Capping Cylinders30% 2. Compressive Strength 25% 3. Drying of Aggregate 25% 4. Neoprene Caps 24% 5. LBR 21%

13 And now for something a little different

14 Remove Restrictions (R 2 ) Specifications & QC Program

15 Material Issues: Visual inspection for projects with less than 2000 tons of Type SP and FC (combined) Visual inspection for projects with less than 2000 tons of Type SP and FC (combined) 20-day LOT termination instead of 60-days 20-day LOT termination instead of 60-days District Independent Verification testing now includes a split sample District Independent Verification testing now includes a split sample No shutdown for QC MPR gradation failures on the #8 sieve No shutdown for QC MPR gradation failures on the #8 sieve Asphalt R 2 Specs

16 Asphalt R 2 Specs cont. Material Issues: TL-A mix design: paper verify only TL-A mix design: paper verify only Reduced aggregate requirements for TL-A & B Reduced aggregate requirements for TL-A & B Changed lab compaction for TL-B Changed lab compaction for TL-B 1% reduction in VMA for TL-A & B 1% reduction in VMA for TL-A & B No moisture testing for TL-A & B (use 0.5% anti-strip agent) No moisture testing for TL-A & B (use 0.5% anti-strip agent) New provisions for fractionated RAP New provisions for fractionated RAP

17 Acceptance issues: New acceptance option for TL-A & B New acceptance option for TL-A & B Option 1 – CQC as it now Option 1 – CQC as it now Option 2 – FDOT testing and reporting Option 2 – FDOT testing and reporting Contractor makes choice at pre- construction conference Contractor makes choice at pre- construction conference Asphalt R 2 Specs cont.

18 Acceptance issues: Option 2 specifics (TL-A and TL-B only) : Option 2 specifics (TL-A and TL-B only) : –FDOT samples randomly once/day –1 day = 1 SubLOT / 4 SubLOTs = 1 LOT –7-day max for a LOT –Randomly test one of the four SubLOTs –AC, gradation, density (no air voids) Asphalt R 2 Specs cont.

19 Asphalt R 2 Specs cont. Acceptance issues: Option 2 specifics (cont.): Option 2 specifics (cont.): –Uses acceptance table (two columns) –100% pay, no pay or remove and replace. –Reporting by FDOT. –No QC requirements. Plan, Lab, Personnel Plan, Lab, Personnel

20 Concrete R 2 Specs Spec 346 General effects: General effects: –Electronic delivery ticket –Either 4 x 8 inch or 6 x 12 inch cylinders are acceptable –Frequency changes Drilled Shafts: Drilled Shafts: –Slump range between 7.5 inches and 9.5 inches

21 Concrete R 2 Specs cont. Class I (Special) & II excluding Bridge Decks: Class I (Special) & II excluding Bridge Decks: –Fly ash or slag –Aggregate Gradations –Air entraining admixture is optional –Cementitious Material –Department may perform inspections in lieu of plastic properties test

22 Earthwork R 2 Specs For bike/shared use paths, sidewalks, & paved shoulders – –Reduces density test frequency by re- defining LOTs to 2000 ft or one day’s production (whichever is greater) – –“Witness & Hold” for Stabilizing Depth, Base Depth & Surface Irregularities – –Option to Eliminate LBR Sampling and Testing in Subgrade by using Pre-Designed Subgrade

23 Earthwork R 2 Specs cont. For all other roadway construction – –Allows Reduced Frequency for pipe backfill – –Eliminates Density Testing Outside Control Line – –Introduced “Witness & Hold” concept for Stabilizing Depth, Base Depth & Surface Irregularities

24 Break Time

25 Teleconference with Technical Experts

26 Contractor’s Quality Control Recap from the Puzzle Recap from the Puzzle Information from LIMS Information from LIMS EAR Process EAR Process Changes to QCP Changes to QCP QC Manager Philosophy QC Manager Philosophy Others: Who does what? Others: Who does what?

