Contractor QC What is Required? 23 CFR 637
3
Contractor QC Frequency Guide Schedule Identification of Location for Sampling and Testing Specify attributes to be inspected
4
Contractor QC Quality Control sampling & testing may be used as part of acceptance decision provided that:
5
Contractor QC Qualified labs & personnel Validated by verification samples Evaluated by an IA program Establish a dispute resolution system
6
Contractor QC Kentucky’s Use of Contractor’s Results for Acceptance HMA Soil Embankment and Subgrade Concrete Pavement Concrete – Structural/Non Structural Aggregate Striping Bridge Coating
7
Contractor QC HMA – Well Established Attributes – Volumetrics & Density Sampling – Plant and Roadway Lot – Four Contractor/One State Quality Measure – Individual Value Pay – Incentive/Disincentive
8
Contractor QC Soil Embankment and Subgrade– Special Note Attributes – Density & Moisture Sampling - Roadway Lot – Four Contractor/One State Quality Measure – Individual Value Pay – Accept/Reject
9
Contractor QC Concrete Pavement – Special Note Attributes – Air, Slump, Temp, & Compressive Strength Sampling - Jobsite Lot – Eight Contractor/One State Quality Measure - PWL Pay – Incentive/Disincentive
10
Contractor QC Concrete Structural/Non Structural – Special Note Attributes – Air, Slump, Temp, & Compressive Strength Sampling - Jobsite Lot – Eight Contractor/One State Quality Measure – Individual Value Pay – Accept/Reject
11
Contractor QC Aggregate – Special Note Attributes – Gradation, Minus 200 and Density Sampling - Jobsite Lot – Four Contractor/One State Quality Measure – Individual Value Pay – Accept/Reject
12
Contractor QC Striping – Special Notes Attributes - Retroreflectivity Sampling - Roadway Lot – Segments (1/5 of days striping) Quality Measure – 80% exceed required minimum Pay - Disincentive
13
Contractor QC Bridge Coating – Special Note Attributes – Profile, Test Patch, Dry Film Thickness, Visual Sampling - Jobsite Lot – Quality Control Points Quality Measure - Inspection Pay – Accept/Reject
14
Contractor QC On Down the Road! Total Project QC Special Note for Contractor Quality Assurance Program
15
Contractor QC Potential QA/QC Projects Item No./Contract ID LettingRouteCounty 2-100.40May-07ET BreathittChristian 061233June-06ET BreathittHenderson 061022June-06W. Ford Butler-Grayson 061033Aug-06W. NatcherOhio 2-7000Jun-07US 41Christian 3-312Mar-07US 31WWarren 3-290.01Apr-07KY 880Warren
16
Contractor QC Potential QA/QC Projects – cont. Item No./Contract ID LettingRouteCounty 071110Mar-07KY 555 Nelson-Washington- Anderson 061257Oct-06I-75Grant 6-119.2Sep-07US 27Harrison 6-119.5Sep-07US 27Harrison 061234May-06New RouteKenton 061258Oct-06Somerset SW Bypass Pulaski
17
Contractor QC Potential QA/QC Projects – cont. Item No./Contract ID LettingRouteCounty 061226May-06I-64Boyd 061248Sept-06KY 30Laurel 12-901May-07KY 319Pike 061025June-06KY 80Knott 061239July-06KY 393Oldham
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.