OU’s 454 reagent cooling system To extend the life of the GS20 reagents for longer than 42 flows, we found it necessary to develop an apparatus for reagent.

Slides:



Advertisements
Similar presentations
Carry out PCR for 20, 25 and 30 cycles. Analyse the PCR fragments by agarose gel electrophoresis. Find out how the number of cycles affects the amount.
Advertisements

Sectional Assembly and Installation
Step-by-step assembly instructions
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
AC-SSC-1 Installation and operation manual
Safe Use and Operation of Vacuum Lines
Basic Refrigeration Cycle
Click on this image to open the full PDF document.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
Loading Gels. The Gel Box Electrode Lid Tray to hold gel Connect to power supply.
An Introduction to Microvolumetrics and Pipetting
BIODIGESTORES. Materials 1.1 PVC macho adaptor ½” 2.2 five gallon buckets with the bottoms removed 3.1 PVC hembra adaptor ½” 4.2 non-corrosive washers.
Dry Ice Lab. Warnings and precautions Dry ice is very cold (-78.5 o C, or o F) No direct contact with skin (use tongs, paper towels, gloves etc…
Scientific Lab Equipment graduated cylinder (graduate) To measure volume of liquids accurately.
Tank and Coil Chiller Setup. Equipment list  Bleach  Aquarium (min 10 Gal)  Chiller (there are several types)  Insulated box or some kind of tank.
HORIZONTAL CONVERSION KIT 4PXC*D Downflow to Horizontal Right
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
DISTILLATION Imelyn will show you how to set up for distillation. Scroll down.
Easy and inexpensive production of small quantities of 15 N 2 Step-by-step tutorial (Prepared by Juan-Pablo Hernandez) Step-by-step tutorial (Prepared.
Pneumatic Arm Assembly Instructions
Glass Jewel Box Final Project (option two) Beginning Glass Art Christine Burris.
Cautions! 1. Set pipet volume only within the range specified for that micropipet 2. Do not attempt to set a volume beyond the pipet’s minimum or maximum.
Experiment (4) Flow Measurement
The DB In-Line Pumpout Unit Easy-to-use control panel with one switch to run the unit. 15 AMP reset fuse. 115 AC External water pump and tank drain have.
Tank and Inline Chiller Setup. Equipment list  Bleach  Aquarium (min 10 Gal)  Chiller (there are several types)  Insulated box or some kind of tank.
Drink Up Live Long sabotage By: Chong Zhi Lin Derrick Fung Ethan Tan Gan Jia Jie Glen Vintario.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Method 3: Simple Distillation
Gold Table. Overview Water carries the crushed sample over the table top both disaggregating clumped material and providing a rough density separation.
Hydro-Electric Generator Manual Group number 403 Dan KJ Daewoo JT Group number 403 Dan KJ Daewoo JT.
Drying Extra slides Mahmoud Teaima, Ph.D..
Vanderbilt Student Volunteers for Science Fall 2011
Mounting Direction Water Cooler Best solution OK Risk of air bubbles in the system Heatsink Water channels Inlet Outlet.
THIN-LAYER CHROMATOGRAPHY Judith is preparing her TLC chamber, which is shown at left in the developing step #4. Scroll down for her to guide you through.
Air Conditioning Circuit
Kinetic Energy and Heat Transfer
Experiment 2 DISTILLATION AND GAS CHROMATOGRAPHY OF ALKANES.
2-d Insulation Analysis of Clamp / Vacuum Vessel Insulation crushing
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
Condensers and Evaporators
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
The OTHER TWO states of matter LIQUIDS A decrease in the average kinetic energy of gas particles causes the temperature to decrease. As it cools, the.
Up and Over Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
September 26, Students created a model of the water cycle by heating a beaker of water on a hot plate until it boiled. They carefully held a metal.
Ziplock Container and 2L Bottle System. Bill of Materials –3 screw top Ziplock Containers –3 empty 2L soda bottles –Aquarium tubing –Aquarium pump –4.
ASSEMBLING THE PCB Your PCB has two sides, a COMPONENT side and a TRACK side. The view below shows the component side.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
Volume Notes And a flow chart.
To return to the chapter summary click Escape or close this document. glencoe.com Image Bank Foldables Video Clips and Animations Standardized Test Practice.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
CASTING PROCESS.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
Fixed Orifice Tube Cycling Clutch System (FOTCC)
An Introduction to Microvolumetrics and Pipetting
Heating Ventilating and Air Conditioning
Pixel cooling specifications
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
BIODIGESTORES.
Step-by-step assembly instructions
The Cardiovascular System
Step-by-step assembly instructions
Step-by-step assembly instructions
Presentation transcript:

OU’s 454 reagent cooling system To extend the life of the GS20 reagents for longer than 42 flows, we found it necessary to develop an apparatus for reagent cooling. Implementing this cooling system has allow us to obtain highly accurate reads for control and sample DNA beads past 230 bases. This cooling system is composed of a 1/4" copper coil in an ice chest, a 3/16" copper tubing in the reagent tray, and a water pump all connected by 1/4" Tygon tubing. The ice chest is half filled with crushed ice plus one liter of water. The 3/16" copper tubing is routed around the large reagent bottles and then around the small reagent in the shape of an "M". After the bottles are placed in the reagent tray, the tubing is pushed down to the top of the separating ridges in the sunken bottle holders. Chilled water is then poured in the gap around the bottles until it covers the copper tubing.

In our home-made cooling system, composed of a 1/4" copper coil in an ice chest connected to 3/16" copper tubing in the reagent tray and a water pump by 1/4" Tygon tubing, water in the closed pumping system is chilled as it is pumped through the 1/4" copper coil in the ice chest. The water then flows to the 3/16" copper tubing in the reagent tray. After picking up heat from the reagents the water flows back to the pump where it starts another cycle. The 0.1amp AC cooling pump located in a plastic tray is placed just behind the Styrofoam ice chest

Top view of the reagent bottle holder with the 3/16” copper cooling tube The styrofoam ice chest containing the 1/4” copper cooling coil before and after adding ice & water to cover the cooling coil

Description of the waste removal component of the system To keep the waste water from heating up the reagents, we remove the waste from the sequencer during the run. This is accomplished by diverting the flow from the larger blue tube that is the drain for the primary pumps and the two smaller tubes that are the drains for the purge pumps to a 20 liter plastic bottle placed beside the Roche/454GS20 sequencer. Thus, one end of a 1/4" Tygon tube is placed in a 20 liter waste bottle beside the GS20 sequencer and the other end is inserted through the back vent of the sequencer behind the chiller compartment and connected to a 1/2" to 3/8" plastic elbow. This tube comes up in the back left corner of the reagent compartment of the sequencer - in the gap between the compartment and the rounded corner of the reagent tray and this reagent tray must be all the way back in the compartment, touching the back wall. The Tygon tube then was run horizontally across the back of the tray over to the waste opening in the back right corner of the reagent tray and attached to the 1/2" to 3/8" plastic elbow that collects the outflow from the 3 bundled, overflow sipper tubes. As the sipper assembly is lowered on to the reagent tray, the elbow is aligned with the three waste tubes on the assembly. The elbow rests in the 3cm gap between the waste opening in the tray and the bottom of the sipper assembly. The three waste tubes now drip into the elbow instead of reagent tray. The length of the tubing inside the sequencer must be carefully adjusted so that the tubing does not bow upward between the elbow and the back left corner of the compartment. Also, the waste liquid dripping into the elbow must have a downhill path out the back of the sequencer and down into the waste bottle. This system is shown on the next slide.

Drain tube diverter to re-route discarded liquid reagents to an external capture bottle Diverter and overflow tube placed so that the waste reagents flow to an external capture bottle instead of the hollow, white plastic bottle holder.

Finally an Aluminum plate is placed over the Sipper to prevent it and the reagent bottles from rising up when the bottles are surrounded by chilled water, the lid is closed as best it can be and the run is begun.