27 Contractor’s Quality Control Recap from the Puzzle Recap from the Puzzle Information from LIMS Information from LIMS EAR Process EAR Process Changes to QCP Changes to QCP QC Manager Philosophy QC Manager Philosophy Others: Who does what? Others: Who does what?

28 Laboratory Qualification Program Contractor’s QC Plan Producer QC Program Contractor QC Manual LIMS Access Constructio n Begins Certificatio n & Exceptions Testing Material Disposition Construction Begins

29 Contractor’s Quality Control Recap from the Puzzle Recap from the Puzzle Information from LIMS Information from LIMS EAR Process EAR Process Changes to QCP Changes to QCP QC Manager Philosophy QC Manager Philosophy Others: Who does what? Others: Who does what?

Contractor QCP Approval turn around time for Materials Offices Average Time (Days) 0ver 7 Days %No Statewide /63083/499

Suspended Plants of 408 plants suspended of 431 plants suspended

Category # 2005 # 2006 Total6564 Material not on Spec 33 Quality Control Plan Deficiency 41 Unapproved Source 63 Notified, No Action 00 Unidentified Reasons 5257 Untimely Info 00 Suspended QC Program

33 QC Test Reporting Time Days10.1% < 1 Day Days 9.45% < 1 Day DaysN/A

34 Contractor’s Quality Control Recap from the Puzzle Recap from the Puzzle Information from LIMS Information from LIMS EAR Process EAR Process Changes to QCP Changes to QCP QC Manager Philosophy QC Manager Philosophy Others: Who does what? Others: Who does what?

35 Defective Material on the Project Contractor Proposes to leave In place Contractor Forwards EAR & scope to PA PA confers with RE& Initiates DDM PA & RE Recommend Remove & Replace? PA fills out DDM Form section B Material is Removed & Replaced Yes

36 PA & RE Recommend Remove & Replace? No PA completes section B for forwards to DME DME determines EAR needed? Contractor Performs EAR & submits To PA PA forwards EAR To DME DME reviews And completes Section D Of DDM form DCE completes Section E Of DDM form Does DCE concur? DME finalizes Scope of EAR PA sends Approved scope to Contractor Yes

37 DME determines EAR needed? Does DCE concur? DCE completes Section E Of DDM form Yes Construction Determines Pay & PA completes Section G of DDM form No DME recommends Remove & Replace OR leave in place, & completes section C of DDM No Director, Office of Construction Completes section F of DDM

38 Contractor’s Quality Control Recap from the Puzzle Recap from the Puzzle Information from LIMS Information from LIMS EAR Process EAR Process Changes to QCP Changes to QCP QC Manager Philosophy QC Manager Philosophy Others: Who does what? Others: Who does what?

39 What do you include in the Contractor’s QC Plan?

40 Technicians Labs Producers Process Control Documentation Storage Material Handling Transportation Field Ops Failing Material Certification

41 Why is it important to change the QC Plan/ QC Program when there is a change?

Unresolved Deficiencies Technicians Labs Producers Process Control Documentation Storage Material Handling Transportation Field Ops Failing Material Certification Timely Info Repeated Failure Material Not controlled Non Responsive To Notice

43 Contractor’s Quality Control Recap from the Puzzle Recap from the Puzzle Information from LIMS Information from LIMS EAR Process EAR Process Changes to QCP Changes to QCP QC Manager Philosophy QC Manager Philosophy Others: Who does what? Others: Who does what?

44 QC Manager Role Overview Pre-Bid Pre- Construction Construction Post-Construction

45 Review Plan QC Needs Review Plan QC Needs Estimate QC Manpower Estimate QC Manpower Identify Qualified Subs Identify Qualified Subs Establish Rework Goals Establish Rework Goals QC Manager Role Overview Pre-bid QC Manager Role Overview Pre-bid

46 Prepare & Submit QC Plan Assure Techs, Labs, Plants are on the list Communicate with Department QC Manager Role Overview Pre-Construction QC Manager Role Overview Pre-Construction

47 Control the quality Administer QC Plan Monitor QC Activities & Evaluate Performance Provide Monthly Certification w/EXCEPTIONS Maintain Records Process DDM/EAR in time Assure LIMS data entry is up-to-date Provide Mfgr. certifications to the Dept. QC Manager Role Overview Construction QC Manager Role Overview Construction

48 Review completeness of Sampling/ Testing Review Completeness of LIMS reporting Assure all EAR’s/ DDM are closed Provide Final Construction Compliance with Specifications and Plans with EXCEPTIONS Warrantee Items QC Manager Role Overview Post-Construction QC Manager Role Overview Post-Construction

PA writes Deficiency Letters, copies SCTA QC Manager Suspension SCTA writes letter of warning to QC Mgr. Letter is valid for 365 days SCTA writes suspension letter to QC Mgr., notifies CTQP QC Mgr. Suspended* Yes 1 st letter of warning Deleted 2 nd warning letter within 365 days? No Yes Need for 3 rd letter w/in 365 days? No Both letters of warning Deleted

50 Contractor’s Quality Control Recap from the Puzzle Recap from the Puzzle Information from LIMS Information from LIMS EAR Process EAR Process Changes to QCP Changes to QCP QC Manager Philosophy QC Manager Philosophy Others: Who does what? Others: Who does what?

51 Producer Control the process Control the process Get Producer QC Program accepted Get Producer QC Program accepted Supply the material that meets contract requirements Supply the material that meets contract requirements Supply the material produced under approved QC Program Supply the material produced under approved QC Program Monitor & Update QC Program Monitor & Update QC Program Communicate with the Contractor QC Manager/ FDOT Communicate with the Contractor QC Manager/ FDOT

52 Project Administrator Prime Department contact Prime Department contact Coordinates & Administers Contractor QC Plan Coordinates & Administers Contractor QC Plan Assures QC sampling, testing, and documentation per contract Assures QC sampling, testing, and documentation per contract Prepares Project Administrator’s Material Statement w/ Exceptions Prepares Project Administrator’s Material Statement w/ Exceptions

53 Resident Engineer Contractor QC Plan Approval Contractor QC Plan Approval Contractor QC Plan Revision Approval Contractor QC Plan Revision Approval Contractor QC Plan Suspension Contractor QC Plan Suspension

54 District Construction Office Coordinates QC Manuals review Coordinates QC Manuals review Monitors disposition of defective material Monitors disposition of defective material Assures QC compliance by Contractor Assures QC compliance by Contractor

55 District Materials Office Provide technical support to PAs Provide technical support to PAs Assist in DDM/ EAR Assist in DDM/ EAR Accept & Administer Producer QC Program Accept & Administer Producer QC Program Review Contractor QC Plans & Manuals Review Contractor QC Plans & Manuals Maintain accurate Plant Information in LIMS Maintain accurate Plant Information in LIMS Add Producer QC Programs to MDMS Add Producer QC Programs to MDMS Perform IA activities Perform IA activities Assist in final project certification Assist in final project certification

56 State Construction Office Provide statewide support to QC Program Provide statewide support to QC Program Administer Contractor Quality Control Manual approval Administer Contractor Quality Control Manual approval Manage QC Manager Letters of warning & suspension Manage QC Manager Letters of warning & suspension

57 State Materials Office Provide statewide support to QC Program Provide statewide support to QC Program Mix Design Approval / Verification Mix Design Approval / Verification Producer QC Program approval Producer QC Program approval Final Project Material Certification (Full Federal Oversight) Final Project Material Certification (Full Federal Oversight)

58 Contractor Quality Control Information statematerialsoffice/

59

60 Questions Questions? Questions? Comments? Comments?